House construction in Batumi and Adjara

We build private houses, villas, guest houses and commercial buildings in Batumi, including Makhinjauri, Gonio and Kvariati, and along the Adjara coast as far as Chakvi and Kobuleti. We start by checking the plot, then do the design, get the permit and run the build through to handover. It works even if you live in another country: every week we send photos and video from the site, and you accept each stage by signing a certificate and pay once it is accepted.

from 1 200 ₾/m²The final price is confirmed once agreed.

Sections

Prices: construction

from 1 200 ₾/m²

WorkPrice
House shell (black frame), masonry690–840 ₾/m²
White frame (house ready for finishing)1 050–1 320 ₾/m²
Turnkey house, budget1 200–1 380 ₾/m²
Turnkey house, mid-range1 680–1 860 ₾/m²
Turnkey house, premium2 700–3 000 ₾/m²
Full house budget in Batumi (slope, design, comfort-class finishing)3 730–4 860 ₾/m²
Surcharge for building on a slope36–48 %
House design, full set of sections100–130 ₾/m²

turnkey house, economy level, per m² of floor area. The final price is confirmed once agreed.

We handle house construction in Batumi as a contractor: we build on your plot to your requirements, and we don't sell houses or apartments of our own. You can hire us for the whole process, from the land check to the handover of the finished house, or for one part of it, such as the design and the permit. You don't have to live in Georgia: the build can be run from another country.

What to check on a plot before you buy it

The mistakes that cost the most later are usually made when the land is bought. That is why we inspect a plot before you pay a deposit. We go to the site, film it and check:

  • The land category in the Public Registry extract: a foreigner cannot buy agricultural land, apart from narrow exceptions such as inheritance, but can lease it
  • Any mortgage or seizure, and whether the cadastral boundaries match the fence
  • The zone the plot is in, which sets the number of storeys, the setbacks from neighbours and the building lines
  • Access: a concrete mixer truck and a crane truck have to get through, even after a downpour
  • The nearest utility connections: if there are none, we include a borehole and a septic tank in the estimate straight away

We do the topographic survey and the ground survey before design work starts. The foundations and a good part of the estimate depend on the soil and the groundwater.

If the plot is on a slope

Sea-view plots in Makhinjauri, Chakvi and above Gonio are often on a slope. You can build there, but terracing and retaining walls have to be in the budget, and the ground survey should be done before you buy. We put drainage behind every retaining wall. Otherwise water collects behind it after heavy rain, and over time the wall cracks or starts to lean.

House design and seismic resistance

We start with a concept design: the layout, the facades and how the house sits on the plot, so that the windows face the sea rather than the neighbour's fence. Once the concept is approved, the structural engineer calculates the foundations, frame and floor slabs, and the other engineers plan the water supply, drains, wiring and ventilation. The layout is cheapest to change at the concept stage. On site, the same change means redoing the reinforcement.

Seismic resistance is built into the structural design. We work to the Georgian seismic building code (PN 01.01-09) and calculate the structure for the ground conditions on your particular plot. The calculation sets the size of the columns, the reinforcement and the ring beams in the masonry. A standard design can also work, but we adapt it to the plot and recalculate the structure.

Getting a building permit in Batumi

The procedure depends on the class of the structure. The Spatial Planning, Architectural and Construction Activities Code of Georgia divides buildings into five classes by level of risk: Class I only needs a notification, and Classes II–IV need a permit. A private house is usually Class II, and in Batumi the permit for it is issued by City Hall. A guest house or mini-hotel may fall into a higher class, so we check this at the concept stage.

How long it takes depends on the class and on how complete the documents are. The simplified procedure takes up to 10 working days, but we won't promise it, because a single comment on the design sends the application back for another round. Before applying, we gather the registry extract, the topographic survey, the ground survey, the design and the calculations required for your class. At the end we help with the official acceptance of the house into use, where it is required, and with registering it in the Public Registry.

What to build with by the sea

For a private house in Batumi we usually suggest a cast-in-place concrete frame: the columns and floor slabs are poured on site, and the walls between them are filled in with blocks. The frame carries the seismic load, while the infill deals with heat and sound. The downside is time and cost: formwork, reinforcement and the wait while the concrete gains strength.

  • Aerated concrete is light and warm, but it absorbs water. On site we keep the blocks under plastic sheeting, and on the outside they need a facade that keeps the rain off and lets vapour out.
  • Pumice blocks are heavier and hold fixings more securely, but quality varies from one manufacturer to another, so we first check each batch for size and strength.
  • Fired clay brick and clay blocks cope well with humidity, but they are slower and more expensive to lay.

We tie the masonry to the frame and reinforce it as the design specifies. This stops an infill wall from falling out of the frame in an earthquake.

House construction in Batumi with the climate in mind

Batumi gets more than 2,400 mm of rainfall a year, and humidity is usually 70–80%, higher in winter. By the sea there is also salt in the air, so metal rusts faster. That is why our designs include the following as standard:

  • Waterproofing of the foundations and plinth, with drainage and a paved apron around the house
  • Gutters, downpipes and stormwater drains sized for heavy downpours
  • A protective concrete cover over the reinforcement, and stainless fixings on the facade and roof
  • A ventilated facade or vapour-permeable render, so the wall can release moisture to the outside
  • Ventilation with extraction from the bathrooms and kitchen, otherwise condensation forms on the windows in winter
  • Windows with external sills and a properly sealed joint around the frame, because that joint is where wind-driven rain gets in

The weather also shapes the schedule. We don't pour concrete in heavy rain, we keep blocks and insulation under cover, and we allow for rainy days when we draw up the timeline.

Stages of completion: from shell to finishing

Black frame, white frame and green frame are market terms. The law does not define them, and contractors mean different things by them. The table shows how we use them for a private house, and the contract lists what each stage includes, item by item.

StageWhat's includedWhat's still to do
ShellFoundations, frame, floor slabs, external walls, roofWindows, building services, finishing
Black frameShell, windows, front door, utility connectionsPartitions, plaster, screed, internal pipework and wiring
White framePartitions, plaster, screed, wiring to every socket and light point, water and drains to the kitchen and bathroomsFinishing, sanitary ware, lighting, doors
TurnkeyFinishing, sanitary ware, lighting, doors, facade and landscaping as set out in the contractFurniture and appliances, unless they are in the estimate

A turnkey house is convenient if you won't be in Batumi while the finishing is done: one contract and one party responsible for the whole house. If the house is going to be rented out, we plan the finishing around rental use from the start.

Guest houses, mini-hotels and commercial buildings

A house to rent out is designed differently from a home for your own family. Every guest room needs its own bathroom, we put soundproofed partitions between the rooms, and we insulate the drain stacks so that nobody hears the neighbour upstairs at night.

We also plan the service areas: space for washing and drying, a linen store and a room for the water heaters. If part of the house stays for your own use, we provide separate utility connections and meters. The season in Batumi is short, so it helps to give each room a kitchen area, which makes it easier to let by the month in winter.

With a commercial building we start from how it will operate: floor loads, kitchen extraction, deliveries and parking. Once a building for rent is finished, you can hand it over to us to manage.

How to run a build from abroad

You don't need to come for every stage. You stay in touch with one project manager by phone and on WhatsApp during working hours, and a site foreman works on the plot. Every week we send a photo and video report, and on request the foreman joins a video call from the site.

We photograph concealed work before it is closed up: the reinforcement before the concrete is poured, the waterproofing before backfilling, the pipes and cables inside the walls. At the end you receive a handover file with routing diagrams, photos of the concealed work, a materials list with product codes and the warranty terms. A few years later, it lets you find any pipe or cable without opening up the walls.

Each stage is closed with an acceptance certificate. You review the report, send your own technical supervision engineer if you wish, and pay only after you accept the stage. We don't take prepayment for the whole job. The advance covers materials and the first stage.

The contract is drawn up in English, Georgian or Russian, your choice, and it also sets out how acceptance certificates are signed remotely. We give a 2-year warranty on our work and 5 years on concealed wiring, water pipes and drains in walls and floors. Materials and appliances carry the manufacturer's warranty, and we hand over the documents for them.

What goes into the price of a house

Guide prices per m² of total floor area on a flat plot: a masonry house at the black frame stage from 690 ₾, white frame from 1,050 ₾, and a turnkey house from 1,200 ₾ at economy level, from 1,680 ₾ at mid-range level and from 2,700 ₾ at premium level. The stages table above shows what each stage includes. A complete design package, covering all disciplines, is priced separately, from 100 ₾ per m². A house on a flat plot by the road and the same house on a slope with no access cost very different amounts: a slope adds 36–48% to the price, and the full budget for a house on a slope in Batumi, with the design and comfort-level finishing, comes to 3,730–4,860 ₾ per m². The estimate depends on:

  • The floor area, number of storeys and shape of the house, especially cantilevers and a complex roof
  • The terrain and the ground, and with them the retaining walls and the type of foundation
  • The frame design, wall material, facade and windows
  • Building services, plus a borehole and a septic tank where there are no mains connections
  • The level of finishing and the landscaping
  • Access and the distance from Batumi

We send a preliminary estimate from photos of the plot and a plan of the house within 24 hours on business days. The final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed. In the contract the price and timing are set out stage by stage, and a stage's price doesn't go up unless the scope changes.

How we work

  1. Plot check

    2–4 weeks

    We visit the site, read the Public Registry extract, and look at the zoning, access and utilities. We order the topographic survey and the ground survey.

  2. Design

    1–3 months

    Concept design, architectural drawings, the structural design with seismic calculations, and the building services design. We change the layout at the concept stage, while it is cheap.

  3. Permit

    1–2 months

    We determine the class of the structure, put together the document package and submit it to City Hall. The timing depends on the class and on how complete the documents are.

  4. Foundations and shell

    3–6 months

    Earthworks, foundations with waterproofing, the frame, floor slabs and walls. We photograph the reinforcement before every pour.

  5. Roof and facade

    1–3 months

    The roof with gutters, windows, insulation and the facade. After this stage rain can no longer get in, and work inside can go ahead.

  6. Building services

    1–2 months

    Wiring, water, drains, heating, ventilation and air conditioning. We photograph the pipe and cable runs before they are covered.

  7. Finishing and handover

    2–4 months

    Finishing, sanitary ware, lighting and landscaping. We hand over the house, the keys and the handover file against a signed form.

Comparisons

All comparisons

Concrete vs steel frame

Concrete or steel frame for a house by the sea: corrosion, earthquakes, noise between rooms, timing and repairs.

Concrete vs brick

Concrete frame or load-bearing brick walls: earthquakes, sea-view windows, weight, damp, noise and timing for a house in Adjara.

Aerated concrete vs brick

Light blocks or fired clay brick by the sea: water and the facade, seismic load, noise between guest rooms, fixings and build…

Light gauge steel vs timber frame

A light gauge steel or timber frame by the sea: salt and condensation, rot and mould, seismic load, noise, build time and repairs.

SIP panels vs timber frame

OSB and polystyrene panels or a frame with mineral wool: vapour and ventilation, leaks, noise, rodents and repairs.

Log house vs timber frame house

A timber wall out in the rain or a frame behind a facade: moisture, settling, upkeep, seismic load, noise and repairs by the sea.

Glulam vs solid timber

Kiln-dried glued layers or a solid log: settling and cracks in a humid climate, glue, build time, upkeep and price.

Flat roof vs pitched roof

Which roof copes better with downpours and infrequent checks, and when a roof terrace is worth it.

Questions and answers

How much does it cost to build a house in Batumi?

A turnkey house costs from 1,200 ₾ per m² of total floor area at economy level, from 1,680 ₾ at mid-range level and from 2,700 ₾ at premium level, and a masonry house at the black frame stage from 690 ₾. If the plot is on a slope, add 36–48%. The design is priced separately, from 100 ₾ per m². The estimate depends most on the terrain and the ground, the floor area and shape of the house, the facade and windows, and the building services. Two houses of the same size on neighbouring plots can differ in price because of a retaining wall and the foundations.

To get a figure for your own house, send us a sketch or plan and photos of the plot, and we'll send a preliminary estimate within 24 hours on business days. The final cost is set after a visit to the plot and once the estimate is agreed. In the contract the price is split into stages and doesn't go up unless the scope changes.

How long does it take to build a house?

Preparation often takes longer than it seems at the start. Checking the plot, the design and the permit usually take three to six months, and the foundations and shell take about as long again. After that come the roof, facade, building services and finishing, and we run some of this work in parallel.

The total time depends on the floor area, the terrain and the level of finishing. We write the timing of each stage into the contract and build in extra time for rainy weeks from the start.

Who issues the building permit, and what do you need from me?

For a private house within Batumi city limits, including Makhinjauri, Gonio and Kvariati, the permit is usually issued by Batumi City Hall. Chakvi and Kobuleti belong to Kobuleti Municipality, and Sarpi to Khelvachauri Municipality. We confirm which authority handles your class of structure before applying, and we put the document package together ourselves.

From you we need your passport, the documents for the plot and a power of attorney for one of our staff if you won't be in Georgia when we apply. Before work starts, we explain how to draw up the power of attorney in your country, so that it doesn't have to be redone.

Can you check a plot before I buy it?

Yes, and ideally before you pay a deposit. We go to the site, film it, read the Public Registry extract and look at what the zoning allows you to build. We check access for machinery and where the nearest utilities are.

We send you the findings in writing: what can be built, what work will be needed before the foundations, and what risks we see. On a slope we advise doing the ground survey before you buy: it costs less than a retaining wall you find out about too late.

Which is better for a house by the sea: aerated concrete, pumice blocks or a concrete frame?

In Batumi these materials usually work together. The load-bearing frame is cast-in-place concrete, which carries the seismic load, and the walls between the columns are filled with aerated concrete, pumice blocks or clay blocks.

Aerated concrete is warmer and lighter, but on site it has to be kept out of the rain, and on the outside it needs a good facade. Pumice blocks are heavier and hold anchors more firmly. Clay blocks take longer to lay, but they cope well with humidity. We choose based on the budget, the facade and whether you will live in the house in winter.

What level of seismic resistance does a house in Batumi need?

The level that the Georgian seismic building code requires for that location and that ground. The structural engineer calculates the load, and we don't do this calculation without a ground survey.

On site, seismic design shows in the reinforcement: the size and spacing of the bars, the joints between columns and floor slabs, the ring beams in the masonry. The foreman photographs all of this before the concrete is poured, and the photos go into the handover file. We don't make promises like "it will survive any earthquake": the house is designed for the load set by the code, and we promise nothing beyond the calculation.

Can the design be changed once construction has started?

Yes, but the further the build has gone, the more a change costs. Moving a wall on the concept drawings costs almost nothing, while after the floor slab is poured the same decision means demolition and a new calculation.

We record each change in a contract addendum: what changes, what it costs and how far the deadline moves. If a change affects the structure, the structural engineer checks it, and if it changes anything set in the permit, we start with the paperwork.

Do I need to come to Batumi during construction?

Not necessarily. We agree the design over video calls and submit documents under a power of attorney. Photos and video from the site arrive every week, and the foreman joins a video call whenever you ask. You accept each stage from the report and pay after signing the acceptance certificate.

It is still worth coming for the handover of the finished house. If you can't, your representative or an independent engineer can accept the house for you, and we hand over the keys and the handover file against a signed form.

Related articles

Terms used on this page

Black frame
A new-build apartment without finishing: concrete walls and slabs, windows, service inlets at the entrance, no partitions, screed or plaster.
White frame
An apartment after rough work: partitions, plaster, screed, electrical and water points, but no finishing or sanitary ware.
Green frame
An intermediate condition between white frame and a finished apartment: part of the finishing is done, and each developer sets the exact scope.
Public Registry extract
A document from Georgia's state registry: the owner, cadastral code, area, legal use and encumbrances of a property on the date of issue.
Handover certificate
The document by which an apartment, house or work is handed over; it records the property's condition, keys, meter readings and defects.

Send photos of your plot and a house plan for a preliminary estimate

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site