Renovation of a private house on a hillside near Batumi, with scaffolding and a new roof

House renovation in Batumi and Adjara: roof, facade, damp, services

A house by the sea is renovated from the outside in: first the roof, the gutters and drainage away from the foundations, then the walls and services, and the finishing last. Otherwise the new plaster in a room gets wet in the first downpour. We renovate detached houses, villas, townhouses and old houses in Batumi and along the Adjara coast, including houses on slopes, and we start by inspecting the whole house, from the loft to the basement.

from 960 ₾/m²The final price is confirmed once agreed.

All pages in this section

Cottage renovation

A house the family lives in through the winter too: renovation in phases, insulation and heating, its own water supply and septic…

from 690 ₾/m²

Villa renovation

A villa with a pool and terraces, often let to guests: leaking pool shells and terraces, glazing, large-format tiles and…

from 2 220 ₾/m²

Townhouse renovation

A house in a row with neighbours: noise through the shared wall, three levels and a staircase, heating floor by floor, and the…

from 810 ₾/m²

Country house renovation

A seasonal house by the sea or in the mountains: water from a spring or borehole, a septic tank, draining the system for winter…

from 540 ₾/m²

Old houses

A house that is half a century old or more: what to keep in it, how to stop damp in the walls, and what to do about the…

from 1 140 ₾/m²

Timber houses

A house of squared or round logs, or a timber frame by the sea: we look for rot and beetles, replace damaged wood, treat and…

from 840 ₾/m²

Full renovation

An old house that needs new floors, a new roof, strengthened walls and all-new services: the survey, the order of work and the…

from 960 ₾/m²

Interior finishing

A new house after construction: drying out the shell, walls and ceilings, ground-bearing floors, the staircase, bathrooms on two…

from 690 ₾/m²

Prices: house renovation

from 960 ₾/m²

WorkPrice
Interior finishing of a house from white frame690–900 ₾/m²
Full renovation of a private house960–1 320 ₾/m²
Premium villa renovation2 220–3 000 ₾/m²
Facade: render, insulation, decorative coat, painting63–84 ₾/m²
Laying water underfloor heating, labour48–60 ₾/m²
Plumbing point (water or drain)96–145 ₾/point

major renovation of a private house, labour and rough materials. The final price is confirmed once agreed.

Inspecting the house and listing defects

A house owner is responsible for everything at once: the roof, the facade, the foundations, the utility connections and surface water on the plot. That is why we start every house renovation in Batumi by walking round the whole house, even if only one room worries you. As with an apartment, we send a preliminary estimate from photos and a plan within 24 hours on business days. For a house it is rougher, and we work out the detailed estimate after the inspection. During the inspection the site foreman checks and photographs:

  • Signs of leaks in the loft, the rafters, the metal roofing and the flashings where the roof meets pipes and walls
  • Gutters and downpipes, and where water from the plot goes after a downpour
  • Cracks and loose render on the facade, the joints around windows
  • Damp, white efflorescence and a smell of mould in the plinth and basement
  • The consumer unit (fuse box), wiring and earthing
  • Pipes, water pressure, the septic tank or the sewer connection

The list shows what needs doing straight away and what can wait. It often makes sense to split the renovation into two phases: first the roof, gutters and drainage, then the finishing once the house no longer leaks. If you are not in Batumi, you can follow the inspection on a video call with the foreman.

House renovation in Batumi: dealing with rain and salt

We check the roof at the points where water gets in first: junctions with walls and chimneys, valleys, the ridge, the flashings over windows. Rainfall here is over 2,400 mm a year, and any gap in these places sooner or later shows up as a stain on a ceiling.

By the sea metal rusts faster, so we inspect the cut edges of the roof sheets and the fixings separately. We replace rusty screws with stainless or coated ones, otherwise leaks will start around them again.

Gutters must be able to cope with a downpour, and the water from them has to go into a storm drain or land drainage, away from the foundations. We repair facades with vapour-permeable materials. A damp wall under dense paint cannot let moisture out, so it comes through as stains inside the house.

Damp basement and plinth

Damp in a basement is treated according to its cause, and the causes vary. Water can come through the walls from the ground, rise from below, or settle as condensation on cold walls when warm, humid air gets into the basement.

If the water comes from outside, it is stopped with drainage and waterproofing on the ground side of the walls, which means digging out around the foundations. When that is not possible, for example in a townhouse with a shared wall, we waterproof from the inside. This is a compromise, and we discuss its limits before work begins.

New plaster won't cope with condensation: that needs ventilation and drying. In a basement used for storage, we fit mechanical extract ventilation or a dehumidifier that drains into the sewer. If there is an open-flue boiler, we fit extraction only after calculating the air supply.

Old wiring and building services

In a house where the wiring has not been replaced for decades, you find aluminium cable with no earth, old-style circuit breakers and twisted joints in junction boxes. The load has grown since then: air conditioners in each room, a water heater, a hob, a pump. We replace wiring like this completely, together with the consumer unit, RCDs and the earthing system.

If the supply capacity is not enough, it is increased through the network company, Energo-Pro Georgia. This is a separate procedure with its own timeline, so we settle the capacity question before any appliances are bought.

We check the water supply and drains all the way from the mains connection to the last tap. Old steel pipes are replaced, and the septic tank is inspected and, if needed, emptied or replaced. We install the water heater and pump where they can be reached for servicing.

A house on a slope and a house not lived in all year

Renovating a house on a slope costs more in labour. Scaffolding goes up on uneven ground, materials are carried up by hand or lifted by a truck-mounted crane, and an unpaved access road can be impassable after a downpour. We build all of this into the estimate and schedule from the start.

We look at retaining walls separately: cracks, any lean, whether water comes out of the drainage holes. If a wall holds up the ground under the house or a road, an engineer decides what to do with it.

A holiday home that is only lived in during summer stands empty and damp in winter. During the renovation we build in what protects it while the owners are away: a way to drain the water system for winter, a dehumidifier or an air conditioner with a drying mode, a ventilated underfloor space, and finishes that can handle moisture.

Detached house, townhouse, villa and timber house

A townhouse shares walls, and sometimes a roof, with its neighbours. We agree any work on shared parts with the neighbours before starting. The law allows noisy work in the daytime, from 08:00 to 23:00, but it is better to agree the hours separately with the neighbour on the other side of a shared wall.

In a humid climate, we check a timber house for rot from the bottom up: the lowest log courses, the floor joists, the beams over the basement. We treat the timber with preservative and fire retardant, and run wiring in timber walls in non-combustible conduit or on the wall surface.

With a villa or a large detached house, the scope easily grows into a full renovation: the roof, the facade, all the services, sometimes the pool and the grounds. We split this kind of renovation into phases, so that part of the house can still be used. If the work involves load-bearing walls, floor slabs or columns, design documentation and a permit come first, and adding a storey or an extension also starts with the paperwork.

Questions and answers

Where do you start when renovating an old house?

With an inspection and a list of defects. Tiles and paint are chosen later. The site foreman goes through the house from the loft to the basement and checks the roof, facade, damp, wiring and pipes, and we split the work into phases and price each one.

The first jobs are the ones that protect the house from water and fire: the roof, gutters, drainage away from the foundations, replacing dangerous wiring. It makes sense to start the interior finishing after these, otherwise the first leak or a cable replacement inside the walls will ruin it.

How do you get rid of damp in the basement of a house?

First, find out where the water is coming from. Stains at the bottom of a wall and white efflorescence usually point to water from the ground, while droplets on cold walls in warm weather point to condensation. Sometimes both causes are at work.

Groundwater is stopped with drainage and waterproofing on the outside of the foundations, or, if digging out is not possible, with waterproofing from the inside. Condensation is dealt with by ventilation and a dehumidifier. Without these measures, new finishes in a basement won't last: the new plaster will get wet just like the old.

When do you need design documents and a permit to renovate a house?

When the work affects load-bearing walls, floor slabs or columns, and when you add a storey or an extension. Within the city limits, permits for private houses are issued by Batumi City Hall; outside the city, we check the procedure with the municipality where the house stands. The timing depends on the class of the structure and how complete the documents are, so we don't promise it in advance.

We will tell you where the line between renovation and reconstruction lies after the inspection. Sometimes a new roof changes the height or shape of the house, and then the paperwork has to come first.

Can you renovate a house in winter?

Yes, if the work is planned around the weather. In Batumi it rains at any time of year, so we do the roof, facade and external waterproofing in dry spells, and sometimes move them to spring. Indoor work is hardly held up by the weather once the house is watertight.

In winter, plaster and screed take longer to dry, so we build extra time into the schedule and run dehumidifiers in the house. Starting in winter works well if you need the house ready for summer.

How can I keep track of a house renovation if I live abroad?

The same way as with an apartment. One project manager handles everything: you call them or message them on WhatsApp, and they reply during working hours. You get a report with photos and video every week, and on other days the foreman will show you the site on a video call if you ask. You accept stages by video and pay by stage: an advance for materials and the first stage, then payment after you accept each stage.

A house has more concealed work than an apartment: drainage, foundation waterproofing, cables and pipes in the ground. We photograph them before they are backfilled and covered, and the photos go into the handover file. Years later they show where to dig if a pipe on the plot needs repairing.

Send photos of the house and plot, and we'll tell you where to start

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site