Concrete house construction in Batumi: cast-in-place walls and slabs

We take on concrete house construction in Batumi where a concrete wall does the job better than masonry: a lower ground floor on a slope, walls that hold back the soil, a pool shell, a stair core, a house of three storeys or more. We pour the walls and slabs on the plot in formwork, to the structural engineer's seismic calculation. The shell costs from 1,110 ₾ per m². We schedule pours around the forecast, and we remove the props under a slab only once the concrete has gained strength.

from 1 110 ₾/m²shell: slab, concrete walls and floor slabs, stairs and roof, excluding windows and services. The final price is confirmed once agreed.

  • Timeline: the shell of a 200 m² two-storey cast-in-place concrete house with a basement usually takes 5–7 months, allowing for concrete curing and rainy weeks
  • Warranty: Concrete work has a 2-year warranty from the completion certificate
Get an estimate

Who it’s for

  • Your plot is on a slope in Makhinjauri, and the lower floor has to hold back the soil on the uphill side

  • You're building a house of three or four storeys or a mini-hotel, where the structural engineer calls for concrete walls

  • The pool and the plant room beneath it are being designed together with the house

  • You need a basement on a low-lying plot near the shore, where the groundwater is close to the surface

  • The house is masonry, and you only need cast-in-place floor slabs, stairs and ring beams from us

What’s included

  • a check of the structural design and the reinforcement schedule before materials are ordered
  • setting out the gridlines, a foundation slab with waterproofing
  • hire and erection of system formwork for walls and floor slabs
  • fixing the reinforcement on spacers, with the cover the design specifies
  • sleeves, cast-in fixings and openings in the walls to the engineers' drawings
  • ordering concrete with a batch certificate, pumping it into place and vibrating it
  • taking concrete samples and curing the concrete after the pour
  • stairs, floor slabs and roof to the design
  • photos of the reinforcement and formwork before every pour

Prices: cast-in-place concrete

from 1 110 ₾/m²

WorkPrice
Cast-in-place concrete house shell1 110–1 320 ₾/m²
Turnkey cast-in-place concrete house2 100–2 340 ₾/m²
Cast-in-place concrete wall, with materials (concrete, reinforcement, formwork)1 260–1 500 ₾/m³
Cast-in-place floor slab, 200 mm305–350 ₾/m²
Slab foundation (cast-in-place slab)880–985 ₾/m³
Formwork erection and striking (labour)39–48 ₾/m²
Placing concrete with vibration (labour, excluding concrete)90–110 ₾/m³
Cast-in-place reinforced concrete house frame without walls (foundations, columns, floor slabs, stairs)650–720 ₾/m²

shell: slab, concrete walls and floor slabs, stairs and roof, excluding windows and services. The final price is confirmed once agreed.

In Batumi a house is called monolithic when its load-bearing walls and floor slabs are reinforced concrete poured right on the plot. If only the columns, beams and slabs are concrete and the walls are built of blocks, that is a concrete frame with block infill, which has its own rules. This page is about solid concrete walls: where they are needed, how to pour them in the local weather and what to do so that salt from the sea doesn't reach the reinforcement.

Where solid concrete walls are needed

A concrete wall is heavier and more expensive than masonry, and building a whole one- or two-storey house from it usually makes no sense: a frame with block infill passes the same seismic calculation and costs less. We suggest solid concrete where a wall has to carry more than the weight of the floor slabs:

  • the lower ground floor and basement of a house on a slope, where the wall holds back the soil and keeps water out at the same time;
  • retaining walls that form part of the house itself, for example under a terrace on the sea side;
  • a pool shell and the plant room beneath it;
  • the stairwell and lift shaft: a concrete core makes the house stiffer in a tremor;
  • a house of three storeys or more, a mini-hotel or a low-rise apartment building, where the structural engineer specifies concrete shear walls.

The opposite case is a summer house, a guest cabin in the garden or a plot that a concrete mixer truck can't reach. There solid concrete turns out expensive, and we suggest a light frame or masonry. If you're unsure whether to use concrete or steel for a long span, the comparison of concrete and steel frames goes through it point by point.

How a cast-in-place concrete house works

At the bottom is a foundation slab or strip footing with reinforcement starter bars sticking out of it, and the wall reinforcement is tied to them. Each wall is reinforced with two layers of mesh, with extra bars around openings and at the corners, and the floor slab is poured over the walls of the storey, so the joint is continuous. The wall thickness, bar spacing and concrete class are set by the structural engineer from the seismic calculation and the ground survey, and we don't change them on site.

Reinforced concrete carries loads well, but it is a poor insulator. An uninsulated concrete wall is cold in winter, and in the local damp, condensation collects on its inner face. So we cover the external walls of the living floors with insulation and a facade. Which facade to choose, ventilated or rendered, we decide by the budget and by how exposed the house is to wind off the sea.

Formwork and reinforcement: what we check before the pour

Almost all the mistakes in cast-in-place concrete are made before the concrete arrives. After the pour they can only be put right with a jackhammer, so before every pour the site foreman goes through a checklist:

  • the formwork panels stand true to the gridlines and level, they are tied together and the gaps are sealed, otherwise the cement paste leaks out and leaves voids (honeycombing) in the wall;
  • the reinforcement sits on spacers, with a gap between the bar and the panel for the concrete cover specified in the design;
  • sleeves for pipes and cables and cast-in fixings for railings are in place in the wall, and the openings match the drawing;
  • there is no debris, wire offcuts or rainwater inside;
  • the props under the slab formwork stand on firm ground, not on soaked soil.

We photograph and film these points before the pour, and you see them in the weekly report. We usually hire system formwork: it is more accurate than home-made board formwork, the wall comes out flatter, and less plaster is needed afterwards.

Concrete house construction in Batumi in the rainy season

The heaviest rain here falls from September to January, and if construction started in summer, that is exactly when the slabs of the upper floors come due. A downpour on fresh concrete washes the cement out of the surface, and water that collected in the formwork before the pour weakens the bottom of the wall. So the pour schedule is tied to the forecast: we confirm the date with the concrete plant a day or two ahead and keep plastic sheeting and covers on site in advance.

We don't start a slab that can't be interrupted without a settled forecast: postponing a pour by a week costs less than deciding later what to do with concrete poured in a downpour. If rain does start halfway through, we bring the concrete up to the point where the structural engineer has allowed a construction joint and cover it. A slab must never be abandoned in the middle of a span.

In summer the problem is the reverse. In the heat a thin floor slab quickly loses water from its surface and gets covered in a network of fine cracks, so we pour slabs in the morning and then keep them damp for several days: we water them and cover them with plastic sheeting or hessian.

Gaining strength: when to strike the formwork

Concrete hardens over weeks. We usually strip the wall panels after one to three days, once the wall holds its shape, but the props under a floor slab stay in place until the concrete reaches the strength the structural engineer has specified. In summer this usually takes two to three weeks, longer in the cooler months. Concrete reaches its design strength in about 28 days, and until then we don't load the slab with pallets of blocks.

So as not to judge by eye, we take samples during the pour, and a laboratory tests them for compressive strength. We start the next storey when the slab below can bear the new formwork and the workers, and sometimes we leave some of the props in place under two floors at once. That sets the pace: one storey of a cast-in-place concrete house, including the time the concrete needs to cure, usually takes us 3–5 weeks.

Concrete by the sea: how to hold back the salt

Reinforced concrete near the shore ages because of salt, which over the years works its way through the concrete to the reinforcement. It can only be held back at the pour; after that it is a repair job. On sites by the sea we stick to a few rules:

  • the concrete class, its water resistance and the thickness of the cover are set by the design with an allowance for the nearness of the sea, and we don't substitute a cheaper mix on site;
  • we don't add water to the concrete on site, even if the crew asks: it makes the concrete easier to place, but it becomes porous;
  • we compact every layer with a poker vibrator, especially in corners and around congested reinforcement, where voids tend to be left;
  • for the first few days we keep the concrete damp, so there are fewer shrinkage cracks on the surface;
  • on balconies, parapets and canopies we form a fall and a drip, so that salty water doesn't run down the edge of the slab.

Basement walls on a low-lying plot near the shore stand in groundwater, and it can be brackish. For these walls the structural engineer selects the concrete and the external waterproofing based on a water analysis, which we order together with the ground survey. What else changes when the sea is next door is covered on the page about a house right on the shore.

How much a cast-in-place concrete house costs in Batumi

The shell of a cast-in-place concrete house costs from 1,110 ₾ per m² of floor area. This price includes the foundation slab, concrete walls and floor slabs, stairs and roof, together with the concrete, reinforcement and formwork. Windows, building services and finishing are not part of the shell, and with them a turnkey house costs from 2,100 ₾ per m².

If only the columns, floor slabs and stairs are concrete, a frame like that, foundations included, costs from 650 ₾ per m². Walls and roof are not in that price: they are priced separately, and block walls usually cost less than concrete ones. That's why we recommend solid concrete where a wall holds back the soil or acts as a shear wall, and more often build the rest of the house as a frame with infill.

The price goes up with a basement whose walls are in the ground and need waterproofing, with cantilevers and tall storeys, and with pumping concrete up a slope or along a narrow street. It comes down with a simple shell and repeated storeys, where one set of formwork is used several times. We send a preliminary estimate from photos of the plot and a plan of the house within 24 hours on business days, and the final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed.

Stages and timelines

  1. Design review

    1–2 weeks

    We check the structural design against the ground survey, calculate the concrete and reinforcement, and plan the pours around the season.

  2. Foundations

    3–5 weeks

    Excavation, blinding, waterproofing and a foundation slab with reinforcement starter bars for the walls.

  3. Walls of a storey

    2–3 weeks

    Reinforcement, formwork, sleeves and cast-in fixings, pouring with vibration. We send photos of the reinforcement before the concrete goes in.

  4. Floor slab

    1–2 weeks

    Formwork on props, bottom and top mesh, a morning pour, then several days of keeping the concrete damp.

  5. Curing and the next storey

    2–3 weeks

    The props stay until the concrete gains strength, and meanwhile we fix the wall reinforcement for the next storey.

  6. Roof and shell handover

    3–6 weeks

    Roof with gutters, parapets and canopies with drips. We hand over the shell against a completion certificate.

Local specifics in Batumi

In Batumi concrete is delivered by mixer trucks from ready-mix plants, and in the season a truck heading for Gonio or Kvariati gets stuck in traffic. So we schedule pours for early morning, and for a slope in Makhinjauri or Chakvi we work out in advance how the concrete will be placed. A truck-mounted boom pump needs space by the fence, and if there isn't any, we run a pipeline from a static pump.

The second constraint has to do with water. On low-lying plots near the shore the groundwater is close to the surface, and we keep pumping out a basement excavation for as long as work is going on below its level, otherwise the water rises under the fresh slab. Mountain Adjara has its own difficulties: a mixer truck from Batumi takes a long time to get there, so we find out in advance which plant to bring the concrete from and how long it will be on the road, and in winter we postpone pours because of frost or heat the concrete.

Materials and brands

We order concrete from a ready-mix plant with a certificate for every batch: the strength and water resistance classes are set by the design, and on site we check them against the delivery note. The reinforcement is ribbed bar in the classes and diameters of the structural engineer's schedule, and the spacers are plastic, so that no broken brick or piece of wire ends up under a bar.

We use system formwork, and for stairs and curved walls we build it from laminated plywood. For walls in the ground we use a brush-on waterproofing from the Ceresit or Mapei ranges or a sheet membrane, and we insulate the plinth with extruded polystyrene, which isn't harmed by damp soil.

What makes up the cost

Timeline: the shell of a 200 m² two-storey cast-in-place concrete house with a basement usually takes 5–7 months, allowing for concrete curing and rainy weeks

  • the concrete class and reinforcement to the structural engineer's calculation

What raises the cost

  • a basement and walls in the ground with waterproofing and drainage
  • pumping concrete up a slope or along a narrow street
  • cantilevers, long spans and tall storeys
  • pours in the rainy season, with covers and postponements

What lowers the cost

  • a simple shell with repeated storeys
  • access for a mixer truck and space for a pump by the fence

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

Concrete work has a 2-year warranty from the completion certificate. We photograph the reinforcement, spacers and cast-in fixings before every pour, and these photos go into the handover file. If we lay the water pipes, drains and wiring in the walls and floors, they carry a 5-year warranty, and materials are covered by the manufacturer's warranty.

Questions and answers

How much does a cast-in-place concrete house cost per m² in Batumi?

The shell of a cast-in-place concrete house costs from 1,110 ₾ per m²: foundation slab, concrete walls and floor slabs, stairs and roof, including the concrete, reinforcement and formwork. Windows, building services and finishing are not included in this price, and a turnkey cast-in-place concrete house costs from 2,100 ₾ per m². A 200 mm cast-in-place floor slab on its own costs from 305 ₾ per m².

The price is driven most by the basement, the storey heights, the shape of the house and how the concrete can be delivered to the plot. We send a preliminary estimate from a plan within 24 hours on business days, and the final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed.

What should you do if a slab was poured in the rain?

First, find out how badly the concrete was affected. If the rain fell on a surface that had already set, usually only the top layer suffers: it becomes friable and dusty. It is ground off and levelled with a repair mortar or a screed. It is worse when the downpour began halfway through the pour, water stood in the formwork and the concrete kept being poured.

In that case the samples taken during the pour are tested, and if there are none, a laboratory drills cores from the slab and checks their strength. Based on the results, the structural engineer decides whether to leave the slab as it is, strengthen it or take it down. We don't remove the props under such a slab until that decision is made.

Why are there voids in a concrete wall after the formwork comes off?

Usually for one of three reasons: the concrete was poorly vibrated, cement paste leaked out through gaps in the formwork, or the mix was too stiff for congested reinforcement. Small pores on the surface are not dangerous; they are filled with repair mortar before finishing.

If a void is deep and the reinforcement shows in it, that is a structural defect. We photograph the spot and show it to the structural engineer, who decides how to repair it. It can't simply be covered with plaster and forgotten: by the sea, salt quickly reaches the steel through exposed reinforcement.

Can a cast-in-place concrete house be insulated from the inside?

We don't recommend it. With internal insulation the concrete wall stays cold, and warm, moist air from the room reaches it through gaps in the insulation. In winter condensation forms there, and behind the lining you can't see it until mould and a smell appear.

We put the insulation on the outside: then the concrete stays on the warm side and doesn't get damp from inside, and its mass evens out temperature swings in the rooms. We insulate from the inside only where the outside can't be reached, for example on a wall right up against the neighbour's house, and in that case we fit a continuous vapour barrier and ventilation in that room.

How do you check the concrete delivered to site?

You start with the delivery note: it shows the concrete class, the volume and the time the mixer truck left the plant. If the truck spent longer on the road than the plant allows, we reject the concrete. On site we check the workability of the mix with a slump test and take samples, which a laboratory tests later.

Then you look at what is done with the concrete on site. We don't allow the mix to be thinned with water on site, and we compact every layer with a vibrator. Photos of the delivery note, the slump cone and the samples come to you in the report along with the photos of the reinforcement before the pour.

Further reading

Send us a house plan and the ground survey, and we'll price a cast-in-place concrete shell within 24 hours

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site