Design by room
Kitchen-living room, bathroom, bedroom, child's room, hallway and balcony: what each room needs in a humid climate and a small…
from 330 ₾/room
We do interior design projects for apartments and houses in Batumi and along the Adjara coast, to live in or to rent out. A project includes a measured survey, layout options, 3D renders and working drawings, so the crew builds without guessing dimensions on site. We can work with you remotely: meetings by video, files and comments in a shared folder. If we also do the renovation, you can order designer supervision until the work is finished.
from 45 ₾/m²The final price is confirmed once agreed.
Kitchen-living room, bathroom, bedroom, child's room, hallway and balcony: what each room needs in a humid climate and a small…
from 330 ₾/room
Minimalist, loft, classic, Japandi, boho and other styles: what we change for humidity, cleaning and rental photos.
from 75 ₾/m²
What the project includes for a studio, 1+1, 2+1 and 3+1, timing by floor area, and how the renovation estimate is priced from the…
from 145 ₾/m²
Interiors for a private house or villa: zones floor by floor, the staircase, boiler room and ventilation, 3D and drawings…
from 120 ₾/m²
Zoning one room, a kitchen in full view, storage and lighting: how we design a 25–40 m² studio to live in or to let.
from 4 760 ₾/project
A layout for guests, photo angles, materials for frequent cleaning and changeable accents: designing an apartment that is let…
from 130 ₾/m²
The project and the building work with one team: an estimate from the materials list, the designer and the foreman in one chat…
from 1 040 ₾/m²
A measured survey without you flying in, video meetings, sheets and comments in a shared folder, samples in daylight and stages…
from 120 ₾/m²
A short apartment design project in a few weeks: which sheets the crew gets, what it decides on its own and when the fast format…
from 57 ₾/m²
A measured survey, options for placing the walls and furniture, and a final plan for marking out partitions that works around the…
from 45 ₾/m²
Before and after plans, demolition and construction, opening details and the structural engineer's decisions: the set of sheets…
from 3 600 ₾/project
A model built from the measured survey, materials from the materials list, daytime and evening light. We agree the camera…
from 210 ₾/pc
Which sheets the crew needs, who works from each one, why dimensions are taken from the finished floor level, and how the foreman…
from 78 ₾/m²
The designer’s visits at key stages of the renovation, decisions on site, new versions of the sheets, and checks of the finishes…
from 48 ₾/m²
Tiles, flooring, paint, sanitary ware and doors in one materials list: product codes, shops, quantities and delivery times. We…
from 37 ₾/m²
Furniture, lighting without new wiring, textiles, artwork and plants for a finished apartment: a concept, a shopping list and a…
from 49 ₾/m²
Light calculated zone by zone, scenes, groups and heights: sheets the electrician runs the cables from and you buy the light…
from 720 ₾/project
Cladding, colour, windows, railings, fencing and lighting for your house in 3D and elevations, with solutions for the coast and…
from 3 900 ₾/project
A plot on a slope: where the water goes, retaining walls, plants for the subtropics, a lawn with automatic irrigation and lighting…
from 14 ₾/m²
Zones, shade and furniture that stand up to the wind off the sea, planters with irrigation and details at the outlets: a terrace…
from 3 120 ₾/project
Offices, shops, cafes, hotels, clinics and salons: zoning around how the business works, a package for the landlord and drawings…
from 93 ₾/m²
Interior design in Batumi starts with a measured survey and a conversation about who will live in the apartment. An apartment for your own family and one for short-term rental need different layouts and materials, so we need the answer before the first sketch.
During the survey we record the walls, windows and ceiling heights, the risers (vertical water and drain pipes) and the ventilation shafts. The risers and shafts serve the whole building and cannot be moved, and they decide where the bathroom and kitchen can go. At the first meeting we also ask about your renovation budget: a design you cannot afford to build is of no use to you.
The easiest time to start is while the apartment is still in frame condition and the partitions can go up exactly where the design puts them. For a house or villa, start even earlier, while the house itself is being designed.
A full project is made up of the layout, the visual concept and the working drawings. The images show how the apartment will look, and the drawings tell the crew what to build and where.
We price the renovation straight from the materials list, so you know the cost of the work before it starts. Any crew can build from the drawings, because every dimension is on them. For a studio meant for short-term rental, a layout and an electrical plan are sometimes enough, and we'll tell you at the first meeting if that is the case.
Guests choose a short-term rental by its photos. In every room we plan a good photo angle from the doorway, several lighting scenes and a calm base that lets the textiles stand out. The accents are easy to change, so worn cushions and curtains can be replaced in a day.
An apartment like this also has to be quick to clean between guests. We keep open shelves and small decor to a minimum and choose a wall-hung toilet and vanity unit so the floor underneath can be mopped. We also leave room for suitcases and a closed cupboard for linen. Floors are SPC vinyl or porcelain tiles, and the walls get washable paint.
A long-term rental has different priorities. A tenant spends months in the apartment and needs a proper kitchen, a place to work and wardrobes that hold clothes for every season. The "minimalism or cosiness" debate has a simple answer: a short-term rental has to look good in photos, and a long-term one has to be comfortable to live in.
We don't promise a higher nightly rate, because that depends on the area, the season and how the apartment is managed. What you can see in advance is what the materials will cost and how often they will need replacing.
Humidity here is usually 70–80%, and higher in winter, so the choice of materials allows for it from the first sheets of the project. We don't lay solid wood or laminate in wet areas or by the balcony door. We don't hang wallpaper on external walls, and we leave a gap between those walls and the furniture, because mould grows behind a wardrobe pushed right up against a cold wall.
We order furniture made from moisture-resistant board with banding on all its edges, and choose water-resistant cabinet fronts for the sink area and the bathroom. For exposed metal by the sea we use stainless steel or aluminium, since salt speeds up corrosion. We pick textiles with removable, washable covers.
Air conditioners, extractor fans and fresh-air inlets go into the drawings from the start, together with their pipe routes and drains. If the condensate drain of an air conditioner is forgotten, its pipe later ends up running over the finished walls.
Under the rules in force in autumn 2026, renovating and finishing an apartment, including moving partitions, needs no permit as long as the load-bearing structure is not touched. Load-bearing walls, floor slabs and columns can only be altered with a structural design and a permit. An opening in a load-bearing wall first needs calculations under the Georgian seismic building code.
Some limits come from the building's services. A bathroom far from the riser needs its drain pipe laid on a slope, which means a raised floor and a step at the door. We try to keep the kitchen next to the riser, and we advise against a bathroom above the neighbours' living space: a leak from it would be expensive for them and for you.
Before drawing a layout change, we study the building plan and, if they exist, the structural drawings. They show which walls are load-bearing, so the layout doesn't have to be redone after the first attempt at demolition.
The whole project can be done remotely, with you taking part by video and through a shared folder. This is how it works:
One project manager runs the whole project and is available by phone and on WhatsApp during working hours. We can also do the renovation, and then you get a photo and video report from the site every week and a video call with the foreman on request.
A drawing doesn't answer every question that comes up on site. Sometimes a riser is not where the developer's plan shows it, or a ventilation duct gets in the way of the planned ceiling. Then the interior designer comes to the site, decides on the spot and corrects the sheet, and the foreman carries on from the revised drawing.
For procurement, we select and order everything on the materials list. Deliveries are fitted into the renovation schedule: the kitchen should arrive after the tiling and the doors after the painting, otherwise they have to be stored in the apartment among the dust.
Design and a turnkey renovation are easier to order from one team. The designer and the foreman go through the drawings together before work starts, the estimate is priced directly from the materials list, and you won't have to work out who is to blame when the work on site differs from the design.
The stage times on this page are for a one-bedroom (1+1) apartment. A studio goes faster and a house or villa takes longer, and how quickly you approve each stage makes a noticeable difference.
The number of revision rounds in each stage is written into the contract before work begins. You send your comments as one list per round, and we reply with a summary of what we have changed. When you are happy with a stage, you sign the acceptance certificate and we move on to the next one.
We draw up the contract in English, Georgian or Russian, your choice. You pay stage by stage, and we don't take prepayment for the whole project. The contract also sets out how a drawing error found during the renovation is put right and who is responsible for it.
2–3 days
We measure the apartment and record the risers, ventilation shafts and ceiling heights. We discuss the renovation budget and who will live in the apartment or who you plan to rent it to.
1–2 weeks
We prepare two or three layout options with the furniture in place. You choose one, and the rest of the work builds on it.
2–3 weeks
We put together a mood board and agree on the look and the materials with you, then make 3D renders of the rooms.
2–3 weeks
We draw the partitions, wiring, lighting, plumbing and tile layout and compile a materials list with product codes. The renovation estimate is priced from this list.
2–4 weeks
We select and order finishes, sanitary ware, lighting and furniture, and fit the deliveries into the renovation schedule.
the whole renovation
The designer visits the site at the main stages of the renovation and answers the foreman's questions. Supervision continues for the whole renovation.
When a space plan is enough and when you can't do without working drawings: estimate, timing, made-to-measure furniture…
Who you need to renovate an apartment, alter load-bearing walls or build a house, and how a designer works with an architect.
What a collage shows, what 3D adds and how to combine them: scale, light, revisions, remote approval and the rental photo.
A full design project with a layout, 3D renders and working drawings costs 145–190 ₾ per m² of floor area. A layout on its own costs less, from 45 ₾ per m², and we price designer supervision and procurement as separate lines. We give the final cost after seeing a floor plan or measuring the apartment, once the floor area and the scope of work are clear, and agree it with you in the estimate.
The cost depends on layout changes, made-to-measure furniture and the number of rooms to be shown in 3D. A studio for short-term rental is usually simpler than an apartment for your own family: there are fewer decisions, and many of them are standard.
Yes. A space plan includes a measured plan, two or three options for placing the walls and furniture, and a final plan with dimensions. An electrical plan is often added so that sockets aren't put in at random.
A space plan on its own is enough when the finishes are simple and the furniture is bought ready-made. You need a full project when you are moving walls, ordering a kitchen and wardrobes made to measure, or won't be coming to the site during the renovation. Without drawings the crew makes the decisions on site, and not always the way you would.
For a one-bedroom (1+1) apartment, the layout takes 1–2 weeks, the concept and 3D take 2–3 weeks, and the working drawings and materials list another 2–3 weeks. A studio goes through these stages faster, and a house or villa takes longer, because it has more rooms and more building services.
What usually stretches the timeline is waiting for approvals. That is why we send all the materials for a stage at once and agree on a date by which you will send back your comments.
Yes, and it is a good time to start. In a black frame apartment, the partitions and outlets go in exactly as designed. In a white frame apartment, we compare what the developer has built with the layout and decide what to keep.
Until the building is handed over, we work from the plans in your contract with the developer, and once you have the keys we check them with a measured survey: built dimensions almost always differ slightly from those on paper. For a private house, it makes sense to develop the interior design together with the building services design, so the routes for air conditioning and wiring go where they are needed from the start.
Yes. You don't need to come for the measured survey or for approvals: we do the survey ourselves and take the keys against a signed handover form. Meetings are held by video at a time that suits you, the files are kept in a shared folder, and you sign the contract and the stage acceptance certificates remotely.
If you want to hold the tiles and fabrics in your hands, one trip is enough: we'll gather samples of the main materials in one place for your visit. If you can't come, we'll film them in daylight.
These are the designer's visits to the site to make sure the apartment turns out as designed. The designer checks the setting-out of partitions, the wiring before the walls are closed up, the tile layout and the measurements for furniture, and decides what to do when the work on site departs from the drawings.
You can do without supervision if the renovation is simple and you visit the site often yourself. If you live in another country and the project includes made-to-measure furniture and complex lighting, then without supervision the crew will settle the open questions on its own.
Yes, this is procurement. Working from the project's materials list, we select finishes, sanitary ware, lighting and furniture, agree each item with you along with its price and delivery time, and only then place the order.
On delivery we check the goods before signing the delivery note, so a wrong shade or a chip is spotted straight away, not after installation. You can buy some items yourself: we'll give you the exact sizes and product codes so that a wardrobe fits its recess without trimming.
As many as the contract says: we agree the number of rounds for each stage with you in advance. Within a round, inside the approved layout and concept, you can change colours, materials, furniture and lighting.
If, after approval, you decide to change the whole layout or style, that is new work. We tell you its timing and cost in advance and start only once you agree. This way the project has a clear end, and you know what you are paying for.
We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.
Mon–Fri 10:00–19:00, Sat 11:00–16:00