Apartment and house renovation in Batumi

We renovate apartments and houses in Batumi and along the Adjara coast, from Sarpi to Kobuleti: new builds in black or white frame, resale apartments, homes to live in or to rent out. We send a preliminary estimate from photos and a floor plan within 24 hours on business days. The contract sets out price and timing stage by stage, and you pay by stage too. You don't need to be here for any of it: every week you get a photo and video report from the site.

from 210 ₾/m²The final price is confirmed once agreed.

Sections

Services

Apartment renovation

New builds in frame condition and resale apartments: the order of work, the owner's decisions by stage, the price per m² and…

from 210 ₾/m²

Furnishing

We buy, take delivery of, assemble and place furniture, appliances, lighting and textiles from a list you approve. From 360 ₾ per…

from 360 ₾/m²

Prices: renovation

from 210 ₾/m²

WorkPrice
Cosmetic renovation210–300 ₾/m²
Full apartment renovation570–780 ₾/m²
Turnkey renovation from white frame570–720 ₾/m²
Turnkey renovation with mid-range materials900–1 200 ₾/m²
Designer renovation930–1 320 ₾/m²
Full renovation of a private house960–1 320 ₾/m²
Office renovation660–960 ₾/m²

The final price is confirmed once agreed.

Where a renovation starts and what state the apartment is in

We start every apartment and house renovation in Batumi with an inspection, because the estimate and the timeline depend on the condition of the property. In a new build, renovation almost always starts from black frame, white frame or green frame. These terms are not defined in law, and what each one includes is set out by the developer in its contract.

ConditionWhat is already doneWhat we do
Black frameThe load-bearing frame, floor slabs and external wallsWe put up partitions, run the wiring and water pipes, lay the screed, plaster the walls and do all the finishing
White framePartitions, plaster, screed, water and drains in the kitchen and bathroom, often the windows and front doorWe check that walls and floors are level and square, run the wiring, move pipe outlets, do the waterproofing and finishing
Green frameWhite frame plus some finishing, chosen by the developerWe check it against the contract and finish the rest

In a resale apartment, the first steps are strip-out and a check of the riser pipes, wiring and screed, and in older buildings the floor slabs too. Only then is it clear what can be kept. Each option for apartments, from the three types of frame to resale, is covered in detail on the page about apartment renovation in Batumi.

What a turnkey renovation includes

At the end you get an apartment you can move into with just a suitcase: the finishing is done, the appliances are connected and there is no dust. In the estimate, this means the following work:

  • Strip-out and waste removal
  • Partitions, plastering to guide beads for flat walls, screed
  • Rough electrical and plumbing work, waterproofing of the bathroom and balcony
  • Ceramic and porcelain tiles, flooring, doors, stretch ceilings
  • Final electrical and plumbing work, air conditioners, extractor fans
  • A made-to-measure kitchen and wardrobes, appliances and lighting from an agreed list
  • Cleaning after the renovation

In resale apartments we do both cosmetic renovations and full renovations with new pipes and wiring. When there is a full interior design project, we work from the designer's drawings and materials schedule. Under the rules as of autumn 2026, moving partitions does not need a permit as long as the load-bearing structure is not affected. We also renovate private houses and commercial premises: house renovation and commercial renovation each have their own section on the site.

Apartment and house renovation in Batumi if you live outside Georgia

You don't have to come to Batumi for the renovation, but the way we work together needs to be agreed before the first payment. This is how we run a project remotely:

  1. The developer, an agent or someone you know hands over the keys, and we take them against a signed handover form, with a video of the apartment and the meter readings.
  2. After the site measurement you receive the detailed estimate and a schedule, and you sign the contract without travelling to Batumi.
  3. The site foreman keeps the keys, and we agree the list of tradesmen and the waste removal with the building's reception or security.
  4. Every week you get a photo and video report on WhatsApp, and you see concealed work in the photos before it is closed up.
  5. You accept each stage by video: the foreman, with a spirit level and a tape measure, shows you whatever you ask to see.
  6. At the end we return the keys, again against a signed form, together with the handover file.

The acceptance certificates are signed by you or by someone you have asked to do it for you. We write into the contract how you confirm things from a distance, so there is no argument later about whether a message in a messenger app counts as a signature.

Renovating with humidity and sea salt in mind

Batumi gets more than 2,400 mm of rain a year, and humidity is usually 70–80%, higher in winter. Damp finds every weak spot, so some things are in our estimates by default:

  • In bathrooms, cement-based mixes, moisture-resistant plasterboard and waterproofing around the shower
  • Grout and silicone with antifungal additives, and an antifungal primer on external walls
  • Extractor fans with a non-return valve, and fresh air inlets in bedrooms
  • Porcelain tiles or SPC vinyl flooring where laminate would swell over time
  • Stainless fixings on balconies, because the salt air by the sea speeds up corrosion
  • Splash-proof sockets on the balcony and in the bathroom

We don't renovate a bathroom without waterproofing, even in a resale apartment where the owner only asks us to replace the tiles. Before laying the floor, we check the moisture in the screed with a meter, because in the wet season it takes longer to dry. An empty apartment needs airing in winter, or a dehumidifier left running.

What makes up the cost, and why the estimate doesn't go up

Guide prices per square metre are in the price table on this page. A cosmetic renovation costs from 210 ₾ per m², covering labour and basic materials. A full apartment renovation or a turnkey renovation from white frame starts from 570 ₾ per m²: this covers labour and materials for the rough work, while finishing materials are priced separately. A turnkey renovation with mid-range finishing materials costs from 900 ₾ per m², without furniture. A full renovation of a private house, with materials, starts from 960 ₾ per m².

These are starting prices, not an estimate for your apartment: two 1+1 apartments (one bedroom plus a kitchen-living room) of the same size can easily end up with estimates several times apart. The final cost is set after the site measurement, once you have agreed the estimate, which we draw up item by item. The total depends on:

  • The starting condition: a new build in black or white frame, or a resale apartment that needs stripping out
  • The number of wet areas, because a square metre of bathroom costs more than a square metre of bedroom
  • The number of electrical points
  • The grade of tiles, sanitary ware, doors and flooring
  • Niches, multi-level ceilings, concealed doors, moving wet areas
  • Made-to-measure furniture and appliances
  • The building itself: a service lift, space for unloading, the hours allowed for noisy work

The price of each stage is written into the contract, and it doesn't go up unless the scope changes. Any change in scope is agreed in writing and in advance. You pay by stage: an advance for materials and the first stage, then payment after you accept each stage. We don't take prepayment for the whole job.

Renovating to rent out: short-term and long-term

We plan a rental apartment around who will live in it and for how long. For short-term (daily) rental, we think first about wear and cleaning:

  • Porcelain tiles or SPC vinyl flooring, and a worktop that can take hot pans
  • Few open shelves, a wall-hung toilet and a shower with a floor drain
  • An air conditioner in every room, blackout curtains, sockets by the bed
  • Space for suitcases and a lockable cupboard for linen
  • An electronic lock, so guests can check in without being met

A long-term rental needs a proper kitchen, wardrobe space for all seasons and a place to work, plus a washer-dryer because of the humidity. In Batumi it often works well to rent by the day in summer and by the month in winter. Most tourists come between July and September, and in winter short-term occupancy drops.

We don't promise any income. Work it out down to the net figure, after commissions, utility bills, cleaning and tax. For short-term rental, agree the tax regime with a tax adviser. The figures in market advertising are often given before these deductions.

How long a renovation takes and what it depends on

The stage durations on this page are for a renovation from white frame in a typical 1+1 apartment. We give the overall timeline after the site measurement and set it out in the contract schedule.

Starting from black frame takes longer, because partitions, plaster and screed are added, and the screed needs time to dry. Part of the timeline depends on you: until the tiles are chosen, the crew has to wait on that part of the job.

We do noisy work in the daytime, which by law runs from 08:00 to 23:00. Some buildings set shorter hours in their own rules, and we keep to them. If the apartment has to be ready for the summer season, start the renovation in winter or early spring and leave time for furniture deliveries.

Documents, the handover file and the warranty

After the renovation you keep the contract with the estimate, the stage acceptance certificates, the receipts and the handover file. The file contains routing diagrams for the wiring and water pipes, photos of concealed work, a materials list with product codes and the warranty terms. With the routing diagram, you can put up a shelf without drilling into a cable.

We give a 2-year warranty on our work and 5 years on concealed services: wiring, water pipes and drains in walls and floors. Materials and appliances carry the manufacturer's warranty, and we hand over the documents for them. The warranty does not cover damage caused by occupants, leaks from neighbours or alterations by other tradesmen.

Receipts and certificates are useful when you sell. Under the 2026 rules, a home owned for more than 2 years can be sold without tax. If you have owned it for less, you pay 5% of the difference between the sale and purchase prices, and documented renovation costs reduce that difference.

Accepting the apartment from the developer before renovation

We inspect the apartment before you sign the developer's handover certificate. You watch the inspection by video and sign the certificate yourself or through a representative. Once renovation has started, it is hard to prove that a crack in the screed was there before you, so at handover we check:

  • Whether the screed and walls are level, and any cracks or hollow spots under the screed
  • Windows and the balcony door: sashes, seals, water marks on the reveals
  • The front door, the consumer unit (fuse box), and the water and drain outlets
  • The draught in the ventilation ducts and the slope of the balcony floor
  • Room sizes and ceiling heights against the plan in the contract
  • Whether the frame condition matches the annex to the contract

We write up the defects as a list with photos and measurements, and you pass it on to the developer. The same inspection gives us the data for the estimate. We also do this check before you buy a resale apartment, so that you know the state of the pipes and wiring before the transaction.

How we work

  1. Photos, plan and preliminary estimate

    1 day

    You send photos, a floor plan and your wishes on WhatsApp. Within 24 hours on business days you get a preliminary estimate.

  2. Site measurement and detailed estimate

    3–5 days

    The site foreman comes to the property, measures the walls and floors, and checks the pipe and cable connection points and the condition of the frame. From the measurements we prepare a detailed estimate broken down by stage.

  3. Contract and schedule

    1–3 days

    We sign the contract in English, Georgian or Russian, your choice. It sets out the price and duration of each stage and the payment schedule.

  4. Rough work

    3–5 weeks

    We run the wiring and plumbing, level the walls and do the waterproofing, and in a black frame apartment we also build partitions and lay screed. The time shown is for a one-bedroom (1+1) apartment from white frame.

  5. Finishing

    4–6 weeks

    We lay tiles and flooring, paint the walls, install ceilings and doors, and fit sanitary ware and light fittings. You sign off each stage with an acceptance certificate, in person or by video.

  6. Furniture and appliances

    3–5 weeks

    The kitchen and wardrobes are made to measurements taken after tiling, and we connect the appliances to the connection points laid in earlier. Some of this work runs alongside the finishing.

  7. Cleaning, sign-off and handover file

    2–3 days

    After cleaning, you accept the apartment and we return the keys against a signed handover form. Along with the keys you get the handover file: diagrams, photos of concealed work and the warranty terms.

Comparisons

All comparisons

White frame vs turnkey

A developer's finish or your own renovation from white frame: timing, payment plans, concealed work and wear from renting out.

Cosmetic vs full renovation

How the pipes, wiring and screed tell you whether a cosmetic job is enough or the apartment needs a full renovation.

Laminate vs SPC vinyl

What to lay on the floor by the sea: damp, an empty apartment in winter, the kitchen and hallway, short-term rental.

Ceramic vs porcelain tiles

Floors, walls, showers and open balconies: where you need porcelain, where ceramic will do and how laying differs.

Paint vs wallpaper

External walls, furniture against a cold wall and touch-ups between guests: where paint works in a humid climate and where…

Microcement vs tiles

Wet areas, a moving base, chip repairs and the applicator's experience: where microcement fits and where tiles do.

Crew vs renovation company

When an independent crew is enough, when you need a company, and what to check with any contractor before the first payment.

Questions and answers

How much does it cost to renovate an apartment or a house in Batumi per m²?

As a guide, a cosmetic apartment renovation costs 210–300 ₾ per m², a full renovation 570–780 ₾, a turnkey renovation with mid-range finishing materials 900–1 200 ₾ and a full renovation of a private house 960–1 320 ₾. You get a preliminary estimate from photos and a floor plan before the site measurement, and we fix the final cost after the measurement, once the estimate is agreed.

The total depends mainly on the starting condition, the area of the wet zones, the grade of materials and whether the kitchen and appliances are in the estimate. Every item in the estimate is listed separately, so you can see where you could save and what that saving would cost you.

What does a turnkey renovation include: materials, furniture, appliances?

Materials for the rough work and the finishing are in the estimate, except any you decide to buy yourself. Furniture and appliances are included if you want them: we make the kitchen and wardrobes to measure after tiling and choose appliances to suit the connection points laid in at the rough stage.

You can buy some things yourself. We then give you the sizes, receive the delivery and assemble the furniture. At the end we clean the apartment, so it is ready to move into or to photograph for a listing straight away.

What is the difference between black frame, white frame and green frame?

In short, a black frame apartment has only the structure of the building, while in white frame the partitions, plaster and screed are already done. Each developer defines green frame in its own way, usually as white frame plus some of the finishing.

These terms are not defined in law, so check the annex to your contract with the developer. It lists what you are being handed: windows, the front door, water and drain outlets, electrics. We use that list to accept the apartment and to work out the estimate.

How long does it take to renovate a studio or a one-bedroom (1+1) apartment?

The exact timeline goes into the contract schedule after the site measurement. As a guide, in a 1+1 from white frame the rough work takes 3–5 weeks and the finishing 4–6 weeks, while a made-to-measure kitchen and wardrobes take 3–5 weeks, partly alongside the finishing. A studio usually goes through these stages faster.

From black frame, add time for partitions, plaster and for the screed to dry. The timeline also grows when choosing tiles or furniture drags on: the crew will not lay anything you haven't approved.

I live outside Georgia. Can the renovation be done without me being there?

Yes, and you don't need to come for the site measurement or for accepting the stages. You won't have to bring the keys yourself: the developer or someone you know hands them over, and we take and return them against a signed handover form. Every week you get a photo and video report, and we arrange a video call with the foreman whenever you ask.

Someone you trust can sign the acceptance certificates for you if that is easier. One project manager runs the whole project and answers by phone and on WhatsApp during working hours. If you do come, we can meet at our office in the centre of Batumi.

Can the price of a renovation go up while the work is under way?

The price of each stage is written into the contract and doesn't change unless the scope does. The scope changes in two cases: you decide to add or replace something, or the strip-out uncovers something that couldn't be seen at the site measurement, such as a rusty pipe inside a wall in a resale apartment.

In both cases we first show you photos, work out the cost and timing, and sign a contract addendum with you. Until it is signed, no work beyond the estimate starts, and the amount in the contract stays the same.

What warranty do you give on a renovation, and what does it cover?

The warranty is 2 years on our work and 5 years on concealed services in walls and floors, while materials and appliances carry the manufacturer's warranty. To make a warranty claim, message your project manager and send photos or a video.

We come out and look for the cause, and if it lies in our work, we fix it at our own expense. The routing diagrams and photos of concealed work in the handover file help us find the spot without opening up more wall than needed.

Who buys the materials, and can I see the receipts?

We buy the materials from a schedule you approve, with product codes and quantities. Receipts and delivery notes go into the weekly report, and the final materials list with product codes is part of the handover file.

You can buy some items yourself, such as sanitary ware or light fittings. We'll tell you what to bring and by what day, so the crew isn't left waiting. You pay the advance for materials and the first stage after signing the contract, and we don't take prepayment for the whole job.

Related articles

Terms used on this page

Black frame
A new-build apartment without finishing: concrete walls and slabs, windows, service inlets at the entrance, no partitions, screed or plaster.
White frame
An apartment after rough work: partitions, plaster, screed, electrical and water points, but no finishing or sanitary ware.
Green frame
An intermediate condition between white frame and a finished apartment: part of the finishing is done, and each developer sets the exact scope.
Handover certificate
The document by which an apartment, house or work is handed over; it records the property's condition, keys, meter readings and defects.

Preliminary estimate from photos and plan in 24 hours on business days

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site