Laying engineered wood next to porcelain tiles with a flush joint and no threshold

Flooring installation in Batumi: from screed to skirting

Flooring installation in Batumi starts with the base: we measure the flatness and moisture of the screed and work out the height of each covering from the thresholds. We lay laminate, SPC vinyl, parquet, engineered wood and porcelain tiles, pour self-levelling floors and install underfloor heating. Labour starts from 20 ₾ per m² for laminate, and you buy the floor covering yourself or leave it to us. You see the subfloor measurements in photos before laying.

from 20 ₾/m²laying laminate and SPC, labour only, floor covering extra. The final price is confirmed once agreed.

  • Timeline: 2–3 days for laminate or SPC in a one-bedroom (1+1) apartment on dry screed, about a week with porcelain tiles in the hallway and bathroom; a self-levelling layer adds drying time
  • Warranty: 2-year warranty on laying any floor covering and skirting
Get an estimate

Who it’s for

  • White frame: the developer's screed is in, but it isn't clear which covering can go on it and when

  • One apartment will have tiles, laminate and vinyl, and you need a floor without steps between them

  • A resale apartment has old parquet or linoleum, and you need to decide what to keep and what to take up

  • The renovation is going ahead without you, and you want to see the screed flatness and moisture readings before laying

  • You have already bought the floor covering and need a crew that will lay it to the manufacturer's instructions

What’s included

  • measuring screed flatness with a straightedge and a laser level, and moisture with a moisture meter
  • working out finished floor levels from the front door and the balcony door
  • grinding down bumps, repairing cracks, a self-levelling layer where it is needed
  • vapour barrier film and an underlay to suit the chosen covering
  • laying laminate, SPC vinyl, engineered wood, parquet or porcelain tiles
  • working around pipes and columns with a gap, pipe collars
  • profiles and thresholds where different coverings meet
  • fitting skirting to the wall
  • photos of the subfloor and the measurements in the report and the handover file

Prices: flooring

from 20 ₾/m²

WorkPrice
Laying laminate20–30 ₾/m²
Laying SPC vinyl25–36 ₾/m²
Laying engineered wood flooring51–66 ₾/m²
Laying block parquet on adhesive63–78 ₾/m²
Laying porcelain tiles, 60×60–60×12075–96 ₾/m²
Self-levelling floor14–18 ₾/m²
Skirting board installation13–18 ₾/lin. m

laying laminate and SPC, labour only, floor covering extra. The final price is confirmed once agreed.

Which floor covering we lay in which room

We choose the covering by water and by who will live in the apartment: the owner all year round, or guests after whom the floor is mopped every day.

CoveringWhere it suitsWhat it needs from the subfloor
LaminateDry rooms in an apartment that is lived in all year roundFlat, dry screed, vapour barrier film, dense underlay
SPC vinylHallway, kitchen, studio, rental apartmentFlat, dry screed, vapour barrier film over concrete
Glue-down LVT vinylA quiet floor that can be repaired one tile at a timeSelf-levelling layer, primer, a dry base
Engineered wood, parquetAn apartment for yourself where the air is dehumidifiedDry, strong screed, adhesive with no water in it
Porcelain tilesBathroom, balcony, hallway, kitchenWaterproofing in wet areas, flat screed

An apartment usually ends up with two or three coverings. Laminate laid floating on an underlay costs less to lay and copes better with small level differences, but it can't take water in the joints, so we keep it for dry rooms. In a studio or a kitchen-living room we more often lay vinyl flooring, click SPC or glue-down LVT: it runs as one continuous floor from the front door to the window. By the entrance, in the bathroom and on the balcony you need porcelain floor tiles, which aren't bothered by puddles or by pebbles from the beach.

Order of work: from screed to skirting

The floor is done in the middle of a renovation. Everything that can't be reached later goes under the screed, and we lay dry floor coverings after the wet work and the first coat of paint, so that filler and primer don't drip onto them.

  1. pipes and underfloor heating loops that are cast into the screed;
  2. screed, and drying to the moisture level the floor covering requires;
  3. levelling wherever the screed failed the measurement;
  4. porcelain tiles in the bathroom, the hallway and on the balcony;
  5. walls, ceilings and the first coat of paint;
  6. laminate, SPC vinyl, engineered wood or parquet;
  7. interior doors, skirting, the final coat of paint.

Porcelain tiles go down before the dry coverings: they are cut with a wet saw, and the adhesive and grout add moisture to the apartment. We fit the interior doors after the floor: the frame is set to the finished floor covering without pinning down the floating floor, and the door leaf is trimmed to the same level. A door fitted to the screed will later catch on the laminate.

Subfloor: what we check before laying

We check the screed for flatness, moisture and strength. Flatness is checked with two instruments. A straightedge finds local dips, and a laser level shows the overall slope: because of it, a wardrobe later stands askew and a step appears between rooms. For laminate and click SPC we accept a gap of up to 2 mm under a two-metre straightedge, and for glue-down vinyl up to 1 mm. If the instructions for the range are stricter, we follow them.

We measure moisture in every room and recheck doubtful spots with a carbide tester. The limit is set by the manufacturers of the floor covering and the adhesive, and until the screed has dried to it we don't lay a dry floor covering, even if the deadline is pressing. Strength matters most under glued coverings: parquet, engineered wood, LVT and porcelain tiles. Adhesive won't hold a top layer that turns to dust under a nail, and an area that sounds hollow we break out and pour again.

Small bumps are ground down, and cracks are opened up and filled with repair compound. If the screed is flat only in places, we pour a thin self-levelling layer. We photograph the measurements with the instrument in the frame, and you see them in the report before laying.

Floating floor: vapour barrier, underlay and gaps

Laminate and click SPC vinyl are not fixed to the base: the floor lies on an underlay and changes size with the humidity and temperature in the apartment. On concrete we lay a vapour barrier film under it, unless the underlay has one built in, because the screed goes on giving off moisture for a long time. We take the underlay from the floor covering manufacturer's list. It doesn't even out level differences, and too much softness under a rigid plank breaks the click joints. Glue-down vinyl, parquet and engineered wood are laid without underlay, on primer and adhesive.

At walls, pipes, columns and door frames we leave the gap the range instructions specify, and for laminate it is usually wider than for SPC. It is covered by skirting fixed to the wall, not to the floor. The floor has to move freely, so we don't stand a built-in wardrobe or a run of kitchen units on the floor shared with the rest of the room: under them we make a separate section with a gap, or lay porcelain tiles. Every range has a maximum floor length without a break, and in a long apartment or in narrow doorways between rooms we fit a dividing profile.

Thresholds and joints between different coverings

A threshold-free floor is planned when the screed is poured: under each covering, the screed is laid lower than the finished floor by exactly the thickness of that covering with its adhesive or underlay. If the screed has already been poured at one level, we make up a difference of a few millimetres with a self-levelling layer under the thinner covering. When the levels match, the joint is covered by a narrow profile flush with the floor. When they don't, we show you in advance where a step will remain and move it under a door leaf, not into the middle of the kitchen-living room.

We leave a step in two places, and on purpose. At the way out to the balcony, the threshold and the sill flashing stop rain getting under the floor of the room. In the shower area the floor is lower than in the hallway, so that water doesn't spill out past the door. In every other doorway, a step of more than a couple of millimetres is a defect to us, and we put it right.

We choose the profile to suit the joint: a metal one in the colour of the floor on a straight line, a flexible one on a curve, and a cork expansion strip where the joint should be almost invisible.

Parquet, engineered wood and old wooden floors

With parquet and engineered wood we settle the climate question first: wood by the sea needs a dehumidifier in winter and a hygrometer in the room, and if you don't live in Batumi, we agree who will check them. Engineered wood with a factory finish isn't sanded on site: once the adhesive has set, only the skirting is left to fit. Block parquet takes longer: after laying it is left to settle, then sanded and finished right in the apartment, and each coat dries separately.

Resale apartments often have solid parquet from the Soviet years. If the base is sound and there is enough wood above the tongue for sanding, sanding the old parquet and refinishing it with new lacquer or oil will cost less than a new floor.

What flooring installation in Batumi costs

The prices in the table are for labour: the floor covering, underlay and adhesive are paid for separately. Laying laminate costs from 20 ₾ per m², click SPC vinyl from 25 ₾. Glued coverings cost more: engineered wood from 51 ₾ per m², porcelain tiles in 60×60–60×120 formats from 75 ₾. Skirting is priced separately, from 13 ₾ per linear metre.

The price goes up with levelling the base, herringbone or diagonal laying, removing the old floor, many doorways and pipes in a small area, and carrying materials up without a service lift. It comes out lower on flat, dry screed and with one covering throughout the apartment. The final cost is set after measuring up and agreeing the estimate: only on site can you see whether the screed will pass the check.

How we inspect the finished floor

We inspect the floor in the whole apartment in one walk-through, room by room: defects most often show where coverings meet. At each joint we lay a straightedge across the seam, and there should be no step under it. We open and close the doors, measure the gap under the door leaf at several points, and check the skirting for gaps at the wall and in the corners. If you are not in Batumi, the site foreman does the same check over a video call.

In the handover file we record the product codes and batch numbers of the floor covering, photos of the base with the measurements, and the underfloor heating layout, if there is one. With the product code it is easier to find the same range later to repair an area.

Stages and timelines

  1. Survey and choice of covering

    1 day

    The site foreman measures the area and the flatness and moisture of the screed, and looks at the thresholds and doorways. Together we choose a covering for each room.

  2. Subfloor preparation

    2–7 days

    We repair cracks and voids, pour a self-levelling layer where needed and wait for it to dry.

  3. Acclimatisation

    2–3 days

    The floor covering lies in the apartment in closed packs. In winter we run a dehumidifier during this time.

  4. Laying

    2–5 days

    Porcelain tiles in the wet areas first, then the vapour barrier film, underlay and dry coverings, with profiles at the joints.

  5. Doors and skirting

    1–2 days

    We fit the interior doors to the finished floor, then the skirting and pipe collars.

  6. Inspection

    1 day

    We walk the apartment checking the joints and doors, and record any issues in the certificate with photos. You sign off on site or by video call.

Local specifics in Batumi

New builds in Batumi are often handed over with screed that was poured before the windows went in, sometimes in the rainy season. Once the windows are shut, it goes on giving off moisture for a long time, even though it looks dry on top. That is why the laying date is set by the moisture meter. If the developer's screed hasn't dried out yet, we start with the coverings that mind moisture less, such as porcelain tiles, and lay laminate and engineered wood later.

Some ranges of laminate, engineered wood and large-format porcelain tiles aren't held in stock in Batumi, and are brought from Tbilisi or made to order. We choose the covering before the rough work, so that it is already in the apartment by the time we lay it.

We schedule porcelain tile cutting and parquet sanding for the hours when noise is allowed in the building, and we agree deliveries and lift protection with the management company in advance.

Materials and brands

The mixes under the floor covering do the work, and choosing them matters more than the brand of the floor itself. We pour self-levelling layers with Ceresit, Knauf or Mapei compounds and use primer from the same system. Porcelain floor tiles go on Ceresit, Weber or Mapei adhesive marked for porcelain, and parquet and engineered wood on a polyurethane or silane adhesive with no water in it.

The covering itself we choose by its specifications: laminate by class and joint impregnation, SPC by the thickness of the wear layer, engineered wood by the thickness of the hardwood top layer. The underlay and profiles come from the system the floor covering manufacturer names.

What makes up the cost

Timeline: 2–3 days for laminate or SPC in a one-bedroom (1+1) apartment on dry screed, about a week with porcelain tiles in the hallway and bathroom; a self-levelling layer adds drying time

  • the area is calculated separately for each covering, and skirting by the linear metre

What raises the cost

  • levelling the screed with a self-levelling layer or by grinding
  • herringbone or diagonal laying, with more cutting and waste
  • removing the old floor covering and taking away the waste
  • many doorways, pipes and thresholds in a small area
  • carrying materials up without a service lift

What lowers the cost

  • flat, dry screed that passes the measurement first time
  • one covering throughout the apartment, with no joints

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

2-year warranty on laying any floor covering and skirting. If the floor opens up or starts to creak because of a base we accepted and prepared, or because of the installation, we relay that area at our own expense. Wiring, water pipes and drains that we laid in the floor have a 5-year warranty, and water underfloor heating pipes come under the 2-year warranty on work. The floor covering itself, the heating cable and the heating mat are covered by the manufacturer's warranty.

Questions and answers

How much does flooring installation cost in Batumi per m²?

Laying laminate costs from 20 to 30 ₾ per m², click SPC vinyl from 25 to 36 ₾, engineered wood from 51 to 66 ₾, and block parquet on adhesive from 63 to 78 ₾. These prices are for labour only: you buy the floor covering, underlay and adhesive yourself or leave the purchase to us, working from a materials list. Skirting is priced separately, from 13 to 18 ₾ per linear metre.

If the screed needs levelling, a self-levelling layer adds from 14 to 18 ₾ per m² in labour. We send a preliminary estimate from photos and a floor plan, and fix the final cost after measuring up and agreeing the estimate.

Can the floor be replaced without removing the interior doors?

Yes. We leave the door frame in place and undercut it at the bottom so that the new floor covering slides under it: that way there is no joint at the frame that would have to be filled with sealant.

If the new floor is higher than the old one, the door leaf starts to catch on it. Then we take the leaf off its hinges and trim it at the bottom, leaving a gap under it for air. Lightweight door leaves with a honeycomb core have only a narrow timber rail at the bottom, and they can be trimmed by no more than its width. So we check the height of the new floor against the doors before the covering is bought, and if there isn't enough margin, we tell you in advance which door leaves will have to be replaced.

Can flooring be laid in winter in Batumi?

Yes, if the apartment is kept within the climate set out in the floor covering's instructions. For Kronotex laminate, for example, that means an air temperature of at least 18 °C and relative humidity of 50 to 75% before laying, during it and for three days afterwards. For parquet and engineered wood the limits are usually narrower. In a closed apartment by the sea the humidity in winter is often higher, so for the duration of the work we turn on the heating or the air conditioning and set up a dehumidifier, and send you the hygrometer readings in the report.

Damp bothers porcelain tiles and glue-down vinyl less, but the adhesive needs the base temperature given in its own instructions. On cold screed by an external wall it takes longer to set, and we allow for this in the schedule.

How much extra floor covering should I buy?

For straight laying in a regular-shaped room, 5–7% for cutting is usually enough. Herringbone, diagonal laying, niches, bay windows and many doorways raise the allowance to 10–15%. We calculate the exact quantity from the layout plan after measuring up, not from the apartment area in the contract: that area usually includes the balcony and the bathroom, where this covering won't go.

Buy all the covering from one batch, because the shade can differ slightly between batches. We record the batch number and product code in the handover file, so that the same range can be found later.

Can I order just the laying if I have bought the floor covering myself?

Yes, that is an ordinary order. Show us the covering before laying: we'll open one or two packs, check the geometry of the boards and the click joints, and point out any defects before work starts. A defect found once the floor is already down is a matter for the seller, and our warranty covers the installation.

Send us the name of the range and we'll find its instructions: the underlay, the gaps and the subfloor tolerance depend on them. The covering should arrive in the apartment a couple of days before laying and lie there in closed packs.

Further reading

Send a floor plan and photos of the floor, and we'll price all the coverings within 24 hours on business days

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site