Laying engineered wood next to porcelain tiles with a flush joint and no threshold

Parquet flooring in Batumi: solid wood on plywood and adhesive

Laying parquet flooring in Batumi depends on three measurements: the moisture of the screed, the moisture of the blocks themselves and the humidity of the room. We lay solid wood block parquet on moisture-resistant plywood with a water-free adhesive, in a deck pattern, herringbone or squares, and once it has settled we sand it and finish it with lacquer or oil. Labour costs from 63 ₾ per m², with materials, plywood and sanding priced separately. We take on solid wood where the apartment will have dehumidification running.

from 63 ₾/m²laying on adhesive only; parquet, adhesive, plywood and sanding extra. The final price is confirmed once agreed.

  • Timeline: 2–3 weeks for a room of about 20 m² from parquet delivery to skirting, of which 1–2 weeks go on acclimatisation
  • Warranty: 2-year warranty on laying, sanding and finishing the parquet
Get an estimate

Who it’s for

  • You live in the apartment all year round and want solid wood underfoot, not multi-layer boards

  • You are creating a classic interior that needs herringbone, modular patterns or a border made of solid blocks

  • You want a floor that can be sanded again in ten or fifteen years rather than replaced

  • You have bought the parquet yourself and want the batch checked before anyone starts gluing it down

  • You are running the renovation from abroad and want to see the plywood and adhesive in photos before the blocks go down

What’s included

  • measuring the screed moisture with a carbide tester, checking its strength and flatness
  • acclimatising the blocks in the room where they will be laid and measuring their moisture
  • sorting the blocks by shade and setting defective ones aside for cutting
  • primer and moisture-resistant plywood on adhesive and anchors, sanding the plywood
  • marking out the centre lines and the pattern: deck, herringbone, squares, border
  • laying the parquet on water-free adhesive with a gap at the walls
  • cork expansion strips and threshold strips where the floor meets tiles
  • photos of the plywood and subfloor before laying in the weekly report
  • fitting skirting boards after the finish coat

Prices: parquet

from 63 ₾/m²

WorkPrice
Laying block parquet on adhesive63–78 ₾/m²
Solid parquet (material)220–300 ₾/m²
Parquet sanding and lacquering (oiling)42–54 ₾/m²
Laying plywood under parquet30–42 ₾/m²
Floor screed to guide rails40–66 ₾/m²
Skirting board installation13–18 ₾/lin. m

laying on adhesive only; parquet, adhesive, plywood and sanding extra. The final price is confirmed once agreed.

What we check before the parquet arrives

Parquet is the last finishing material to be brought into the apartment. By then the windows are in, the plaster and filler have dried and the bathroom tiles are laid. Wet work nearby adds moisture to the air, and the blocks would soak it up.

The key figure here is the moisture content of the screed. We measure it with a carbide (CM) tester, taking the sample from deep in the layer rather than from the surface, which dries first. We lay parquet at 2% or below, and at 1.8% over underfloor heating, unless the adhesive instructions are stricter. Until the floor screed has dried to that figure, we don't start laying, even if the schedule says it is time.

We check the strength of the screed with a nail and by tapping. As solid wood shrinks, it pulls on the base, and if the top of the screed crumbles or sounds hollow, the adhesive will tear it away along with the floor. Under plywood, a deviation of up to 2 mm under a two-metre straightedge is usually acceptable, and we take the exact tolerance from the adhesive instructions.

Acclimatising and sorting the blocks

Solid wood leaves the factory dry, made for air drier than Batumi's. We open the packs in the room where the floor will be laid, and the blocks stay there with a dehumidifier running or the air conditioner in dry mode. This usually takes one to two weeks, and the parquet manufacturer gives the exact period. In that time the wood reaches the moisture content it will live with.

Before laying, we measure the moisture of the blocks themselves with a pin moisture meter in several packs. If the readings differ noticeably from the batch specification or from one pack to another, we postpone laying: blocks with different moisture levels will later shrink differently, and gaps will open up in patches. At the same time we sort the blocks by shade and set cracked ones aside for cutting at the walls.

Plywood under parquet and why it is needed

We almost always lay block parquet on plywood. When the humidity changes, solid wood pulls on the base, and the plywood takes that stress instead of passing it on to the screed, which could crack. It also separates the wood from residual moisture in the concrete and gives a flat surface that can be sanded.

We use moisture-resistant birch plywood 12–15 mm thick and cut the sheets into squares: a whole sheet builds up stress and bows over time. The pieces are laid with staggered joints, 3–5 mm apart and about 10 mm from the walls, glued to the primed screed and fixed with anchors. Then we sand the plywood flat. The site foreman photographs this layer, because once the parquet is down it can't be seen.

Adhesive and laying pattern

We use an adhesive with no water in it: two-component polyurethane or one-component silane. It is spread over the whole area with a notched trowel, and each block is pressed down and tapped in so that no void is left beneath it. Open times vary from product to product, so we spread the adhesive in a strip a few rows wide rather than over the whole room.

A deck pattern is laid from the long wall or in line with the light from the window. Herringbone and squares start from a centre line, which we mark across the middle of the room with a string line or a laser: if the first row drifts by a couple of millimetres, the pattern will visibly wander by the opposite wall. A border around the perimeter hides uneven walls but adds cutting. We leave a 10–15 mm gap at the walls and cover it with skirting board. Where the parquet meets the tiles in the hallway or kitchen, we fit a cork expansion strip or a threshold strip.

If you are still choosing between solid wood and multi-layer boards, the difference for our climate is explained in our comparison of parquet and engineered wood.

Settling time, sanding and finish

Parquet is not sanded straight after laying: for several days the floor stays covered and unloaded while the adhesive gains strength. Then it is sanded in several passes, the gaps are filled, and it is finished with lacquer or oil. How we sand and what we finish the wood with is described in detail on the page about parquet sanding and restoration.

How to inspect newly laid parquet

We inspect the floor in two stages. The first is before sanding: we tap the blocks with a hammer handle, and where the sound is hollow, the block has bedded without adhesive. It is relaid straight away, while the neighbouring blocks can still be lifted without damage. With a string line we check that the herringbone lines run straight, and we look at the gap at the walls before the skirting covers it.

The second is after finishing, against the light from the window. Raking light shows ripples from the drum sander, swirls from the edger along the walls, raised grain and bubbles in the lacquer. After sanding, a fingernail should not catch on any step between blocks.

Fine gaps can appear in solid wood during the first season of air conditioning or heating: the wood is getting used to the apartment. If gaps have opened across the whole room, the first thing we look at is the hygrometer and how the dehumidification is working.

How much parquet flooring in Batumi costs

Laying block parquet on adhesive costs from 63 to 78 ₾ per m². This is labour only: the parquet, adhesive, plywood and sanding are not included. Solid parquet as a material costs from 220 to 300 ₾ per m², laying plywood from 30 to 42 ₾, and sanding with a lacquer or oil finish from 42 to 54 ₾ per m² of labour.

Herringbone, modular patterns and borders push the price towards the upper end, as do small rooms with a lot of cutting and exotic species that need a special adhesive. A deck pattern in a large, simply shaped room costs less. If the screed has to be redone, that is added to the estimate too, from 40 to 66 ₾ per m². The final cost is set after measuring up and agreeing the estimate, and each stage has its own price in the contract.

Stages and timelines

  1. Subfloor survey

    1 day

    We measure the moisture, flatness and strength of the screed and calculate the parquet with a margin for the chosen pattern.

  2. Acclimatisation

    1–2 weeks

    The blocks lie in the room where they will be laid with dehumidification running, for the period the manufacturer specifies. Before laying, we measure their moisture.

  3. Plywood

    1–2 days

    We prime the screed, glue down the cut plywood, fix it with anchors and sand it flat.

  4. Laying the parquet

    2–5 days

    We mark out the centre lines, lay the blocks on adhesive, check the pattern with a string line and the bond by tapping.

  5. Settling time

    3–7 days

    The adhesive gains strength as its instructions specify, with the floor covered and unloaded. In the damp season this pause is longer.

  6. Sanding and finishing

    3–5 days

    We sand in several passes, fill the gaps, then apply primer and lacquer or oil.

  7. Skirting and floor handover

    1 day

    We fit the skirting and the expansion strips at the tiles, and show you the floor in daylight on site or by video.

Local specifics in Batumi

A batch of solid wood in the right species and grade is often made to order, and buying blocks of the same shade six months later is almost impossible. So we calculate the quantity after measuring up, with a margin for the chosen pattern, and take everything from one batch. We suggest keeping one or two packs in a storeroom: if blocks ever have to be replaced after a leak, the replacements will come from the same wood.

Cast-in-place concrete buildings in Batumi are handed over with concrete that goes on giving off moisture for a long time, and screed on such a floor slab dries more slowly than the schedule promises. If the reading is borderline and there is no time to wait, we apply a moisture-retarding primer under the plywood, one that the manufacturer approves for laying on this kind of screed. In winter we lay parquet only with dehumidification running: laid in damp air, it will shrink under the air conditioning in summer and open up gaps. Sanding, the noisiest stage, is scheduled for the hours the building's rules allow.

Materials and brands

For Batumi we most often recommend oak: it is dense, holds its shape and takes both lacquer and oil well. Ash and American walnut are also suitable. Beech and maple react more strongly to changes in humidity, so we don't recommend them by the sea. Exotic species such as merbau and teak are oily, and we choose the adhesive and primer for them according to the parquet manufacturer's instructions.

The grade sets the look: select has almost no knots or variation in shade, while natural and rustic grades have more, and the floor looks livelier. Under parquet we use moisture-resistant birch plywood and a polyurethane or silane adhesive. The primer, adhesive and lacquer come from one manufacturer's range: these layers have been tested together, and if a defect is disputed, nobody has to work out whose product didn't suit the next layer.

What makes up the cost

Timeline: 2–3 weeks for a room of about 20 m² from parquet delivery to skirting, of which 1–2 weeks go on acclimatisation

  • the wood species and grade you choose

What raises the cost

  • herringbone, modular patterns or a border instead of a deck pattern
  • the screed needs further drying, levelling or a moisture-retarding primer
  • small rooms, alcoves and a lot of cutting around doors
  • an exotic species that needs a special adhesive

What lowers the cost

  • a deck pattern in a large, simply shaped room
  • dry, sound screed that takes plywood without levelling

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

2-year warranty on laying, sanding and finishing the parquet. If blocks come away from the base or the floor sounds hollow because of the adhesive or the plywood, we relay that area at our own expense. Under the contract, gaps and cupping caused by the apartment not being kept at the humidity given in the parquet instructions are not warranty cases, so it is worth leaving a hygrometer in the room. The parquet itself is covered by the manufacturer's warranty.

Questions and answers

How much does parquet laying cost per m² in Batumi?

Laying block parquet on adhesive costs from 63 to 78 ₾ per m², which is labour without materials. Priced separately are the parquet itself, from 220 to 300 ₾ per m², laying plywood under it, from 30 to 42 ₾, and sanding with lacquer or oil, from 42 to 54 ₾. We fit skirting boards from 13 to 18 ₾ per linear metre.

Herringbone and modular patterns cost more than a deck pattern, and small rooms more than large ones. We send a preliminary estimate from photos and a floor plan within 24 hours on business days, and fix the final cost after measuring up and agreeing the estimate.

Can parquet be laid directly on the screed without plywood?

It can, but there are more conditions. The screed must be strong, dry according to the measurement and flat, the parquet must be small-format, with short blocks, and the adhesive must be one the manufacturer approves for laying directly on screed. There must be no cracks in the screed: as solid wood shrinks, it pulls on the base and will tear away a weak top layer.

In Batumi new builds, the developer's screed can vary in strength even within one apartment, so we almost always lay plywood. It is an extra line in the estimate and a couple of days' work, but it removes the risk of the floor coming away together with the top of the screed.

Which parquet pattern should I choose: deck, herringbone or squares?

A deck pattern, where the blocks run in staggered rows, is the simplest and cheapest to lay and looks calm in a large room. Herringbone, laid with its axis along the long wall, makes a room look longer, but it needs precise marking out and produces more cutting. Squares and modular patterns look good in a living room, but they show more clearly how the wood moves with the seasons: the grain in neighbouring squares runs in different directions, and the joints open unevenly.

For an apartment by the sea we usually recommend a deck pattern or classic herringbone in oak. We approve the pattern from a layout on the plan, which shows where the cuts will fall.

Why has the parquet buckled, and what can be done about it?

Most often water is to blame. A leak, wet mopping, wind-driven rain at the balcony door or months in a closed apartment without dehumidification let the wood take on moisture, and the blocks run out of room. Less often the cause is the installation: no gap at the walls, adhesive that didn't cover the whole area, or parquet laid on damp screed.

First we remove the source of the water and switch on dehumidification, and we don't heat the floor or weigh it down. Once the humidity is back to normal, some of the blocks will settle back into place. Those that have come away from the base are re-glued, and the area is then sanded and refinished. If the cause lies in our installation, it is a warranty case.

How many days after laying can parquet be sanded?

The adhesive sets the timing: its instructions say when the floor can be sanded, and for polyurethane and silane products this is usually a few days. We add a margin to that, especially in the damp season, because after laying the blocks are still balancing their moisture with the base and the air.

If the floor is sanded too early, the adhesive under the blocks may not withstand the load from the machine, and blocks that are still moving will leave steps at the joints after lacquering. While the floor settles, nobody walks on it in outdoor shoes, no furniture goes on it, and the room is kept closed.

Further reading

Send a plan and photos of the screed, and we'll price your parquet installation within 24 hours

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site