
Floor screed in Batumi: method and sign-off
Floor screed in Batumi for tiles, laminate, parquet and SPC vinyl: we pour cement screed to guide rails directly onto the slab, onto a separating layer, over sound insulation or over underfloor heating pipes. Labour costs from 40 ₾ per m² for a layer up to 5 cm, with the mix priced separately. We choose the type and thickness before pouring, care for the mortar for a week afterwards, and hand the screed over after checks with a level, a straightedge, tap-testing and a moisture meter.
from 40 ₾/m²labour to guide rails for a layer up to 5 cm, mix extra. The final price is confirmed once agreed.
- Timeline: 3–5 days of work for a 1+1 apartment of about 45 m², followed by a week of curing; the floor covering goes down after the moisture measurement
- Warranty: 2-year warranty on screed
Who it’s for
Your apartment is in black frame, and the floor needs bringing to one level for tiles and laminate
In a resale apartment the old screed sounds hollow and crumbles, and it is being taken up to the slab
Underfloor heating pipes or a sound-insulating underlay will go under the new screed
The developer poured the floor with level differences, and it has to be redone for large porcelain tiles
Another crew is doing the finishing, and you want the screed handed over with measurements and a certificate
What’s included
- a level survey of the slab and calculating the thickness from its highest point
- cleaning and priming the slab, or a separating layer
- guide rails set with a laser level, and perimeter strip around the walls, columns and pipes
- mortar with fibre, mesh on spacers in floating screed and over pipes
- pouring, compacting and smoothing the surface
- joints in doorways and across large areas
- curing the mortar during the first week
- sign-off with flatness and moisture measurements, and a stage certificate
What screed we lay and how thick
We choose the type of screed by what lies beneath it. A bonded screed holds onto a slab that has been cleaned of dust and primed, which is why it is the thinnest. Over waterproofing or an old floor with oil stains, a bond is either not needed or not possible, and the screed is laid on a separating layer of plastic sheeting. A floating screed lies on sound or thermal insulation and is not bonded to anything, so it is thicker and always has mesh.
| Screed | Where we use it | Our minimum thickness |
|---|---|---|
| Bonded to the slab | A strong, level slab | 3 cm |
| On a separating layer | Over waterproofing or an old base | 4 cm |
| Floating | Over sound or thermal insulation | 5 cm with mesh |
| Over pipes | Underfloor heating, water pipes in corrugated sleeving | 3 cm above the pipe |
The minimum thicknesses in the table come from our own practice with sand-cement mortar: any thinner and it cracks and comes away more often. We calculate the thickness from the highest point of the slab, not “with a margin”. A centimetre of this mortar weighs about 20 kg per m², and the floor slab has no need of extra centimetres across the whole apartment. The layer under a floating screed that stops footstep noise is described on the page about floor and slab soundproofing.
What we mix the mortar from and how we reinforce it
We make wet screed from a ready-made dry mix with its strength class on the bag, or mix Portland cement with washed sand on site, roughly 1:3 in our practice. We measure out the water according to the technical data sheet, not by eye. Extra water makes the job easier for the tradesman, but later it rises to the top as laitance and leaves a weak surface that dusts and cracks as it shrinks.
Semi-dry mix is pumped through a hose by a machine parked by the entrance. It contains little water, so it is compacted and finished with a power float, otherwise the top stays loose.
We add polypropylene fibre to almost every screed: in the first few days it protects the mortar from fine shrinkage cracks. Mesh is needed in a floating screed and in the layer over pipes. We raise it on spacers to the middle of the thickness, because mesh lying on the slab reinforces nothing.
Guide rails, perimeter strip and joints
We set the guide rails with a laser level at a spacing shorter than the two-metre straightedge, so that it always rests on two rails. Once the mortar has set, we pull out metal rails and fill the grooves: screed often cracks along the line of any metal left in it, and in humid air galvanised steel rusts over time. Before pouring, we stick perimeter strip around the walls, columns and pipes. The screed must not butt against the building's concrete: as it shrinks it cracks along the edge, and a floating screed also carries footsteps into the walls.
We pour each room in one go, because the joint between yesterday's and today's mortar remains a weak spot. In doorways we make a joint through the full thickness, otherwise the screed will crack exactly where the floor area suddenly narrows. In our practice, rooms larger than 30 m², long corridors and L-shaped rooms are divided into bays by joints that we cut to a third of the depth within the first 24 hours. Under tiles, the screed joints line up with the tile joints, and with underfloor heating they follow the boundaries of the heating loops.
The first week: screed is cured, not dried
Cement needs water to gain strength, so for the first few days we keep the mortar damp. We cover fresh screed with plastic sheeting, and if the surface turns pale, we dampen it. Draughts, sun and heaters draw water out of the top too early, and the surface develops a network of cracks or starts to dust.
We start drying after about a week, with ventilation and a dehumidifier. The screed must not be heated early with underfloor heating; how the system is first switched on is described on the page about water and electric underfloor heating.
How we sign off a screed
The tolerances in the table come from our practice for specific floor coverings, and we write the same figures into the estimate.
| What we check | With what | What we accept |
|---|---|---|
| Level | Laser level, a grid at one-metre spacing | As on the plan, with no steps where rooms meet |
| Flatness | 2 m straightedge | Up to 3 mm for tiles; up to 2 mm for laminate, parquet and large-format tiles |
| Bond | Tap-testing the whole area | No hollow sound |
| Surface | A scratch with a nail, a palm checked for dust | Doesn't crumble or dust |
| Cracks | Visual inspection and a feeler gauge | Hairline only, with no offset between the edges |
| Moisture | Moisture meter, plastic sheet left for 24 hours | As the floor covering's data sheet requires |
Areas that sound hollow, and cracks whose edges have shifted in height, are cut out and poured again. A through crack with no step is stitched with staples set in resin, and a dusty surface is strengthened with a deep-penetrating primer. If glue-down SPC vinyl needs a perfect surface, we add a thin self-levelling layer on top. When we doubt the meter, we tape down a one-metre square of plastic sheeting around its edges for 24 hours: condensation under it means it is too early to lay the floor covering.
What to do before screeding and what not to do after
By the time we pour, the water pipes and underfloor heating loops have been pressure-tested, the cables checked, and the runs photographed with measurements from the walls. In a walk-in shower without a tray, the screed sets the fall to the floor drain, so we work out its levels from the drain body. While the mortar is gaining strength, no pallets of tiles or barrels of water go on the floor. In a bathroom and on a balcony, liquid-applied waterproofing goes onto the dried screed, and the tiles go only on top of it.
How much floor screed costs in Batumi
Wet screed to guide rails costs from 40 to 66 ₾ per m²; this is labour only, for a layer up to 5 cm. The mix is priced separately: for a 5 cm layer the material comes to 30–42 ₾ per m², and the guide rails and perimeter strip are a line of their own, at 12–18 ₾ per linear metre. A level slab and large rooms are closer to the lower end of the range. A thick layer, floating screed with mesh, underfloor heating pipes and an apartment of small rooms with thresholds are closer to the upper end.
Removing old screed costs 69–90 ₾ per m², more than pouring a new one, so it is cheaper to prevent voids than to take the screed up later. The final cost is set after the site measurement and once the estimate is agreed, and the price of the stage is written into the contract.
Stages and timelines
-
Level survey and calculation
1 day
We take the slab levels with a laser level and work out the thickness for each floor covering and the amount of mix.
-
Preparing the base
1 day
We clear away debris and dust, seal the gaps around the risers, prime the slab or lay a separating layer, stick down the perimeter strip and set out the mesh on spacers if it is needed.
-
Guide rails
1 day
We set the guide rails to the level at a spacing shorter than the straightedge and check them a second time before pouring.
-
Pouring and joints
1–2 days
We pour each room in one go, compact and smooth the mortar, and cut the joints within the first 24 hours.
-
Curing
1 week
We keep the screed damp under plastic sheeting, protect it from draughts and direct sun, and pull out the guide rails.
-
Sign-off
1 day
We check the levels and flatness, tap-test the whole area and sign the stage certificate. Moisture for the floor covering is measured separately, before laying.
Local specifics in Batumi
In new builds, unsealed gaps are often left in the slab around the risers, and water from the mortar runs through them to the neighbours below. We seal these spots before pouring. Apartments above an underground car park or above a cold ground-floor space sit on a cold slab in winter, and the floor by the external walls can get damp there, so we lay a floating screed over thermal insulation.
We pour when the room is between +5 and +25 °C: that is our working range for cement mixes. In winter, in an empty apartment without heating, the screed gains strength more slowly, and we don't point space heaters at it. In July and August an apartment with south-facing glazing heats up more during the day, so we start pouring in the morning and cover the glass from the inside with cardboard for the first week.
For a semi-dry screed the machine stands by the entrance, and the hose runs up to the apartment via the stairs or through a window. Not every residential complex allows this, so we find out the building's rules from the management company before choosing the method. If it is not allowed, we lay a wet screed from bagged mix, which we bring up in the service lift according to the building's schedule.
Materials and brands
For screed we use ready-made dry mixes with the strength class and drying time given in the technical data sheet: Knauf, Ceresit, Weber or Mapei, which are sold in Georgia's large building supply stores. Under a bonded screed, a smooth, dense slab is first ground or scored and then primed with a product from the same system as the mix. When we mix the mortar on site, we use Portland cement and washed sand free of clay and salt.
The fibre we use is polypropylene. The mesh for a floating screed is steel or composite: by the sea, composite mesh doesn't rust if the mortar cracks somewhere and lets moisture through to the reinforcement. Fast-drying mixes cost more than standard ones, and we suggest them when the date for laying the floor matters more than the budget.
What makes up the cost
Timeline: 3–5 days of work for a 1+1 apartment of about 45 m², followed by a week of curing; the floor covering goes down after the moisture measurement
- getting the mix upstairs: the floor, the service lift and the building's schedule
What raises the cost
- a thick layer over an uneven slab: more mix and a longer curing time
- floating screed with mesh over sound or thermal insulation
- underfloor heating pipes and joints along the loop boundaries
- taking up old screed back to the slab
- a fast-drying mix instead of a standard one
What lowers the cost
- a level, strong slab and a thin bonded layer
- large rooms without narrow doorways or thresholds
We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.
Get an estimateGuarantees
2-year warranty on screed: cracks, voids and debonding.
If through our fault the screed comes away from the slab or cracks with a step, we open up the area and pour it again under the warranty, and how the floor covering on top is restored is set out in the terms of the contract. We record the levels and the flatness and moisture measurements in the stage certificate, and they show what floor we handed over. Water pipes, drains and wiring in the screed, if we laid them, are covered by a 5-year warranty, while water underfloor heating pipes fall under the 2-year warranty on the work.
Questions and answers
How much does floor screed cost per m² in Batumi?
Labour to guide rails for a layer up to 5 cm costs from 40 to 66 ₾ per m², and the mix is priced separately: for a 5 cm layer it comes to 30–42 ₾ per m². If the old screed has to be taken up back to the slab, removal adds 69–90 ₾ per m². Small rooms with thresholds, floating screed with mesh and underfloor heating pipes come out closer to the upper end.
We send a preliminary estimate from a plan and photos within 24 hours on business days. The final cost is set after the site measurement and once the estimate is agreed.
Which screed is better for an apartment: wet, semi-dry or dry?
In a cast-in-place concrete new build in Batumi, we most often lay a wet screed from a ready-made mix: it can be poured on any floor, even if the residential complex won't let in the machine for a semi-dry one. Semi-dry pays off on large areas, when the building allows a machine by the entrance and a hose up the stairs.
A dry screed assembled from boards makes sense where the floor structure can't take mortar, for example on timber joists in an old building. In a damp apartment by the sea its boards are vulnerable to leaks, and in a bathroom they need especially reliable waterproofing on top.
Can new screed be poured over old screed?
Yes, if the old one is firmly bonded: it doesn't sound hollow when tapped, doesn't crumble under a nail and has no cracks with offset edges. Then we clean and prime it and pour a new layer, or level it with a thin self-levelling compound. Height matters too: every centimetre raises the floor at the thresholds and takes away from the room height.
If the old screed has come away from the slab even in part of a room, there is no point pouring on top: the new layer will crack over the old voids. We take up such areas, and when almost the whole floor sounds hollow, it is cheaper to remove the screed completely.
Can screed be laid in just one room?
Yes, for example in the bathroom or kitchen of a resale apartment, when the floor in the rest of the apartment is sound. The key point here is the junction: we bring the new screed to the level of the adjoining floor, allowing for the thickness of the new and old floor coverings, so that a threshold doesn't appear where there wasn't one. At the boundary with the old screed we make a joint, and we tap the edge of the old one and, if it is coming away, cut a strip back to sound material.
Per metre, a small area costs more: the preparation, the guide rails and the crew's visit are almost the same as for a large room. Sometimes it makes sense to re-pour the adjoining corridor at the same time, and that becomes clear after the site measurement.
When can you walk on screed and lay tiles?
Nobody walks on fresh cement screed for the first 24 hours. On the second or third day you can already walk across it carefully, but we allow materials to be carried and trolleys to be wheeled over it no earlier than a week later. Cement mortar reaches its design strength in about 28 days, and that is the period we go by before putting anything heavy on the floor.
When the floor covering can go down depends on the moisture of the base and on the data sheet for the adhesive or flooring. Porcelain tiles on cement adhesive can usually be laid sooner than laminate and parquet, which need a dry screed. Before laying, we measure the moisture at several points, including by the external wall, and record the result in the certificate.
Further reading
Send a plan and photos of the floor, and we'll work out the screed thickness and price within 24 hours
We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.
Mon–Fri 10:00–19:00, Sat 11:00–16:00