Bathroom waterproofing in Batumi: showers, WCs and balconies
We do bathroom waterproofing in Batumi as a separate job or as part of a renovation, and we seal the shower, the WC, the balcony and the space under the washing machine in the same way. The compound is chosen for each area: a polymer membrane in the bathroom, a flexible cementitious coating in a walk-in shower without a tray and on the balcony. Corners, pipes and the floor drain are sealed with tapes and collars, and we keep the layer under water for 24 hours and film it before tiling. Labour costs from 30 ₾ per m², with materials and tapes extra.
from 30 ₾/m²two-coat liquid waterproofing membrane, labour; materials, tape and screed extra. The final price is confirmed once agreed.
- Timeline: 5–6 days for a 4–6 m² bathroom with a polymer membrane, from inspection to water test; the cementitious coating in a walk-in shower without a tray or on a balcony needs a couple of days more
- Warranty: Waterproofing is covered by our 2-year warranty on the work
Who it’s for
Your own crew is laying the tiles, and you want the layer underneath done separately and tested with water
You are building a shower with a floor drain, and water will stand directly on the waterproofing every day
There is another stain on the ceiling of the apartment below, and it looks as if there was never any waterproofing under the old tiles
You have an open balcony where, after a downpour, water soaks into the screed and runs under the balcony door threshold
You are moving the washing machine or water heater into a storage room, and the floor around them has to hold water
What’s included
- inspection of the screed and walls with moisture readings
- choosing the compound for each area: polymer membrane, cementitious coating or liquid rubber
- dust removal, crack repair, chamfers and fillets in the corners, primer
- tapes and corner pieces in the corners and at the joint between floor and walls
- collars on pipe outlets and bedding in the drain flange
- tape along the rim of the bath and shower tray, under the future tiles
- two coats at right angles, carried up the walls and under the threshold
- a 24-hour water test with the level marked and filmed
- photos of the layer before tiling for the handover file
Where an apartment needs waterproofing
The layer is needed wherever water can end up on the floor and soak through the slab to the neighbours: in the shower and by the bath, across the bathroom floor, under the washing machine, in a storage room with a water heater, and on the balcony. We take it 20–30 cm up the walls in the bathroom, 15–20 cm up the walls and under the door threshold on the balcony, and up to the height of the shower head in the shower and above the bath.
The layer has the hardest job in a walk-in shower without a tray, where it is tied up with the fall, the floor drain and the floor height. How we work these out is covered on the page about the walk-in shower with a floor drain, and the full order of work is described in the section on complete bathroom renovation.
Polymer membrane, cementitious coating or liquid rubber
| Compound | Where we use it | What it needs |
|---|---|---|
| One-part polymer membrane | Bathroom floor and walls, the area around the bath and shower tray, the space under the washing machine | Indoors only, a dry primed base, air humidity no higher than 80% |
| Two-part flexible cementitious coating | Walk-in shower without a tray, balcony, loggia, terrace | A base dampened before application, air humidity no higher than 80%, the fresh coating protected from sun and rain |
| Liquid rubber | An open balcony under board decking | A dry base; tiles are not laid on it |
The polymer membrane works indoors only and copes well with a floor that gets wet from time to time. In a walk-in shower without a tray, water stands on the floor every day, and on a balcony the layer has to take sun, rain and swings in temperature. In both places we use a flexible cementitious coating: it is thicker, at least 2 mm, and bridges cracks in the slab. The fall, the drip profile and the threshold are covered on the page about balcony renovation.
Preparing the base
Before the first coat:
- we measure the moisture with a meter: the screed and plaster must be dry for any compound. For the cementitious coating we also dampen the surface before application, without leaving puddles, so that the concrete doesn't draw the water out of the layer;
- we remove the dust, cut back lumps and ridges, and fill voids and cracks;
- in the shower area we replace gypsum plaster with cement plaster, and only moisture-resistant plasterboard is used there;
- we chamfer external corners and form a fillet or lay tape in internal ones: on a sharp corner the layer tears first;
- we prime with a product from the same system.
How long we dry the screed before waterproofing is explained on the page about screed for tiles.
Tapes, collars and the floor drain
Screed settles, the floor slab deflects, and over time the joint between floor and wall opens up by fractions of a millimetre. A continuous layer cracks at such a joint, so we cover corners, junctions and pipe penetrations with tape and preformed parts.
We bed the tape into the fresh first coat and press it down with a trowel so that no air is left underneath, with an overlap of at least 5 cm. On corners we fit preformed corner pieces: tape folded by hand leaves a crease, and water travels along it under the layer. The collars on the water outlets and the drain flange are bedded in the same way, between the first and second coats.
Along the rim of the bath and shower tray we bond a tape that the tiles later cover. Silicone on top of it is only the second line of defence: in a damp bathroom it ages faster than anything else.
Two coats and drying times
We apply the compound in two coats, the second at right angles to the first, to close up pores and missed spots. We check the thickness by consumption. According to the technical data sheets of the products we use, two coats of the polymer membrane take about 1.4 kg per m², and the cementitious coating at 2 mm takes about 3.2 kg. If noticeably less has gone on, the layer is too thin, and we apply another coat.
The polymer membrane needs about two hours between coats, and tiles go on it the next day. The cementitious coating needs about three hours between coats at +20 °C and three days before tiling, and all that time we keep it covered from sun and rain. So in a bathroom with the polymer membrane, application and the water test usually fit into 2–3 days, while in a walk-in shower without a tray and on a balcony, where the cementitious coating goes on, the stage takes longer, especially in cold, damp weather.
Water test and sign-off of the layer
Once the layer has cured, we plug the floor drain, put a temporary upstand along the edge, at the bathroom door or along the edge of the balcony, and flood the floor until the water covers the highest point. We mark the level on the wall with a marker and check it against the mark 24 hours later. At sign-off, on site or by video, we check that:
- the base doesn't show through anywhere, and there are no pinholes or bubbles in the layer;
- the tapes are embedded in the compound, their edges aren't lifting and there are no creases;
- the layer goes up the walls to the agreed height and runs under the threshold;
- the collars and the drain flange are coated over with compound;
- after 24 hours under water the level hasn't dropped and it is dry below.
We fix any fault straight away, while it isn't under tiles yet. Tiles go on a flexible adhesive compatible with the compound; more on this in the section on tile laying.
How much bathroom and balcony waterproofing costs in Batumi
Labour for a two-coat liquid waterproofing membrane costs from 30 ₾ per m², and up to 42 ₾ with our materials. Waterproofing tape at corners and junctions is a separate line, at 14–18 ₾ per linear metre.
A complete 4–6 m² bathroom, with the floor, walls up to 20–30 cm and the shower area, comes to 750–1,080 ₾. Balcony waterproofing with a cementitious coating or liquid rubber costs 69–96 ₾ per m² with materials. Screed, if we redo it, is priced separately.
A walk-in shower without a tray, many pipe outlets and corners, and cracks and gypsum plaster in the wet area all push the price up. The final cost is set after the site measurement and once the estimate is agreed, and the price of the stage in the contract doesn't change unless the scope does.
Stages and timelines
-
Inspection and choice of compound
1 day
We measure the moisture in the screed and walls, tap them for hollow spots, and check the levels of the floor drain and outlets. We decide where the polymer membrane is needed and where the cementitious coating.
-
Preparing the base
1 day
We remove the dust, cut back lumps, fill cracks, form chamfers and fillets, and prime.
-
Tapes and two coats
1 day
We bed tapes, corner pieces, collars and the drain flange into the fresh compound, then apply the second coat at right angles to the first.
-
Drying
1–3 days
The layer cures for the time given on the technical data sheet, with a dehumidifier in winter. On a balcony we cover the cementitious coating against sun and rain.
-
Water test and handover for tiling
1–2 days
For 24 hours we keep water above the highest point of the floor, check the level against the mark, film the layer and sign the acceptance certificate.
Local specifics in Batumi
According to their technical data sheets, both our compounds are applied at an air humidity of no more than 80%, and in a Batumi apartment in winter the air is often damper than that, especially after fresh screed and plaster. So we close the bathroom and switch on a dehumidifier or the air conditioner in dry mode, which keeps running through application and drying, and only then apply the first coat. Otherwise the polymer membrane takes days to dry instead of hours, and the second coat goes onto a first coat that is still damp.
The data sheet gives +5 to +25 °C for applying the cementitious coating, but by midday in summer the slab of a south- or west-facing balcony gets hotter than that, and the coating sets on it before it can be spread out evenly. We waterproof such balconies in the morning or evening and cover the fresh layer from the sun. In autumn and winter we pick dry days from the forecast so that no rain falls on the fresh layer.
In a new build, the apartment below is often empty or let short-term, so we can't always look in on the neighbours during the water test. We arrange access through reception in advance and film the water level at the start and end of the 24 hours.
Materials and brands
In wet areas we work with the Ceresit, Mapei and Weber systems. All three are sold in Georgia, and each has a polymer membrane for bathrooms, a flexible cementitious coating for showers and balconies, tapes, corner pieces, collars and tile adhesive for use over waterproofing. We don't mix brands on one job: one system's tape may not bond well in another's compound.
We choose floor drains with a flange designed for liquid waterproofing. The tile adhesive is flexible, class C2 S1, unless the compound's data sheet calls for something else. Bitumen-based liquid rubber only goes where there will be no tiles on top: cement-based adhesive bonds poorly to it.
What makes up the cost
Timeline: 5–6 days for a 4–6 m² bathroom with a polymer membrane, from inspection to water test; the cementitious coating in a walk-in shower without a tray or on a balcony needs a couple of days more
- the area is measured across the floor plus the strip up the walls
What raises the cost
- a walk-in shower without a tray: cementitious coating up to the shower head, a drain flange and more tape
- many pipe outlets, corners and recesses, each needing a collar or tape
- cracks, voids and gypsum plaster in the wet area, which we put right first
- an open balcony: cementitious coating and protecting the fresh layer from sun and rain
What lowers the cost
- level, dry screed and cement plaster, ready for primer
- a WC without a shower, where the layer goes up the walls only around the edge
We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.
Get an estimateGuarantees
Waterproofing is covered by our 2-year warranty on the work. If water gets through our layer to the neighbours, we open up that area, redo the waterproofing and restore the tiles at our own expense. The photos of the layer and of the water test in the handover file show where to open up. If another crew tiled over our layer, the video of the test and the signed certificate confirm its condition at handover.
Questions and answers
How much does bathroom waterproofing cost in Batumi per m²?
Labour for a two-coat liquid waterproofing membrane costs from 30 ₾ per m², and up to 42 ₾ including our materials. Tape at corners and junctions is priced separately, at 14–18 ₾ per linear metre. A complete 4–6 m² bathroom, with the floor, the strip up the walls and the shower area, costs 750–1,080 ₾.
We measure the area across the floor and the walls the layer goes up, so with a walk-in shower without a tray it is larger than it looks on the plan. We send a preliminary estimate from photos within 24 hours on business days, and the final cost is set after the site measurement and once the estimate is agreed.
How long does waterproofing under tiles last?
Under tiles the layer is protected from sun, knocks and wear, and if the base doesn't move, it lasts as long as the tiling above it. What shortens its life is a crack in the screed, settlement around the floor drain, or a fixing driven into the shower floor after the renovation.
The first things to age in a bathroom are the silicone joints and the grout, and they are replaced as consumables. If water has started getting behind the bath or under the threshold, start with them. Our warranty on waterproofing is 2 years. We don't quote a service life beyond that: it depends on what happens to the bathroom after we leave.
Can a balcony be waterproofed without removing the tiles?
There are clear coatings applied straight over the tiles and joints. They help when water gets in only through cracks in the grout and the tiles themselves are firmly bonded. They don't last as long as a layer under the tiles, especially on the sunny side, and have to be renewed.
If the tiles sound hollow, the fall runs towards the wall or water gets under the threshold, a sealer won't help: the water is already under the tiling. Then we remove the tiles and screed in that area, redo the waterproofing and test it with water. We tell you what suits your balcony after an inspection and a flood test.
Do I need bathroom waterproofing if the developer has already done it?
First we look at where and how it was done. Sometimes the developer lays the layer only under the screed or only on the floor, whereas what's needed is a layer under the tiles, carried up the walls, with tape in the corners and collars on the outlets. If no layer is visible on the bare screed, we assume there isn't one.
Ask the developer for photos of the waterproofing and the water test. If there are none, we apply a new layer over the existing screed: that is cheaper than lifting tiles later. If there is a layer and it looks intact, we keep water on it for 24 hours and decide based on the result.
Who is responsible for a leak if another crew lays the tiles?
We are responsible for the layer we installed and handed over. Before handover we photograph and film it, keep it under water for 24 hours and sign a certificate with you or your crew. From then on, whoever works on the layer is responsible for what happens to it.
Most often the layer is damaged after we have left: people walk on it in shoes with sand on them, drop tools, or drill into the floor for a holder. Ask your tiler to inspect the layer before starting and write down any remarks. If a leak turns up at a detail that was intact on the video and that nobody touched, such as a collar or around the floor drain, that is a warranty claim for us.
Further reading
Send photos of the bathroom or balcony, and we'll price the waterproofing within 24 hours on business days
We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.
Mon–Fri 10:00–19:00, Sat 11:00–16:00