Wall levelling in Batumi: plaster, plasterboard or skim coat
Wall levelling in Batumi starts with measuring each wall, and we choose the method by how far it is out. A few millimetres are covered by a skim coat, up to 4–5 cm we bring true with plaster to guide beads, and a wall that leans badly or carries pipes goes behind plasterboard on a frame. Plastering costs from 39 ₾ per m² for the labour, with the mix extra. Before work begins, the estimate shows the decision for each wall and how many centimetres it will take from the room.
from 39 ₾/m²wall levelling with plaster to guide beads, labour only, mix and primer extra. The final price is confirmed once agreed.
- Timeline: 1 to 2 weeks for the walls of a 1+1 apartment of about 45 m², depending on how many walls are plastered and how many lined; drying the plaster comes on top of this, and lining doesn't need it
- Warranty: 2-year warranty on levelled walls and plasterboard lining.If cracks
Who it’s for
In a white frame apartment the developer's walls lean, and the kitchen and wardrobes won't stand straight against them
In a resale apartment the old finishes have been stripped, revealing bumps and loose plaster underneath
You plan to lay large-format tiles or paint a wall next to a floor-to-ceiling window
You need to hide pipes and cables in the wall and keep out the neighbours' noise at the same time
The apartment has to be ready to let for the season, and there is no time to wait for a thick coat of plaster to dry
What’s included
- wall measurements with a straightedge and laser level, a deviation map with photos
- tap-testing and removing loose old plaster
- a choice of method for each wall, on its own line in the estimate
- primer suited to the type of base
- plaster to guide beads: gypsum in the rooms, cement in wet areas
- plasterboard lining on a frame, with backing for heavy items
- mesh over the joints between concrete and blockwork
- squaring corners and reveals
- a check measurement at the same marks and a stage certificate
How we measure the walls before choosing a method
The site foreman measures each wall separately, placing a two-metre straightedge vertically, horizontally and diagonally, while a laser level shows which way the wall leans over its height. The deviations are written in marker straight on the wall and photographed. The result is a deviation map, and it shows where the layer will be a centimetre thick and where it will be five.
We tap-test the base. In a new build, a concrete column and blockwork often meet in one wall; in a resale apartment, the old plaster holds in some places and sounds hollow in others. Whatever is coming away we take back to a sound layer: a new layer won't stay on a weak one and will come off together with it.
The third question at the measurement is what will go on the wall. Paint and wallpaper need a smooth, flat surface, while for tiles plumb walls and square corners matter more. Large-format porcelain tiles need the flattest wall of all: on a 60×120 slab, any bump leaves a lip at the joint.
Skim coat, plaster or plasterboard
We choose the method by the largest deviation and by what will end up behind the wall or on it. One apartment usually has all three: gypsum plaster in the rooms, cement plaster for tiles in the bathroom, and lining on the wall with the pipes.
| Wall | What we do | What to bear in mind |
|---|---|---|
| A deviation of a few millimetres, up to 5 mm over the length of the straightedge, on a sound base | Skim coat: a base coat over the whole wall, then a finishing coat | The quickest option, but a lean over the height and an out-of-square corner will remain |
| A deviation from 5 mm to 4–5 cm | Plaster to guide beads: gypsum in dry rooms, cement in wet areas | Gives a flat, plumb wall. With a deviation of about 4 cm, the layer at the edge already reaches 5 cm, which is the limit for a gypsum mix in one pass, and it takes weeks to dry |
| A deviation of more than 5 cm, service runs on the wall, soundproofing needed or no time to wait | Plasterboard on a metal frame | Takes at least 4–5 cm off the room; heavy items are hung only on backing |
The technique for each method is described on its own page: how plastering to guide beads is done and how long it takes to dry, and how walls are skim coated for different finish levels.
When plasterboard is better value than plaster
Plaster gets more expensive with every centimetre of thickness: more mix goes on, and a thick layer takes weeks to dry. The price of lining hardly depends on the deviation, as the frame stands on hangers at the required distance from the wall anyway. So on a wall that leans badly, plasterboard often works out both cheaper and quicker.
There are other reasons to choose a frame. Pipes and cables can run behind the lining without chasing the concrete. On a wall shared with the neighbours, the same lining is built with mineral wool and fixed on anti-vibration hangers, and then it becomes soundproofing against neighbours, with its own thickness calculation.
There are drawbacks too. Lining takes at least 4–5 cm off each wall, and in a narrow corridor or a 4 m² bathroom that is noticeable. The positions of the TV, shelves and wall cabinets have to be known before the frame is closed: the backing for them goes inside, and it can't be added later. Boxing, niches and ceilings are covered on the page about plasterboard structures.
How much wall levelling costs in Batumi
Levelling with plaster to guide beads costs from 39 ₾ per m² of wall, with the usual range up to 60 ₾. That is the price of the labour. The mix is priced separately, from 10 to 14 ₾ per m², and more of it goes on a leaning wall; primer adds 4–7 ₾ per m². Plasterboard lining on a frame costs 45–54 ₾ per m² for the labour, and the boards and profiles are also charged separately.
The cheapest wall is one that only needs a skim coat: skim coating for painting costs from 23 ₾ per m². A thick layer, different bases on one wall, lots of reveals and short stretches of wall between openings cost more. If an old wall is cracked and we reinforce the whole of it with fibreglass mesh, that adds another 26–30 ₾ per m². Large flat walls without openings, where a plastering machine can be used, are closer to the lower end.
We send a preliminary estimate from photos and a plan within 24 hours on business days. The final cost is set after the site measurement and once the estimate is agreed, and each wall has its own line in it, with the method and the area.
What we check when signing off levelled walls
We sign off a wall against the same marks as before the work started. The foreman puts the straightedge where the deviation map showed the largest figures and films it, and a laser line shows the plumb from floor to ceiling. Our tolerance for paint and tiles is 2–3 mm under a two-metre straightedge, and for large formats closer to 2 mm. If you are not in Batumi, the foreman will repeat the measurement on a video call at any point you name.
Besides flatness, we look at the places where a mistake would show up later. Corners for the kitchen and wardrobes are checked with a square, and door openings for plumb, so that the door frame goes in without wedges. Lining is checked by hand: the board mustn't flex between the profiles, and the board joints must sit on a profile. Plaster is tap-tested. A hollow sound means the layer has come away, and that area is redone before the skim coat.
What to decide before levelling and what comes after
Levelling closes up the wall, so before the guide beads and the frame go up, we need answers from the owner:
- where the kitchen, wardrobes and bath will stand, because there we bring the corners to 90 degrees;
- which walls will be tiled and which painted, since the mix and the tolerance depend on it;
- what will hang on the lining, so that we fit backing for it.
By this point the runs and back boxes are already in the wall; we have described the order of rough work before the guide beads together with the plastering technique.
A flat wall is not yet ready for finishing. Plaster dries until the moisture meter gives the right reading, the joints on plasterboard are filled, and only then comes the skim coat for paint or wallpaper. For tiles, the wall is only primed after plastering, and in a bathroom waterproofing goes on top. We measure for a custom kitchen on the finished walls: measurements taken from bare concrete are no good for it.
Stages and timelines
-
Measurements and deviation map
1 day
The site foreman goes over every wall with a straightedge and laser level, writes the deviations straight on the wall and photographs them.
-
Decisions for each wall
1–2 days
For each wall we choose the method and layer thickness, work out how far the wall will come into the room, and agree this with you.
-
Preparing the base
1–2 days
We knock off anything that sounds hollow, prime, cover the joints between concrete and blockwork with mesh, and mark out the frame and backing.
-
Levelling
1–2 weeks
We plaster to guide beads, or build the frame and board it. Runs inside the frame are photographed before it is closed.
-
Drying and joints
1–4 weeks
The plaster dries until the moisture meter shows the right reading: gypsum in the rooms usually takes 1–2 weeks, cement in the bathroom 3–4. Meanwhile we fill the joints and screw heads on the plasterboard.
-
Check measurement and certificate
1 day
We repeat the measurement at the same marks as before the start and sign the stage certificate on site or by video call.
Local specifics in Batumi
In Batumi's new builds with a cast-in-place concrete frame, one wall is often made of two materials: a concrete column or pier with blockwork in between. The column is often straighter and stands proud of the blockwork, so we take the plane from it, and the layer over the blocks ends up thicker.
We are more careful with plasterboard on external walls. In winter such a wall is cold, and condensation settles in the air gap between it and the board. With the local humidity, mould quickly takes hold there, and from the outside you can't see it until the first patch appears on the wallpaper. So we level external walls with plaster, and line them only together with insulation and a vapour barrier designed to a calculation.
The season affects the choice too. From November to March a thick coat of plaster takes noticeably longer to dry than in summer. If the apartment has to be ready by July, internal partitions that lean badly are better lined: there is nothing to dry, and skim coating can start as soon as the joints are filled.
Materials and brands
For gypsum plasters in the rooms and for the lining system we use Knauf: profile, board and jointing filler from one range fit together better. Moisture-resistant board for the bathroom and kitchen is Knauf or AK Bulut. Cement plaster for wet areas is chosen to suit the tile adhesive and waterproofing that will go over it, for example Weber adhesive, and we check that the layers are compatible against their technical data sheets.
We usually space the frame studs at 60 cm. For tiles we place them every 40 cm and board the wall with two layers: otherwise the board flexes under the tiles and the joints crack. The tracks are fixed to the floor, ceiling and walls over sealing tape, which closes the gaps around the perimeter and lets less sound through from the neighbours.
What makes up the cost
Timeline: 1 to 2 weeks for the walls of a 1+1 apartment of about 45 m², depending on how many walls are plastered and how many lined; drying the plaster comes on top of this, and lining doesn't need it
- what will go on the wall: paint, wallpaper, tiles or large format
What raises the cost
- a wall that leans badly, so the plaster goes on thick
- different bases on one wall and joints between concrete and blockwork
- backing, service runs and soundproofing inside the frame
- square corners for the kitchen and sliding wardrobes
What lowers the cost
- a small deviation, where a skim coat is enough for the wall
- a badly leaning internal wall that is cheaper to line than to plaster
We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.
Get an estimateGuarantees
2-year warranty on levelled walls and plasterboard lining.
If cracks, plaster coming away or open plasterboard joints are caused by our work, we fix them at our own expense, including the materials for the repair. The deviation map from before the start and the check measurement afterwards are kept in the stage report: they show what flatness we handed over.
Questions and answers
How much does wall levelling in Batumi cost per m²?
Levelling with plaster to guide beads costs 39–60 ₾ per m² of wall; that is the labour. The mix is priced separately at 10–14 ₾ per m², and primer at 4–7 ₾. Plasterboard lining on a frame costs 45–54 ₾ per m² for the labour, without the boards and profiles. If a skim coat is enough for the wall, the labour for painting starts from 23 ₾ per m².
Walls that lean, reveals and full reinforcement with mesh will be closer to the upper end. We send a preliminary estimate from photos within 24 hours on business days, and the final cost is set after the site measurement and once the estimate is agreed.
How many centimetres does wall levelling take from the room?
Plaster brings the face of the wall forward by about a centimetre from its most protruding point: the guide bead itself takes 6 mm, and a few more millimetres go on the gypsum under it. If a wall leans by 3 cm over its height, the layer will be about a centimetre at one edge and about 4 cm at the other, and the room loses only that centimetre at the protruding edge. Plasterboard on a frame takes at least 4–5 cm, or 8–10 cm with mineral wool soundproofing.
In a room this is hardly noticeable, but in a bathroom or corridor we work it out in advance: whether the bath will fit between the walls, whether the opening will be wide enough for the door, whether the lining will cover the outlets. We write these dimensions into the estimate for each wall.
Can just one wall in a room be levelled?
Yes, this is often done for a kitchen, a sliding wardrobe or a wall-mounted TV. We bring that wall flat and plumb, and the adjoining walls stay as they are. Where it meets them there is a step of anything from a few millimetres to a centimetre, and we feather it out with plaster onto the next wall so that the transition doesn't show under paint.
If the wall has pipes on it or needs soundproofing, it can be simpler to line just that one wall: the frame doesn't touch the neighbouring walls, and a corner profile covers the junction. A small job comes out closer to the upper end of the price per metre, because the guide beads, mixing and cleaning up are the same while the area is smaller.
Do the corners have to be brought to 90 degrees?
Not everywhere. Guide beads give each wall a flat, plumb surface, but a right angle between two walls is a separate task: the beads on both walls are set from one set of marks, and in an out-of-square room the layer on one of them comes out thicker. That means extra mix and extra days of drying.
So we bring a corner to 90 degrees where it can be seen or where the dimensions require it: where a kitchen, a sliding wardrobe, a bath or a glass shower screen will go, and wherever tiles run with straight joints. A corner behind the bed or in a storeroom can stay as it is. Such corners are priced separately in the estimate.
Can walls be levelled without guide beads?
Yes, if the deviation is small and you need a smooth wall rather than a perfectly flat one. Then a base skim coat or a thin coat of plaster is drawn with a wide straightedge over the wall itself: ripples and pits disappear, but the overall lean remains. For wallpaper or matt paint in a bedroom, that is often enough.
When you need a flat surface for tiles, a kitchen, sliding wardrobes or concealed doors, guide beads are a must. Only beads set with a laser give a wall plumb and a right angle to the adjoining wall, and their line shows in advance how thick the layer will be.
Related services
Further reading
Send photos of your walls, and we'll tell you how to level them and what it will cost
We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.
Mon–Fri 10:00–19:00, Sat 11:00–16:00