Preparing an apartment for renovation: strip-out, debris bags and a new aerated concrete partition

Demolition works in Batumi before an apartment renovation

We carry out demolition works in Batumi before an apartment renovation: we remove tiles, floors, screed, old plaster, sanitary ware and partitions, and cut openings. Before the first blow we check what runs inside the wall, and we don't touch load-bearing structures without a design. Strip-out of finishes costs from 36 ₾ per m² of floor; that is labour, and waste removal is priced separately. Everything uncovered under the old finishes is photographed.

from 36 ₾/m²strip-out of finishes per m² of floor, labour only, waste removal extra. The final price is confirmed once agreed.

  • Timeline: 1–2 days for a bathroom of about 4 m², 5–10 days for a 1+1 apartment of about 45 m² taken back to the base, including carrying out the waste
  • Warranty: 2 years' warranty on work
Get an estimate

Who it’s for

  • You have bought an apartment with someone else's renovation and want it taken back to the concrete before pricing a new one

  • You need to remove the partition between the kitchen and living room or cut an opening in a block wall

  • The bathroom is being redone: the tiles, bath and screed go, while the riser and the neighbours' pipes stay

  • In green frame, the developer has laid tiles and laminate that don't suit your design

  • The owner is abroad and needs demolition with photos of everything uncovered under the finishes

What’s included

  • marking out what comes down, and locating cables and pipes from the diagram and with a detector
  • checking the load-bearing walls against the building's documents
  • plastic sheeting and cardboard over everything that stays in the apartment, and lift protection while carrying out
  • stripping wallpaper, paint, loose plaster and boxing
  • removing tiles, floor coverings, screed and ceilings
  • taking down non-load-bearing partitions, and cutting openings with lintels
  • removing sanitary ware, doors and built-in furniture, keeping them if agreed
  • bagging the waste and carrying it out to the vehicle
  • photos of the exposed walls and slab, and a list of the defects found

Prices: demolition

from 36 ₾/m²

WorkPrice
Strip-out of old finishes36–54 ₾/m²
Block partition demolition61–96 ₾/m²
Tile removal24–30 ₾/m²
Screed removal69–90 ₾/m²
Laminate, parquet or linoleum removal12–18 ₾/m²
Cutting an opening in a block wall390–480 ₾/pc
Bagging and carrying out waste (per bag)8–9,5 ₾/pc

strip-out of finishes per m² of floor, labour only, waste removal extra. The final price is confirmed once agreed.

What we check before the first blow

We start demolition works in Batumi with a pencil and a detector, and only then pick up the hammer drill. The site foreman marks on the walls what comes down and what stays, and traces the cables and pipes from the diagram of the previous renovation if it has survived, or with a detector where there is no diagram. Separately, we check against the building's documents which walls are load-bearing.

Without approval, the crew does not touch:

  • load-bearing walls, columns and slabs: these are changed only to a design and with a permit;
  • shared water and drain risers: the building's maintenance service shuts them off on a scheduled day;
  • ventilation shafts, even when they are hidden in boxing: the neighbours' air runs through them;
  • gas pipes: disconnection and rerouting are usually done by the gas company on request;
  • balcony railings and glazing, if the building's rules set how they look.

Demolition works in Batumi: what we do and how we price it

In the estimate, demolition is broken down into lines, because a metre of tiles and a metre of wallpaper take different amounts of work and produce different amounts of waste.

What we removeHow we price itWhat we look out for
Old finishes: wallpaper, paint, loose plaster, boxing, ceilingsm² of room floor areaWe go down to a sound layer and keep plaster that holds
Tilesm² of tilingIn the shower and on the balcony we always remove them, otherwise there is no way to check what is underneath
Laminate, parquet, linoleumm² of floorThe underlay and skirting come off with the covering, as there is sometimes damp beneath them
Screedm² of floorWe remove it if it sounds hollow, crumbles or raises the floor above the thresholds
Block partitionsm² of wallNon-load-bearing only, according to the building's documents
Openings in a block wallper openingLintel first, then cutting

Partitions and openings

We don't push a partition over in one go; we take it apart from the top down, a few courses at a time. A block wall weighs hundreds of kilograms, and if it collapses all at once, it can crack the screed, damage pipes in the floor and send a jolt through to the neighbours below. We first cut through the joint with the ceiling and columns, so that the masonry doesn't pull the plaster of the adjoining walls down with it.

An opening in a block wall starts with the lintel. Above the future opening we set in steel angles or a ready-made lintel, and only then cut the block with a diamond blade. The edges come out straight, the door frame goes in without a thick layer of foam, and there is less vibration than with a hammer drill. If the wall is concrete or load-bearing, this is a job for a layout change with a design, not for demolition.

Tiles and screed: the heaviest part

Tiles on old cement mortar come off together with the mortar, right back to the wall, otherwise the new adhesive would go onto a layer that may or may not hold. In a bathroom, once the tiles are off, we check whether there was any waterproofing underneath. We usually redo it, as described on the page about bathroom and balcony waterproofing.

Screed produces the most waste and noise. As a guide, a square metre of screed 5 cm thick weighs about 100 kg, and the floor of a 1+1 apartment adds up to several tonnes. We take it up in sections, with a breaker or a hammer drill in chisel mode, down to the slab, but we don't chip into the slab itself: small chips will be covered by the new layer, and breaking concrete means making noise all the way along the riser. Pipes in the old screed, if you have decided to keep them, are located from the diagram and uncovered by hand. The new layer is poured to guide rails, as described on the page about floor screed.

Dust and noise: how we look after the building

Demolition dust goes wherever the air draws it. So while demolition is under way, we tape plastic sheeting over the ventilation grilles in the apartment: otherwise the dust goes into the shared duct, and with reverse draught it can come out in the neighbours' apartments. We cover the front door with a zipped dust sheet, dampen the debris before collecting it, and tie up the bags right where we are working.

We group the loudest work into a few consecutive days rather than spreading it over two weeks an hour at a time, and tell the neighbours on the riser in advance which days these will be. We keep to the hours allowed by law, 08:00 to 23:00, or to the building's rules if they are stricter.

What is left after demolition

After demolition the apartment is empty and swept. Everything we find under the old finishes is photographed with a note of the room and wall, and added to the list attached to the stage certificate: a damp patch behind a former shower tray, traces of an old leak on the slab, a length of steel pipe by the riser. If a find changes the scope of work, we show it to you first and only then draw up a contract addendum.

The things you decided to keep come off first and are stored in one room under plastic sheeting. Everything else goes into bags as the work proceeds, and waste removal happens in loads, not as one big heap at the end. What is usually worth keeping in old housing stock and in 2010s buildings is covered on the page about renovating a resale apartment.

How much demolition costs in Batumi

Strip-out of old finishes costs from 36 to 54 ₾ per m² of room floor area. That is labour only; bagging the waste and removal are separate lines. Within the range, the price depends on how many layers there are on the walls and ceiling and how firmly they hold.

The most expensive line per metre is screed removal, from 69 to 90 ₾ per m²: it takes the longest to break up and is the heaviest to carry out. Tile removal costs from 24 to 30 ₾ per m² of tiling, and in a bathroom the tiled area on the walls is several times larger than the floor area. Cutting an opening in a block wall, with a lintel, costs from 390 to 480 ₾ per opening.

The final cost is set after the site measurement and once the estimate is agreed. We write the price of the stage into the contract, and it doesn't go up unless the scope changes.

Stages and timelines

  1. Marking out

    1 day

    The site foreman marks on the walls what comes down, checks the runs with a detector and checks the load-bearing walls against the building's documents.

  2. Preparing the apartment

    1 day

    We shut off the water, isolate the circuits that are coming out, tape over the vent grilles, cover what stays with plastic sheeting and fit protection in the lift.

  3. Sanitary ware, doors, furniture

    1–2 days

    Anything that might come in useful is removed carefully and set aside; the rest goes straight into bags.

  4. Walls and ceilings

    2–3 days

    We strip wallpaper, paint, loose plaster, boxing and wall tiles.

  5. Partitions and openings

    1–3 days

    We fit the lintel and cut the opening, and take partitions apart course by course from the top down.

  6. Floor

    2–4 days

    The floor comes up last: the covering with its underlay, the tiles and, if agreed, the screed down to the slab.

  7. Clean-up and photo report

    1 day

    We sweep the apartment, photograph the walls, the slab and the defects found, and hand over the stage with a certificate.

Local specifics in Batumi

In the Old Town, in buildings from the late 19th and early 20th centuries, there are timber floor structures, sometimes with fill between the joists. We take up a floor like this together with the fill, and it produces noticeably more waste than a concrete slab. Ceilings there are sometimes plastered on lath, and we remove the heavy old layer in sections so that chunks don't fall onto a floor whose condition hasn't been checked yet.

Soviet-era buildings sometimes have asbestos cement pipes and sheets. We don't break them up with a hammer drill: we remove them whole, dampen them and wrap them in plastic sheeting separately from the rest of the waste, so as not to release fibres into the air.

In 2010s apartments, plasterboard boxing by bathrooms and along external walls sometimes turns out to be damp inside. We remove it wearing respirators, put the pieces straight into bags, and treat the exposed wall with an antiseptic before a new layer covers it.

Materials and brands

In demolition the brand matters little; the class of tool matters more. We use a construction vacuum cleaner with an M-class filter: it holds the fine dust from concrete and plaster, which quickly clogs a household filter. We cut openings in blockwork with a diamond blade with dust extraction, so the edges are straight and the neighbouring courses don't crack from vibration.

Whatever stays is covered with heavy plastic sheeting on masking tape: windows, radiators, doors that aren't being replaced. We lay cardboard on the floor in the neighbouring rooms. Respirators and goggles are compulsory for the crew, especially when we remove old plaster and mouldy boxing.

What makes up the cost

Timeline: 1–2 days for a bathroom of about 4 m², 5–10 days for a 1+1 apartment of about 45 m² taken back to the base, including carrying out the waste

  • how many items need to be removed carefully and kept

What raises the cost

  • screed and tiles on old cement mortar that are firmly fixed
  • timber floor structures with fill in an old building
  • openings in a block wall with a lintel fitted
  • a building without a service lift, or with short hours for noisy work

What lowers the cost

  • partial demolition: we remove only what gets in the way of the new finishes
  • white frame, where there is almost nothing to remove

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

2 years' warranty on work, 5 years on new pipes and wiring.

The demolition itself is handed over with a certificate and photos: we photograph and film the apartment and the entrance before we start, and these shots show what was damaged before we arrived. If something the estimate said would stay, such as a pipe, a cable or an adjoining wall, is damaged during demolition, this is settled under the terms of the contract.

Questions and answers

How much does demolition in an apartment in Batumi cost per m²?

Strip-out of old finishes costs from 36 to 54 ₾ per m² of room floor area; that is labour only. We price the heavy items separately: tile removal from 24 to 30 ₾ per m² of tiling, screed removal from 69 to 90 ₾ per m², block partition demolition from 61 to 96 ₾ per m² of wall, and cutting an opening in a block wall from 390 to 480 ₾ per opening.

Bagging the waste and removal have their own lines. We give a preliminary price from photos and a description; the final cost is set after the inspection and once the estimate is agreed.

How do you remove old tiles without damaging the pipes in the wall?

First we find the pipes: from the diagram of the previous renovation, if there is one, and with a detector. We also look at the outlets for the mixers and toilet, because the run from them usually takes the shortest route to the riser. Over a pipe run we don't break the tiles with a hammer drill; we remove them with a chisel, working along the joints.

Old steel pipes are usually replaced in a renovation like this, so the care is for the sake of the riser and the neighbours. Plastic pipes that you have decided to keep are pressure-tested once the tiles are off, before a new layer closes them in.

How long does demolition take before an apartment renovation?

A bathroom of about 4 m² with tiles, a bath and screed takes 1–2 days. A 1+1 apartment of about 45 m² taken back to the base, with the screed and one partition, usually takes 5–10 days, including carrying out the waste.

What stretches the timing is not so much the volume as the building: short hours for noisy work, a queue for the service lift, carrying out by the stairs. Old buildings where timber joists with fill turn up under the floor also take longer. We give the exact timing after the inspection and write it into the contract.

What happens to the old sanitary ware, doors and kitchen after demolition?

That is your decision, and it is best made before work starts. Anything you want to keep, sell or give away, we remove carefully: doors with their frames, the toilet, the basin, the kitchen units. These are stored in one room or taken wherever you tell us.

The rest goes out as waste. A cast-iron bath weighs about 100 kg, a long model even more, and it is either carried out whole by three or four people or broken up on site. We discuss this in advance: breaking it up is noisy, and carrying it out whole down a narrow staircase isn't always possible.

Can I order demolition only, without a renovation?

Yes. People do this when their own crew will do the finishing, or when they need to see the condition of the walls and slab before deciding on the scope of the renovation. We fix the scope and price in the contract and hand over the stage with a certificate.

At the end you get an empty apartment with no waste, plus photos of what was uncovered: the walls, the slab, the pipes by the riser. With these photos, any contractor can price the rest of the renovation more accurately than from an apartment with the old finishes still in place.

Further reading

Mark on a photo what should come down, and we'll price the demolition within 24 hours

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site