Laying engineered wood next to porcelain tiles with a flush joint and no threshold

Underfloor heating in Batumi apartments: electric and water

We install underfloor heating in apartments in Batumi: electric under tiles, laminate or wood, and water where the apartment has its own gas boiler. An electric system with materials costs from 110 ₾ per m², and the screed, tiles and thermostat are priced separately. Before laying we work out how many kilowatts the heating will add to the consumer unit, and draw the zones from the furniture plan, so that the cable doesn't end up under a wardrobe or a bed.

from 110 ₾/m²system with materials; screed, tiles and thermostat extra. The final price is confirmed once agreed.

  • Timeline: 2–4 days for electric heating under tiles in the hallway, kitchen and bathroom; a water circuit takes 2–3 days to lay before the screed
  • Warranty: 2-year warranty on underfloor heating installation and circuit pipes
Get an estimate

Who it’s for

  • You are laying porcelain tiles in the hallway and kitchen and don't want to walk on cold tiles in winter

  • Your apartment is in black frame with its own gas boiler, and a water circuit can go into the screed

  • Your renovation has no new screed, but you want heating under laminate or SPC vinyl in the bedroom

  • You are not sure whether the consumer unit and the incoming supply can take underfloor heating along with a water heater and air conditioners

  • You live abroad and want to switch the heating on from your phone before you arrive

What’s included

  • a zone plan based on the furniture layout, and the power calculation for each zone
  • checking against the allocated capacity and the main breaker rating
  • a separate circuit for each zone with RCD protection
  • laying the mat, cable, film or water circuit pipes
  • cable resistance readings before laying, after it and after the floor covering
  • pressure testing the water circuit, and a mixing unit at the manifold
  • a floor sensor that can be replaced without opening up the floor covering
  • fitting the thermostat and setting it up for the floor covering
  • first start-up to a schedule, and a zone diagram in the handover file

Prices: underfloor heating

from 110 ₾/m²

WorkPrice
Electric underfloor heating, with materials110–145 ₾/m²
Water underfloor heating, with materials120–145 ₾/m²
Laying electric underfloor heating (mat up to 5 m²), labour210–240 ₾/pc
Laying water underfloor heating, labour48–60 ₾/m²
Underfloor heating thermostat240–420 ₾/pc
Floor screed to guide rails40–66 ₾/m²

system with materials; screed, tiles and thermostat extra. The final price is confirmed once agreed.

Underfloor heating in an apartment: electric or water

In Batumi apartments we mostly install electric underfloor heating: all it needs is a circuit from the consumer unit, and it can go under almost any floor covering. Water underfloor heating is heated by a boiler, and in an apartment building it is possible when the apartment has its own gas boiler with a heating circuit. Without gas it makes no sense: the water would have to be heated with the same electricity.

Thickness matters too: a water circuit with insulation and screed takes up 7–9 cm and has to go in at the rough-work stage, while a mat in the tile adhesive bed adds only a few millimetres to the floor. Boilers and gas are covered on the page about apartment heating.

OptionWhere we lay itUnder which floor covering
Heating mat in adhesiveHallway, kitchen, bathroom on finished screedCeramic and porcelain tiles
Cable in screedRooms where the screed is being poured againAny, if the floor covering is suitable for underfloor heating
Film under the underlayDry rooms without new screedLaminate and click SPC vinyl, if the range allows heating film
Water circuitAn apartment with its own gas boiler, at the rough-work stageAny, if the floor covering is suitable for underfloor heating

Where to lay the heating: zones by furniture

Underfloor heating goes on the open floor area, not across the whole room. Under a wardrobe, kitchen units or a bed on a solid base, the heat is trapped by the furniture and the cable overheats. So before anything is bought we place the furniture on the plan and mark out the zones where people walk and stand.

Heating is most noticeable on tiles: porcelain draws heat away from your feet faster than laminate and feels colder, so the hallway and the kitchen with porcelain floor tiles come first on the list. Heating in the bathroom is covered on the page about bathroom renovation.

Thermostat: sensors, heating limit, control from your phone

Under tiles the thermostat works from a floor sensor and holds the surface temperature. Under laminate and wood we fit a model with two sensors, air and floor, and limit the heating to the figure in the floor covering instructions, so that the joints and the lacquer don't dry out.

A Wi-Fi thermostat lets you switch the floor on from your phone before you arrive. For a rental apartment we set an upper limit on it that a guest can't raise the temperature above. Most thermostats switch up to 16 A, which is about 3.5 kW, and a more powerful zone we connect through a contactor in the consumer unit.

Load on the consumer unit and the apartment's capacity

A mat under tiles usually draws about 150 W per square metre. Heating in the hallway, kitchen and bathroom on about 12 m² of open floor comes to roughly 1.8 kW, and film in two bedrooms adds another 2–3 kW. But on a winter evening the water heater, the hob and the air conditioners are running along with the floor.

So before laying we check the list of appliances against the capacity allocated to the apartment, from the documents or from the main breaker rating. Each zone gets its own circuit with 30 mA RCD protection. If there is no spare capacity, we fit a load priority relay: it temporarily switches off the heating while the water heater or the hob is running. How we assemble a consumer unit with separate heating circuits is described separately, and a capacity increase is arranged through the network company.

How we lay cable, mats and pipes

Heating cable is never cut or shortened: its length sets its power, so we choose the mat or cable reel to fit the size of the zone, and at the wall we cut only the mat's mesh. The cable runs never cross each other and never pass over a movement joint. The connection joint stays in the adhesive or screed, and only the cold tail goes up the wall to the thermostat. We lay the sensor between the cable runs in a conduit with a capped end, so it can be replaced without opening up the floor. We measure the conductor and insulation resistance three times: out of the box, after laying out and after the tiles or screed, and write the figures in the certificate.

We build a water circuit from cross-linked polyethylene (PEX) pipe with an oxygen barrier, and each loop runs from the manifold as one unbroken length. By a floor-to-ceiling window we space the pipe runs closer together, and in the middle of the room further apart. If the same boiler heats radiators, we fit a mixing unit between it and the manifold: the floor needs cooler water than the radiators. Before pouring, we pressure test the circuit and leave it under pressure while the screed to guide rails goes down: if a pipe gets damaged, the gauge shows it straight away.

First start-up of the heating

We run the first start-up to a schedule, and record the dates of pouring and switching on and the temperature for each day in the certificate. Cement screed over pipes or cable gets at least three weeks, and adhesive over a mat the time on its data sheet. For the first three days a water circuit runs on water at about 25 °C, then over several days it is brought up to working temperature, and with electric heating we raise the thermostat just as gradually. This start-up tests the system but doesn't replace drying: before laminate or wood we still measure the moisture of the screed.

How much underfloor heating costs in an apartment in Batumi

Electric underfloor heating with materials costs from 110 to 145 ₾ per m² of heated area, and a water circuit with materials 120–145 ₾ per m². A small zone we price as a single item: laying a mat of up to 5 m² costs 210–240 ₾ in labour, not including the mat. Laying a water circuit as labour only comes to 48–60 ₾ per m².

The thermostat is extra, 240–420 ₾ depending on the model, as is screed if we pour it again, 40–66 ₾ per m², and the floor covering itself. The final cost is set after measuring up and agreeing the estimate.

Stages and timelines

  1. Zone plan and calculation

    1–2 days

    We place the furniture on the plan, mark out the open areas, work out the power and check it against the incoming supply.

  2. Circuits in the consumer unit

    1–2 days

    We run circuits to the thermostats and fit protection, and if capacity is short, we add a load priority relay.

  3. Base

    1–2 days

    For a water circuit or cable we lay insulation and a perimeter strip, and under a mat we prime the flat screed.

  4. Laying the system

    1–2 days

    We lay out the mat, cable, film or pipes, measure the resistance or pressure test, and photograph the layout.

  5. Screed or floor covering

    1 day to 2 weeks

    We pour the screed, lay tiles on adhesive over the mat or laminate over the film, and measure the cable again.

  6. First start-up

    3–7 days

    We switch on after the time on the data sheet, raise the temperature to a schedule, and set the program and the heating limit.

Local specifics in Batumi

Many apartments in Batumi are heated with air conditioners in winter, and underfloor heating here complements them rather than replacing them. So the heated area can be kept small: where people stand barefoot and where there are tiles.

Not every new build has gas. If you are thinking about water underfloor heating, we first check whether the building has gas and where in the apartment the manifold cabinet can go: it needs a recess near the pipe run from the boiler, which usually hangs in the kitchen or on the balcony.

New builds by the sea have a lot of floor-to-ceiling glazing. In winter cold air flows from that glass across the floor, and condensation collects on the bottom profile of the frame. So a strip of heating along the window, where no furniture will stand, is one of the first things we suggest: it warms your feet and dries out the bottom of the frame.

Underfloor heating is not the way to dry out an apartment that stands empty in winter: it is expensive, and without airing the moisture doesn't go. That is what a dehumidifier or an air conditioner on dry mode is for, and the heating is switched on in time for your arrival.

Materials and brands

Under tiles we lay mesh mats with twin-core shielded cable: it has a single cold tail, and the shield is connected to earth. In screed we use the same cable on fixing tape. We lay film only under laminate or click vinyl, only if the floor covering instructions expressly allow it, and together with an underlay that is compatible with underfloor heating.

For a water circuit we use cross-linked polyethylene (PEX) or PE-RT pipe with an oxygen barrier, a manifold with flow meters and a mixing unit. In the consumer unit we fit ABB, Schneider Electric or Legrand breakers and protection devices. We choose mats and thermostats from what is sold in Georgia, so that a sensor or thermostat can later be replaced without ordering from abroad.

What makes up the cost

Timeline: 2–4 days for electric heating under tiles in the hallway, kitchen and bathroom; a water circuit takes 2–3 days to lay before the screed

  • floor covering: heating is more noticeable on tiles than on wood

What raises the cost

  • a water circuit with a mixing unit and manifold
  • several zones, each with its own thermostat
  • new screed for cable or pipes
  • consumer unit upgrades and a load priority relay if capacity is short
  • a thermostat with phone control

What lowers the cost

  • a mat in adhesive under tiles on finished screed
  • one zone in the hallway and kitchen instead of the whole apartment

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

2-year warranty on underfloor heating installation and circuit pipes. The supply circuit from the consumer unit to the thermostat, concealed in the wall or floor, counts as concealed wiring and has a 5-year warranty. We pressure test and photograph the circuit pipes before the screed, and record the cable resistance after laying and after the floor covering in the certificate: it shows whether the cable was damaged during installation. The mat, cable, film and thermostat carry the manufacturer's warranty, and we hand over their documents in the handover file.

Questions and answers

How much does underfloor heating in an apartment in Batumi cost per m²?

Electric underfloor heating with materials costs from 110 to 145 ₾ per m² of heated area, and a water circuit with materials from 120 to 145 ₾ per m². The thermostat is priced separately, at 240–420 ₾ each, and if the heating needs new screed, that adds 40–66 ₾ per m². Tiles or another floor covering are not included in this price.

We send a preliminary estimate from the plan and a list of appliances within 24 hours on business days. The final cost is set after measuring up and agreeing the estimate, once it is clear how many zones there will be and whether the consumer unit has enough capacity.

Does the floor need insulating under underfloor heating in an apartment?

Under cable in screed and under a water circuit, yes. Without insulation a good part of the heat goes downwards, into the floor slab and the ceiling of the neighbours below, and the floor takes longer to warm up. Extruded polystyrene boards a couple of centimetres thick are usually enough, and we allow for their thickness in the floor level.

A mat is laid straight onto finished screed, and there is usually no room for insulation under it. So a mat warms up more slowly and suits small comfort zones rather than heating a room. Under film goes the underlay that its manufacturer approves.

How much electricity does underfloor heating use?

A 5 m² mat at about 150 W per square metre draws 0.75 kW, but only while the thermostat has the heating on. A warmed-up floor works in cycles, so over a day it uses noticeably less than its power multiplied by 24 hours.

Exactly how much depends on the set temperature, the insulation under the system and how many hours a day the floor is on. A program saves the most: the floor heats in the morning and evening, and at night and during the day, when nobody is home, it holds a lower temperature or is switched off.

Can an apartment be heated by underfloor heating alone?

With a water system from a gas boiler, yes, if the circuit is laid throughout the apartment at the rough-work stage. With electric it is harder. It turns a kilowatt-hour into the same amount of heat, while an inverter air conditioner on heating gives several times more heat for the same kilowatt.

For an electric floor to heat a room on its own, it needs a large open floor area and spare capacity on the incoming supply, and in a furnished apartment that is rare. So in winter we leave the main heating to the air conditioners or the boiler, and lay underfloor heating where feet get cold.

What should I do if the underfloor heating has stopped working?

First look at the consumer unit: check whether the breaker or the RCD has tripped. If the protection trips again when you switch on, don't switch that circuit on again and write to us: it means there is an earth leakage somewhere. If the consumer unit is fine but the thermostat shows an error or a strange temperature, the floor sensor is most often to blame, and it can be replaced without lifting the tiles.

Next, an electrician measures the cable resistance and compares it with the figure in the certificate. If the cable is damaged, the spot is found with an instrument and one or two tiles are opened up, not the whole floor.

Further reading

Send us the apartment plan and a list of appliances, and we'll price the underfloor heating and the load on the consumer unit

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site