Designer apartment renovation in Batumi to working drawings

We carry out designer renovation of apartments in Batumi to a finished project: working drawings, wall elevations and a materials schedule. Before the estimate, the foreman and an engineer check the sheets against the apartment and gather questions for the designer. Then we build concealed doors, walls that stay flat in side light, microcement and large-format porcelain exactly to the dimensions. Labour with rough-work materials and complex finishes costs from 930 ₾ per m². The project can be ours or your own designer's.

from 930 ₾/m²labour, rough-work materials and complex finishes; project and finishing materials extra. The final price is confirmed once agreed.

  • Timeline: 3.5–5 months for a 1+1 apartment of about 45 m² from white frame with a finished project, not counting the time to design it
  • Warranty: 2 years on the work, 5 years on concealed pipes and wiring
Get an estimate

Who it’s for

  • You have a finished design project and need a contractor who will build the apartment exactly to the working drawings

  • The project was drawn by a designer from another country, and it needs checking against an apartment in Batumi and local materials

  • The project has concealed doors, microcement, large-format porcelain or ceilings with lighting recesses

  • You live abroad and sign off stages by video: the foreman shows the project sheet and the same detail on the wall

  • The apartment is for you or your family, and a consistent style and dimensions accurate to the centimetre matter

What’s included

  • checking the project against a measured survey, with a list of questions for the designer
  • an estimate from the materials schedule, with a price for each item
  • a delivery schedule for made-to-order materials
  • setting out partitions, sockets and outlets from the drawings
  • built-in supports for wall-hung sanitary ware, concealed doors and recessed lighting
  • preparing walls for side light, microcement and large-format tiles
  • finishing to the wall elevations and tile layouts
  • photos of concealed work and as-built diagrams in the handover file
  • stage sign-off checked against the project sheets

Prices: designer renovation

from 930 ₾/m²

WorkPrice
Designer renovation930–1 320 ₾/m²
Full design project (layout, 3D, drawings)145–190 ₾/m²
Decorative plaster75–96 ₾/m²
Microcement for walls170–215 ₾/m²
Laying large-format porcelain tiles140–180 ₾/m²
Multi-level plasterboard ceiling with a lighting recess90–120 ₾/m²
Concealed door installation390–480 ₾/pc

labour, rough-work materials and complex finishes; project and finishing materials extra. The final price is confirmed once agreed.

What a design project needs before we can build from it

We carry out designer renovation of apartments in Batumi to a finished design project, and for that the crew needs drawings with dimensions. A 3D render shows how a room will look, but you can't mark out a socket from it. So before the estimate we open the project folder and check which sheets it contains.

  • a measured plan and a partition plan, dimensioned from the grid lines and corners;
  • electrics and lighting: socket heights from the finished floor level, lighting circuits, switches;
  • plumbing: water and drain outlets, the models of mixers and installation frames;
  • wall elevations for the bathroom and kitchen, tile layouts, floor and ceiling plans;
  • details: concealed doors, niches, junctions between different materials;
  • a materials schedule with product codes and quantities.

If some sheets are missing, we say exactly which ones and ask for them before work starts: a detail drawn after the wall is already up usually means rebuilding that wall. You can also order the design project from us, and then the designer and the foreman go through it together before the estimate.

Checking the drawings against the apartment before the estimate

A project is drawn from a measured survey or from the developer's plan, and the real apartment almost always differs a little from the paper. The foreman and an engineer go through the sheets on site with a tape measure and a laser level, looking for what a picture doesn't show.

First come the floor levels. The screed, adhesive, porcelain tiles and underfloor heating together add up to a thickness that has to match the threshold of the front door and of the balcony door. Then the fall of the drains: if the bathroom or the sink is moved away from the riser, the pipe needs a fall, and sometimes the floor is raised to make room for it. And finally the services: whether the power allocated to the apartment is enough for the appliances on the schedule, and where the air conditioning lines and their condensate drains will run.

We read the materials schedule with the climate in mind. Gypsum-based decorative plaster in a shower, veneered panels by the balcony door and wallpaper on a cold external wall by the sea don't last long, and it is better to find replacements for them before the estimate. We gather all the questions into one list for the designer and price the job from the answers.

The details a designer renovation depends on

The details are built the same way as in a careful Euro renovation with concealed doors and shadow gaps: door frames go in before the skim coat, walls are finished to look flat in side light, large-format tiles follow the layout. The difference is that the designer sets the dimensions and junctions. Before work starts, we check that each sheet has enough information to build the detail without guesswork.

  • For a concealed door, the drawing needs the leaf height, the opening side and the finish. If the leaf is clad with a panel or tiles to match the wall next to it, the frame and hinges are chosen for that weight and thickness before the door is ordered.
  • Dark matt paint next to a floor-to-ceiling window needs a high-grade skim coat. We use the plan to see which walls will get light from the side and price them as a separate line in the estimate.
  • We check the large-format porcelain layout against the wall elevation: which slab the mixer lands on, where the cut by the niche will fall. A 120×240 cm slab also has to get up to the apartment, so we check the lift and the stairwells in advance.
  • A ceiling plan with lighting recesses must show the levels of the recesses, the air conditioning runs and the access hatches to the LED strip drivers. If there are no hatches on the sheet, we agree their positions with the designer, otherwise the driver can't be reached later.
  • Where microcement meets wood, or a panel sits flush with a skimmed wall, we need a section through the detail: what separates the materials and what gap is left for sealant or a profile.

If you are still deciding what to use in the shower, see the comparison of microcement and tiles on cleaning, joints and how easily each can be repaired.

How much a designer apartment renovation costs in Batumi

A designer renovation costs from 930 ₾ per m² of apartment floor area, and the usual range goes up to 1,320 ₾. The price covers labour, rough-work materials and the complex finishes in the project. Finishing materials from the schedule and the project itself are priced separately: a full design project with a layout, 3D and drawings costs from 145 ₾ per m².

Within that range, the price is moved by the details from the previous section. Microcement on walls costs from 170 ₾ per m², and a concealed door from 390 ₾ each. An apartment where every interior door is concealed and both bathrooms are finished in microcement will be closer to the upper end. Projects come out cheaper when the complex finishes are concentrated in the living room and bathroom, while the bedrooms get ordinary paint and standard-size tiles.

We price the estimate from the schedule, item by item, so it contains few assumptions. The final cost is set after the site measurement and once the estimate is agreed, and the price of each stage is written into the contract.

Materials schedule, purchasing and substitutions

We buy materials from the schedule by product code, and you see each item in the estimate with its price. Made-to-order items, such as large porcelain slabs, concealed doors or sanitary ware from European collections, are ordered as early as the rough stage: they take weeks to arrive, and without them work in that part of the apartment stops.

If an item isn't available in Georgia or its delivery time would break the schedule, we suggest an alternative with the same dimensions and properties and agree it with you and the project's designer. We don't make a substitution without that approval, even if it is cheaper. Where colours have to match, for example microcement next to tiles or paint matched to the door veneer, we make a test patch on site and show it to the designer before the main work.

You don't have to hunt down the furniture, lighting and textiles from the same schedule yourself: we can take on furnishing the apartment to the project list and fit the deliveries into the renovation schedule.

If the project was done by another designer

We work from another designer's project the same way as from our own. The foreman collects the crew's questions and sends them to the designer as one list in a shared chat, so the answers don't get lost in phone calls. A corrected sheet arrives with a new date, and on site we build only from the latest version.

If the designer changes a decision after a detail has been built, we put the rework into a contract addendum with its price and timing. A detail built to anything other than the latest version of the sheet counts as a defect in our work, and we fix it at our own expense, like any defect under the warranty. An error in the drawing itself is corrected by the project's designer, so we raise any doubts about the sheets before work starts on that part of the apartment.

Designer supervision, sometimes called author's supervision, and the foreman's checks don't get in each other's way: the designer watches over the concept, and the foreman over how it is built. If you haven't yet decided whether the apartment needs a full project, start with our look at renovating with or without a designer.

Sign-off against the drawings, and as-built diagrams

We sign off each stage against the same sheets we built from. When the electrics are signed off, the foreman measures the height of every socket from the finished floor level and checks it against the plan. On the tiling, the foreman checks whether the joints match the elevation and where the cut tiles ended up. You can sign off on site or by video: the foreman shows the sheet and then the same spot on the wall.

On site, a run sometimes departs from the drawing: a cable goes round a beam, a pipe shifts a few centimetres. We mark these places on the sheet, photograph them before they are closed up and put them in the handover file as an as-built diagram. Years later, the wall will be drilled using that diagram, not the project, where the run is drawn differently.

Stages and timelines

  1. Checking the project against the apartment

    3–5 days

    The foreman and an engineer measure the apartment and go through the sheets: dimensions, floor levels, risers, power supply. We gather the questions into one list for the designer.

  2. Estimate from the schedule, and the contract

    3–5 days

    We price every item on the materials schedule and mark the made-to-order materials and the dates they are needed on site. The contract sets the price and timing of each stage.

  3. Setting out and rough work

    3–5 weeks

    We transfer the drawings onto the walls and floor, build the partitions, fit concealed door frames and supports for installation frames, and run the services.

  4. Bases for complex finishes

    3–4 weeks

    We bring the walls up to a standard that holds up in side light, prepare bases for microcement and large-format porcelain, and build the framing for ceilings with recesses.

  5. Finishing to the elevations

    5–8 weeks

    We lay tiles to the layout, apply microcement and decorative coatings, paint the walls, and fit the doors and sanitary ware.

  6. Lighting, furniture and handover against the drawings

    2–3 weeks

    We install the light fittings and LED lighting, assemble the built-in furniture, check the result against the sheets and give you the handover file with as-built diagrams.

Local specifics in Batumi

Projects for Batumi apartments are often drawn by designers from Russia, Israel or Europe, and the schedule ends up with brands that aren't sold in Georgia. Before the estimate we check every item: whether it is sold in Batumi or Tbilisi, and how long it takes to arrive if ordered. That decides when to order it and whether a detail will have to be redrawn for a different size.

Microcement and decorative plaster need a dry base and dry air between coats. In a damp winter, in a closed apartment, the coats take longer to dry, so we build a dehumidifier and spare days into the schedule, and we don't start on a damp wall, even when the deadline is tight.

We bring veneered concealed door leaves, timber wall panels and engineered wood flooring into the apartment only once the plaster, skim coat and screed have dried, and before installation we leave them in the room for a few days. If they go straight from the warehouse into a damp apartment by the sea, a door leaf can warp and the joints in the flooring can open up.

Materials and brands

In a designer renovation the brands are set by the schedule, and we check where to buy them and whether they work together. VitrA porcelain tiles are in the Batumi showroom, Roca 60×120 slabs are sold by Modus, and Italian Marazzi comes from showrooms in Tbilisi. We match deep matt wall colours with Caparol fan decks: the brand has a representative office in Georgia, so the same shade can be bought again later.

We use microcement as one system from one manufacturer, from primer to varnish: coats from different systems don't work together. For 120×240 cm slabs, we choose the adhesive from the professional ranges of Mapei or Weber according to the slab's technical data sheet, because saving on adhesive ends in hollow spots under the tiles.

What makes up the cost

Timeline: 3.5–5 months for a 1+1 apartment of about 45 m² from white frame with a finished project, not counting the time to design it

  • lead times for made-to-order materials

What raises the cost

  • concealed doors, shadow-gap profiles and skirting flush with the wall
  • microcement and decorative plaster over large areas
  • large-format porcelain tiles, especially on walls
  • multi-level ceilings with lighting recesses

What lowers the cost

  • a project with a complete materials schedule: fewer assumptions in the estimate
  • standard-size tiles and ordinary doors in some of the rooms

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

A 2-year warranty on the work and 5 years on concealed services.

The period runs from the date of the completion certificate and is the same for simple painting and for complex details: a concealed door, a lit niche, microcement in the shower. Materials from the schedule carry the manufacturer's warranty, and we pass on their documents together with the handover file.

Questions and answers

How much does a designer apartment renovation cost in Batumi per m²?

From 930 ₾ per m² of apartment floor area, with the usual range up to 1,320 ₾. This price covers labour, rough-work materials and the complex finishes: concealed doors, ceilings with recesses, microcement, large-format porcelain. Finishing materials from the schedule and the design project itself are paid for separately, and the project costs from 145 ₾ per m².

We can be more precise with your project in hand: send the sheets and the schedule, and you will get a preliminary estimate within 24 hours on business days. The final price comes after the site measurement and once the estimate is agreed, and in the contract each stage has its own price.

How is a designer renovation different from a Euro renovation?

A Euro renovation sets the standard of finish: walls flat enough for paint, doors flush with the wall, one floor level in every room, lighting in circuits. Details and tile layouts are drawn for it, but the owner chooses the furniture, colours and decor, often while the work is already under way.

A designer renovation is built to a full project. It includes a furnished layout, wall elevations, a lighting plan, built-in furniture and a schedule of all materials with product codes, so the decisions on site have already been made. The details are built the same way in both cases. The difference is the volume of drawings: an estimate from the schedule can be priced with almost no assumptions, but work on site can only start once the project is ready.

Can materials from the design project be replaced with cheaper ones?

Yes, and the estimate from the schedule shows exactly where a substitution will make a noticeable saving. Usually that means tiles in bedrooms and utility areas, light fittings, door and cabinet hardware and some of the sanitary ware: these are the easiest to find alternatives for in Batumi shops.

We show every substitution to you and the designer before ordering, so as not to break a detail designed around the original item. We don't advise saving on what goes into the wall: the adhesive for large-format tiles, waterproofing, installation frames, concealed door frames. Replacing them later means opening up the finishes, while the difference in price at the start is small.

What if the apartment's dimensions don't match the design project?

That is normal: projects are often drawn from the developer's plan, while walls on site end up a centimetre or two out and the riser turns out to be slightly to one side. So before the estimate we do our own measured survey and check it against every sheet.

Small discrepancies are taken up by cutting tiles and adjusting the furniture, and we agree them with the designer by message. If a wardrobe, a niche or a shower tray doesn't fit, the designer corrects the sheet, and we wait for the new version rather than building from the old one. If this changes the scope of work, we sign a contract addendum before starting.

How long does a designer renovation of a 1+1 apartment take?

With a finished project, a 1+1 apartment of about 45 m² from white frame usually takes 3.5–5 months. The rough work goes the same way as in an ordinary renovation, and the extra time comes from the finishing: microcement needs several coats with drying in between, walls for side light need extra skim coating, large-format porcelain is laid more slowly, and built-in furniture is made after the final measurement.

The timeline is pushed back by made-to-order items and by questions about the drawings that haven't been answered yet. So we order long-lead materials at the rough stage and send the list of questions to the designer before the crew starts. The exact schedule comes after the site measurement and goes into the contract.

Further reading

Send us your design project: preliminary estimate within 24 hours on business days

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site