House shell construction in Batumi: frame, slabs, walls and stairs

House shell construction in Batumi covers the foundation, the concrete frame or load-bearing walls, floor slabs, external walls and the staircase, without the roof and windows. We build it to a design with a seismic calculation, show the reinforcement in photos before every pour and close each stage with a signed report. The price is from 690 ₾ per m² of total floor area; roof, windows and services are extra.

from 690 ₾/m²foundation, frame, slabs, walls, staircase; roof and windows extra. The final price is confirmed once agreed.

  • Timeline: a two-storey 150 m² house shell usually takes 3–5 months after the foundation
  • Warranty: Our work on the shell, masonry and concrete has a 2-year warranty
Get an estimate

Who it’s for

  • You want the shell built and will do the finishing with your own crew

  • You have a design and permit and need a contractor for the structure

  • You are building a three-storey guest house on a concrete frame

  • You live abroad and want to see the reinforcement before every pour

  • You need to compare the estimate for a frame and for load-bearing walls

What’s included

  • review of the structural section of the design before the start
  • cast-in-place concrete frame: columns, beams, floor slabs
  • external walls with joint reinforcement and ties to the frame
  • seismic ring beams, cores and lintels to the calculation
  • a cast-in-place staircase between floors
  • sleeves for soil stacks, ventilation and service entries
  • photos of the reinforcement before every pour
  • stage acceptance reports and a handover file with photos of concealed work

Prices: house shell

from 690 ₾/m²

WorkPrice
House shell (black frame), masonry690–840 ₾/m²
Cast-in-place reinforced concrete house frame without walls (foundations, columns, floor slabs, stairs)650–720 ₾/m²
30 cm aerated concrete wall masonry, with materials145–180 ₾/m²
Cast-in-place floor slab, 200 mm305–350 ₾/m²
Seismic ring beam on masonry (concrete, reinforcement, formwork)100–130 ₾/lin. m
Cast-in-place reinforced concrete stair flight with landing (concrete, reinforcement, formwork)3 900–5 400 ₾/pc
Partition masonry (aerated concrete, breeze block)76–100 ₾/m²

foundation, frame, slabs, walls, staircase; roof and windows extra. The final price is confirmed once agreed.

What the house shell includes

The shell is the structural part of the house without the roof, windows, services and finishes: the foundation, the cast-in-place concrete frame or load-bearing walls, floor slabs, external walls, the staircase between floors and seismic ring beams. In the stage table on the construction hub, the shell together with windows, the entrance door and service connections makes up the black frame. When the shell is finished the house has its form and all its floors, but rain still gets in, and the next step is the roof and windows.

The shell can be ordered on its own, for example if you will do the finishing with your own crew, or as part of a turnkey build. Either way it is built to a design with a structural section calculated to the Georgian seismic code. The foundation is usually part of the shell estimate, and how it is chosen is described on the Foundations page.

House shell construction in Batumi: frame or load-bearing walls

For a private house of two or three storeys in Batumi we most often build a cast-in-place concrete frame: columns, beams and floor slabs of reinforced concrete, with the walls between the columns built of aerated concrete, clay block or brick. The frame takes the seismic load, and the masonry fills the openings and keeps the heat in. The second option is load-bearing walls of block or brick with seismic ring beams and vertical concrete cores. It is cheaper for a small single-storey house, but limits the size of openings and the freedom of the layout.

SchemeWhere it winsWhat to bear in mind
Concrete frame with infillTwo or three storeys, large windows, open plan, a guest houseMore concrete and formwork, details strictly to the design
Load-bearing walls with ring beams and coresA small single-storey house, a simple layoutOpenings and later changes limited by the calculation
Steel or light frameLight houses, extra storeys, a slope without accessIts own requirements for protecting metal by the sea

How the shell rises floor by floor

Every floor of a concrete-frame house is built to the same rhythm. First the columns: reinforcement cage, formwork, concrete. Then the slab formwork on props, two layers of reinforcement mesh, sleeves for soil stacks and ventilation, concrete in one shift. While the slab gains strength, the walls between the columns are built below and the columns of the next floor are prepared above. The stair flight is concreted together with the slab or straight after it.

More on the individual parts: floor slabs, load-bearing walls and partitions, reinforcement and seismic ring beams, staircases.

What we check before the concrete

In a shell almost everything that matters ends up hidden in concrete. So before every pour the site foreman checks the reinforcement against the drawings: bar diameter and spacing, laps, stirrups at the column and beam joints, the cover on spacers. Separately we check the sleeves for soil stacks, ventilation and wiring: a finished slab cannot be cut through later without the engineer's consent. All of this is photographed, and you get the photos before the concrete arrives. You can send your own engineer to sign off the reinforcement.

Weather and protecting the shell

We do not pour concrete in a downpour: water washes cement out of the top layer. In heat the slab is watered and covered so the surface does not crack. Blocks and cement are kept under cover, and fresh masonry is sheeted over at night. We try to close the finished shell with a roof quickly: open slabs soak up water in the rainy season, and screed and plaster then take weeks to dry.

Mistakes that are expensive to put right

  • Columns poured without checking plumb: the walls are then built with cut blocks, and the facade has to be trued up with several coats of render.
  • A slab without sleeves for soil stacks: the sewer then runs through holes broken out next to the reinforcement or in boxing round the rooms.
  • Masonry not anchored to the columns: in an earthquake the whole wall falls out of the frame.
  • Lintels over openings made of whatever steel was to hand instead of concrete to the calculation: cracks appear over the windows.
  • A slab loaded with pallets of blocks on the third day after the pour.

If another contractor started the shell, we first take over what has been built against a signed report with photos and only then carry on.

Timing

A two-storey 150 m² house shell on a concrete frame usually takes 3–5 months after the foundation. Time is driven most by the weather in the rainy season, the complexity of the frame and access for concrete. Each stage closes with a signed acceptance report with photos, and you pay for the next stage after signing.

How much house shell construction in Batumi costs

The shell of a masonry house costs from 690 ₾ per m² of total floor area: foundation, concrete frame, floor slabs, external walls, staircase and seismic ring beams. Individual items: a concrete frame without walls from 650 ₾ per m², a 200 mm cast-in-place floor slab from 305 ₾ per m², 30 cm aerated concrete walls from 145 ₾ per m², a seismic ring beam from 100 ₾ per linear metre, a cast-in-place stair flight from 3,900 ₾. The roof, windows, services and finishes are not part of the shell. We send a preliminary estimate from the house plan within 24 hours on working days; the final cost is set from the design, after a site visit and agreement on the estimate.

Stages and timelines

  1. Preparation

    1–2 weeks

    We check the design, order reinforcement and blocks and prepare the site and access for concrete.

  2. Ground floor columns

    1–2 weeks

    Cages, formwork, concrete, a check of plumb.

  3. Floor slab

    2–3 weeks

    Formwork on props, two meshes, sleeves, photos, concrete in one shift.

  4. Walls of the floor

    2–3 weeks

    Masonry between the columns with reinforcement and anchors, lintels over openings.

  5. Upper floors

    1–2 months

    The same cycle of columns, slab and walls, plus stair flights.

  6. Shell handover

    3–5 days

    Survey of levels and plumb, a signed report with photos, preparation for the roof.

Local specifics in Batumi

In Batumi a shell is built between downpours. Concrete for a slab is ordered against the forecast, not the plan, and we keep a spare day. From October to December rain comes in runs, so we try to finish the big pours before then, and in autumn the masonry goes on under sheeting.

The second local question is getting concrete to the slab. On the narrow streets of the old town and on the Makhinjauri switchbacks there is nowhere for a mixer to stand, so the slab is poured with a boom pump from the next street or concreted in parts at construction joints the engineer has approved. This shows up at the site visit before the estimate. By the sea we also watch the reinforcement cover closely: salty air quickly finds exposed steel.

Materials and brands

Plant concrete with a batch certificate, class to the design, pumped for the slabs. Ribbed reinforcement to the drawings, stirrups bent on site. Slab formwork of plywood on telescopic props, panel formwork for columns. Walls are built of aerated concrete, clay block or brick to the design, in adhesive or mortar, with joint reinforcement. Cover is held by plastic spacers.

What makes up the cost

Timeline: a two-storey 150 m² house shell usually takes 3–5 months after the foundation

  • the rainy season and postponed pours

What raises the cost

  • large spans without columns, and cantilevers
  • three storeys or more, concrete placed by pump
  • a slope or narrow street with no room for a mixer
  • brick or clay block instead of aerated concrete

What lowers the cost

  • a simple rectangular plan with identical floors
  • load-bearing walls with ring beams for a single-storey house

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

Our work on the shell, masonry and concrete has a 2-year warranty. Photos of the reinforcement before each pour and the stage acceptance reports go into the handover file. We build the structure strictly to the design, with changes only with the engineer's written consent.

Questions and answers

How much does a house shell in Batumi cost per square metre?

From 690 ₾ per m² of total floor area for a masonry house: foundation, concrete frame, floor slabs, external walls, staircase and seismic ring beams. The roof, windows, services and finishes are extra. The price moves with spans, number of storeys, wall material and access for concrete. The final cost is set from the design, after a site visit and agreement on the estimate.

How is the house shell different from the black frame?

The shell is the foundation, the structural frame or walls, floor slabs, external walls and the staircase. In the stage table on the construction page, the black frame also includes windows, the entrance door and service connections. On this page, and in the price from 690 ₾ per m², only the shell is counted: the roof, windows and doors are separate lines, so you can see what you pay for at each stage.

How long does it take to build the shell of a two-storey house?

For a house of about 150 m² on a concrete frame, usually 3–5 months after the foundation. Each floor is a cycle of columns, slab and walls, and the concrete gains strength between pours. In the rainy season it takes longer, so we try to do the big pours before autumn.

Can I order just the shell without finishing?

Yes. Many owners order the shell from us and then do the finishing with their own crew or under a separate estimate from us. We hand over the shell against a signed report with photos of concealed work, so the boundary of responsibility is on paper. Our warranty covers the work we did.

How can I check the quality of the shell if I am not in Batumi?

Through photos of the reinforcement before each pour, video calls with the site foreman and the stage acceptance reports. You can hire your own site inspection engineer, and we will agree the days for signing off the reinforcement with them. You pay for the next stage after signing the report; we do not take prepayment for the whole job.

Terms used on this page

Black frame
A new-build apartment without finishing: concrete walls and slabs, windows, service inlets at the entrance, no partitions, screed or plaster.

Further reading

Send us the design or house plan: we will price the shell in 24 hours

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site