Legalising buildings in Batumi: houses, storeys, extensions without a permit

Legalising a building in Batumi turns a house, storey or extension built without a permit into a registered building. Buildings from before 2007 have a simplified route; newer ones go through a fine, an as-is design and a stability report. We do the measured survey and design, prepare the documents and run the procedure, and if legalisation is not possible we say so straight away. Legalising a building from 3 900 ₾.

from 3 900 ₾legalising a building: measured survey, design, submission and follow-up. The final price is confirmed once agreed.

  • Timeline: legalisation usually takes 2–4 months including the measured survey and design, longer if alterations are needed
  • Warranty: We stand behind the documents we prepare
Get an estimate

Who it’s for

  • A house or storey was built without a permit

  • An extension or terrace was built not to the design

  • You plan to sell, but the floor area in the extract does not match

  • City Hall has issued a fine and set a deadline for correction

  • You bought a house and found part of it is not legalised

What’s included

  • reviewing documents and choosing the route
  • extract and cadastral plan
  • measured survey and as-is design
  • a structural stability report
  • preparing and submitting the application
  • responding to City Hall's comments
  • registering the building in the Public Registry
  • alterations if it cannot be legalised without them

Prices: legalising buildings

from 3 900 ₾

WorkPrice
Legalising a building: measured survey, as-is design, submission and follow-up3 900–6 000 ₾
Structural stability report for a building1 620–2 400 ₾/project
Measured drawings of an existing building6,5–9,5 ₾/m²
Plot measurement (cadastral) drawing for the Public Registry600–840 ₾
Survey of an existing house with a seismic resistance report2 820–4 200 ₾/project

legalising a building: measured survey, design, submission and follow-up. The final price is confirmed once agreed.

Legalising a building in Batumi: when it is needed and how it works

Legalising a building in Batumi is needed when a house, storey, extension or terrace was built without a permit or not as the permit said. Until the building is legalised it is not in the Public Registry, and the registry may suspend a transaction with the plot it stands on. Such a house is hard to sell, mortgage and insure, and City Hall may fine the owner and order demolition of whatever does not fit the rules. Legalisation turns the building into a registered one with a clear floor area.

Two routes

BuildingRouteWhat is needed
Built before 1 January 2007Simplified legalisationMeasured survey, as-is design, photos, plot documents
Built laterThrough a fine and a designFine, design, stability report, compliance with zoning rules

The government has set separate rules for older buildings: City Hall considers the application within 30 days and may require windows, balconies and terraces facing the neighbouring plot to be put in order. For newer buildings the route is longer and more expensive, and it usually begins with a fine.

Which documents we prepare

  • a fresh extract and cadastral plan of the plot;
  • a topographic base and a site location plan;
  • a measured survey and an as-is design;
  • photos of the building from all sides;
  • a structural stability report;
  • the neighbour's consent if the building stands on the boundary.

A stability report is required when City Hall needs to be sure the building is safe. An engineer prepares it after an inspection; more on the building inspection page. If the building stands too close to the neighbour or encroaches on someone else's land, we stake out the boundaries first; more on the boundary staking page.

When legalisation will not work

Not everything can be legalised. A building on someone else's or municipal land, beyond the street's red line, in a pipeline protection zone or with a serious violation in a heritage zone often does not pass. Then we decide what can be kept: sometimes it is enough to rebuild part of it, remove a balcony or change the windows. We say so honestly after the first review, so you do not pay for a submission that is doomed from the start.

Legalisation and an extra storey

If after legalisation you want to add a storey or rebuild the house, it is convenient to do it as one project: the measured survey and inspection for legalisation become the basis of the reconstruction design; more on the reconstruction design page. A layout change in an apartment in an apartment building is legalised differently; see the layout change with legalisation page.

Before a sale

Legalisation is most often remembered when a buyer turns up: their lawyer compares the extract with the house and sees that the floor area does not match. Legalisation at that point holds the deal up for months. If a sale is planned, start with the measured survey in advance; how a sale works is described on the transaction support page.

How much legalisation costs

Legalising a building with a measured survey, as-is design, submission and follow-up costs from 3 900 ₾. A structural stability report from 1 620 ₾, measured drawings of an existing building from 6.5 ₾ per m², a measurement (cadastral) drawing of the plot from 600 ₾. An inspection of an existing house with a report on its earthquake resistance from 2 820 ₾. Fines, state duties and fees are paid separately. The final cost is set after reviewing the documents and inspecting the building.

Stages and timelines

  1. Review

    2–5 days

    Extract, building, legalisation route.

  2. Survey

    1–2 weeks

    Measurements, survey, photos.

  3. Design

    2–4 weeks

    As-is state, stability report.

  4. Decision

    1–3 months

    Submission, comments, City Hall decision.

  5. Registration

    1–2 weeks

    Building in the Public Registry.

Local specifics in Batumi

In Batumi and Adjara's villages there are many houses built without a permit or extended one storey at a time over the years. Often part of a house is legalised and part is not: the 1990s house is in the registry, but the 2010s storey and terrace are not. We deal with such cases part by part and find a route for each.

Buyers and banks in Batumi compare the extract with the house more and more carefully. An unregistered storey lowers the price and puts off buyers with a mortgage, and the Public Registry may suspend registration of a sale until the building is legalised. So legalisation is better done before a sale, not during it.

Materials and brands

A fresh Public Registry extract and cadastral plan, a topographic base, measured drawings and an as-is design, photos of the building. A structural stability report after an inspection. Notarised consents from neighbours if the building is on the boundary. A notarised power of attorney for submission. Copies of the City Hall decision and a new extract with the building registered.

What makes up the cost

Timeline: legalisation usually takes 2–4 months including the measured survey and design, longer if alterations are needed

  • year built, violations and amount of documents

What raises the cost

  • a newer building, legalised through a fine
  • several buildings on the plot
  • boundaries that differ from the registry and neighbours
  • alterations needed to meet the rules

What lowers the cost

  • an older building with no zoning violations
  • a small extension on your own land

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

We stand behind the documents we prepare. If City Hall returns the application because of a mistake in our survey or design, we correct it and resubmit at our own expense. Fines, state duties and fees are paid by the owner, and we tell you about them in advance.

Questions and answers

How much does legalising a building in Batumi cost?

Legalising a building with a measured survey, design and submission costs from 3 900 ₾, a structural stability report from 1 620 ₾, measured drawings from 6.5 ₾ per m². Fines and fees are paid separately. The final cost is set after reviewing the documents and inspecting the building.

Can a house built before 2007 be legalised?

Yes, buildings started before 1 January 2007 have simplified rules. You need plot documents, a topographic base, an as-is design and photos, and in some cases a stability report. City Hall considers the application within 30 days and may require windows and balconies facing the neighbour to be put in order.

What should I do if I get a fine for building without a permit?

Do not miss the deadline stated in the decision. Usually time is given for correction, and within it you need to submit legalisation documents or bring the building into compliance. We do the measured survey straight away and see whether the building can be legalised as it is or something has to be altered.

What cannot be legalised?

Buildings on someone else's or municipal land, beyond the street's red line, in a pipeline protection zone or with serious violations in a heritage zone usually do not pass. Sometimes partial alteration helps: removing a balcony, moving a wall, changing the windows. We decide this after the measured survey, before submission.

Can a house with an unlegalised extension be sold?

Formally you can sell what is in the registry, but the buyer gets a problem along with the house, and the price will reflect it. Banks usually do not give a mortgage on such a house, and the registry may suspend registration of the sale. That is why we advise legalising the extension before putting the house on the market.

Further reading

Send the extract and photos of the building: we will tell you whether and how it can be legalised within 24 hours

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site