A light gauge steel house frame being assembled next to a finished block house

Light gauge steel house in Batumi: a light steel frame by the sea

A light gauge steel house in Batumi is assembled from thin galvanised sections cut at the factory from the structural engineer's files: the walls, floors and rafters arrive numbered and are screwed together within a few weeks. The method suits a one- or two-storey house, a guest cabin, an attic floor or an extension, especially on a slope. By the sea there is one condition: the steel has to stay dry and warm inside the wall. The shell costs from 900 ₾ per m², excluding windows, building services and finishing.

from 900 ₾/m²shell with foundations, frame, insulation, sheathing and roof; windows extra. The final price is confirmed once agreed.

  • Timeline: the shell of a 150 m² LGS house with foundations usually takes 2–3 months, if the design is finished before the sections are ordered
  • Warranty: The frame assembly, roof and insulation carry a 2-year warranty
Get an estimate

Who it’s for

  • A plot on a slope in Makhinjauri that a crane can't reach, but where the sections can be carried in by hand

  • An old stone house needs an attic floor, and its walls could do without a single extra kilogram

  • You need a guest cabin with two or three rooms next to the main house, without wet work in the garden

  • The layout and windows are already approved, and you want the walls up in weeks rather than a whole season

  • You live abroad and want a house that doesn't rot or shrink, with clear maintenance

What’s included

  • structural calculation of the frame and anchors for the seismic, wind and snow loads on the plot
  • a dew point check of the wall and the choice of the external insulation layer
  • ordering the sections with the right zinc coating class from the design files
  • foundations: a slab or piles with ground beams, anchors set with a template
  • screwed assembly of the walls, floors and rafters
  • external sheathing, windproof membrane and roof before the rains start
  • mineral wool, vapour barrier and continuous insulation under the facade
  • grommets on the cables and backing for heavy items before boarding
  • photos of the anchors and details before boarding, for the handover file

Prices: light gauge steel

from 900 ₾/m²

WorkPrice
Light gauge steel house shell900–1 080 ₾/m²
Turnkey light gauge steel house1 800–2 160 ₾/m²
Light gauge steel frame wall with insulation and boarding, with materials (per m² of wall)220–275 ₾/m²
Slab foundation per m² of house footprint390–480 ₾/m²
Turnkey ETICS facade, with materials205–250 ₾/m²
Timber frame house shell750–900 ₾/m²
Steel frame house shell (hot-rolled sections)990–1 200 ₾/m²

shell with foundations, frame, insulation, sheathing and roof; windows extra. The final price is confirmed once agreed.

How a light gauge steel house is built

Light gauge steel (LGS) framing is a frame of cold-formed galvanised steel sections, which in our houses are usually 1 to 2 mm thick: the exact thickness of each member is set by the structural engineer. The wall studs, floor joists and roof trusses are produced on a roll-forming line from the engineer's files. The line also punches holes for screws and cables and marks every part, so on the plot the kit is put together by number, without welding. The sections for plasterboard sold in a DIY store look similar, but they are made for partitions only.

A wall gets its stiffness from boards screwed to the studs at the screw spacing set by the calculation, or from X-bracing made of steel strap. We usually space the studs at 600 mm, and closer under heavy loads, as the structural engineer decides. The floor is built from joists or light trusses, and if it has to carry a screed or large-format tiles, the engineer calculates it separately.

Zinc, cut edges and water: protecting the steel by the sea

A section one or two millimetres thick relies entirely on its factory zinc coating, and if water eats through the zinc, the steel underneath will not last long. How LGS differs from heavy rolled steel in this respect is explained in the comparison of structural steel and light gauge steel. On site this leads to some specific rules:

  • we write the zinc coating class into the section specification: on our builds it is at least 275 g/m², and for a house closer to the shore a thicker zinc or a zinc-magnesium coating;
  • on the plot the sections are cut with snips or a metal saw, never with an angle grinder: the abrasive disc burns the zinc off along the edge, and that is exactly where rust starts;
  • a damp-proof strip goes under the bottom track, the steel never touches concrete or soil, and the plinth is raised above the paving around the house;
  • the screws have a coating at least as good as the one on the sections, and on the facade and roof they are stainless steel;
  • copper pipes and aluminium frames are separated from the steel by isolating pads, so that corrosion does not start inside a damp wall where two different metals meet.

More dangerous than salty air is water that gets into the wall unnoticed for years, at a window, a downpipe or a roof junction. We water-test these details before the inner lining goes on.

Thermal bridges: insulation goes on the outside of the frame too

Steel conducts heat hundreds of times better than timber, so mineral wool between the studs is not enough on its own: the cold passes straight through every stud, from the facade to the plasterboard. In winter condensation forms on the steel, and dark stripes show through on the plasterboard along the lines of the studs, because dust settles where the surface is colder. In summer, with the air conditioning on, humid outdoor air looks for a cold surface inside the wall, and once again it finds the steel.

So part of the insulation goes on as a continuous layer over the outer sheathing, under the facade, and the engineer calculates how much goes outside and how much between the studs: the steel must not get colder than the dew point, either in January or in August with the air conditioning running. How a steel frame differs from a timber one here is explained in the comparison of light gauge steel and timber frame. On site we watch the details: terrace and canopy beams are fixed through thermal break pads, and the steel around the windows is insulated as thoroughly as a solid wall.

Anchors, bracing and level foundations against tremors and wind

Its low weight means an LGS house takes a smaller seismic load, and its weak points lie in the connections. The thin wall of a section cannot hold a bolt the way thick rolled steel does, so the force from the wall to the foundations is transferred by anchor brackets (hold-downs), screwed to the stud as the calculation specifies. Shear walls work through their sheathing or X-bracing straps, and the straps are tensioned during assembly: a slack one only starts working once the frame has already moved. The design method is described on the page about earthquake-resistant construction.

An LGS frame is precise, and it does not forgive an uneven foundation. We bring the top of the slab under the walls to level within a few millimetres; otherwise the track ends up sitting on packers, and the anchor does not work the way the calculation assumes. Anchors are set with a template before the pour, or drilled to the setting-out afterwards, and before the boards go on, the site foreman photographs each one so that the washer, the nut and the bracket on the stud are all visible.

Foundations and facade for an LGS house

The foundation type for LGS is chosen according to the ground and the terrain. Most often it is a slab or piles with ground beams, and in both cases the top under the tracks is brought to level, as described above. A slab for an LGS house costs from 390 to 480 ₾ per m² of footprint.

The facade of such a house is either ventilated cladding or a thin render over insulation: ETICS (insulated render) costs from 205 ₾ per m², while a ventilated facade in fibre cement or rhombus boards costs more but lets moisture out of the wall better. Both options by the sea are compared in ventilated facades and ETICS. Brick or stone facing needs a foundation of its own.

Where LGS fits in Batumi and Adjara, and where it doesn't

LGS works best for a one- or two-storey house of simple shape, a guest cabin next to the main house, and an extension. It is a real help on a plot on a slope that a crane cannot reach: two workers can carry the heaviest part. It also suits an attic floor on top of an old house, if the old walls can take it: it goes up quickly with almost no wet work, and you can go on living downstairs.

LGS is a weaker choice where the floors are heavy: a pool or a garden on the roof, large cantilevers. On a slope, the lower floor cut into the ground is concrete in any case: the steel must not stand in the soil and hold back its pressure. On the beachfront we use LGS only if no stud is exposed to the outside, and open terraces are built from painted rolled steel. For a house of three storeys or more we usually price both LGS and cast-in-place concrete and show you both estimates.

Wiring and concealed work in a steel wall

In an LGS house the cables run through the factory holes in the studs, and every hole gets a plastic grommet: the edge of a thin section is sharp, and in time it cuts through the insulation. An electrician may drill a load-bearing stud for a new cable run only where the structural engineer has allowed it. For the kitchen, the water heater, the TV and the outdoor unit of the air conditioner, we fit a horizontal steel noggin or plywood between the studs before the boards go on, because plasterboard will not hold anything heavy.

Before boarding, the site foreman photographs each wall in full and the details close up: holes filled with screws, the strip under the track, the grommets and the backing for fixings. The photos go into the handover file: later they show where to find a stud for a shelf or where a cable runs, without opening up the wall.

How much a light gauge steel house costs in Batumi

The shell of an LGS house costs from 900 to 1,080 ₾ per m² of floor area. The price includes the foundations, the frame of the walls, floors and roof, insulation, sheathing and the roof covering. Windows, building services and finishing are not included, and the design is priced separately. A turnkey LGS house starts from 1,800 ₾ per m².

A light gauge steel frame wall with insulation and boarding costs from 220 ₾ per m² of wall, which is a useful guide for an extension. For comparison, a timber frame shell starts from 750 ₾ per m², and a shell on a hot-rolled steel frame from 990 ₾. Costs go up with thick zinc and stainless fixings near the water, external insulation, piles on a slope and a ventilated facade, and come down with a simple shape and a gable roof.

We send a preliminary estimate for the shell from a sketch and photos of the plot within 24 hours on business days. The final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed, and in the contract the price is broken down by stage.

Stages and timelines

  1. Design and calculation

    3–6 weeks

    The structural engineer builds an analysis model of the frame with its anchors, and an engineer checks how the wall will handle moisture. The model produces the files for the roll-forming line.

  2. Making the sections

    3–5 weeks

    The sections are rolled, punched and marked from the files. The order is made while the foundations go in.

  3. Foundations

    2–4 weeks

    A slab or piles with ground beams, anchors set with a template. Before assembly we check that the top under the walls is level.

  4. Frame assembly

    2–4 weeks

    The walls go up by part number, followed by the floors and trusses. We check the walls for plumb and the diagonals before the first sheathing board goes on.

  5. Sheathing and roof

    2–3 weeks

    External boards, windproof membrane, roof covering and gutters. The mineral wool goes in only once there is a roof over it.

  6. Insulation and shell acceptance

    2–3 weeks

    Mineral wool between the studs, external insulation under the facade, vapour barrier and the acceptance certificate for the shell. Windows and building services come in the following stages.

Local specifics in Batumi

LGS sections are rolled for a specific design, so you can't pick them up from a builders' yard the way you can timber or blocks. We send the files to the line only once all the openings are approved, and fabrication and delivery are scheduled in parallel with the foundations. A window that someone decides to move once on site has to wait for new studs and a new header from the line.

Delivery, on the other hand, is simple. Bundles of sections are brought by a small truck, and in the narrow streets of old Batumi or on the hairpin road above Gonio this matters more than you might think: steel beams or concrete would need access for a crane and a mixer truck.

A house whose owner comes once a year stands cold in winter, and the humidity inside stays high for months. An empty LGS house needs background heating or a dehumidifier, plus airing, otherwise the damp reaches the boards and the steel. In summer a light house without heavy layers heats up quickly, so on the west walls facing the sea we allow for more insulation and solar shading for the windows.

Materials and brands

We use structural sections of galvanised steel, and the coating class goes into the specification, rather than a single line saying "galvanised". The screws are self-drilling with an anti-corrosion coating, the anchors to the foundations are hot-dip galvanised, and the external fixings are A4 stainless steel.

The external sheathing is OSB-3 or cement-bonded particle board, depending on the wall calculation. Mineral wool goes between the studs, and a continuous layer of insulation boards on the outside, under the facade. On the inside there is a vapour control membrane of the type confirmed by the wall calculation, and Knauf plasterboard, moisture-resistant in the bathrooms. Windows are fixed to the studs and to an opening header made of the same sections, the joint around the frame is sealed with tapes, and the wall membranes are taken onto the frame.

What makes up the cost

Timeline: the shell of a 150 m² LGS house with foundations usually takes 2–3 months, if the design is finished before the sections are ordered

  • floor area and number of storeys: an attic floor adds space without new foundations

What raises the cost

  • a beachfront plot: sections with thick zinc and stainless fixings
  • a continuous external layer of insulation over the frame
  • a slope with no access, where piles with ground beams replace the slab
  • a ventilated facade instead of thin render over insulation

What lowers the cost

  • a compact plan where the upper-floor walls stand over the ground-floor walls
  • repeating details and identical spans: fewer different parts to cut

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

The frame assembly, roof and insulation carry a 2-year warranty. Water pipes, drains and wiring in the walls and floors, if we installed them, are covered by a 5-year warranty. The sections, boards and roofing materials carry the manufacturer's warranty, and the photos of the anchors and details taken before boarding stay in the handover file.

Questions and answers

How much does it cost to build a light gauge steel house in Batumi?

The shell of an LGS house costs from 900 to 1,080 ₾ per m²: the foundations, the steel frame of the walls, floors and roof, insulation, sheathing and the roof covering. Windows, building services, finishing and the design are priced separately. A turnkey LGS house costs from 1,800 ₾ per m².

The estimate depends most on the plot and the access to it, the zinc coating class of the sections, the external insulation and the facade. We send a preliminary estimate from a sketch and photos of the plot within 24 hours on business days, and the final cost is set after a visit to the plot and once the estimate is agreed.

Can you lay tiles and underfloor heating on an LGS floor?

Yes, if the floor is designed for it. Light steel joists deflect underfoot more noticeably than a concrete slab, and tiles need a rigid base: when the floor flexes, the grout cracks and large-format tiles come loose. So for tiles the structural engineer specifies joists that are closer together or deeper, two layers of boards go on top of them, and only then the tile adhesive.

Water underfloor heating on such a floor is a dry system, with the pipes laid in the grooves of heat spreader plates, or a thin screed if its weight is included in the calculation. A tiled bathroom with underfloor heating on the upper floor is discussed at the sketch stage, so that the floor beneath it is designed differently from the start.

Does the steel frame of an LGS house need to be earthed?

Yes, in our electrical design the frame is connected to the earthing system of the house. If a damaged cable touches the steel, the circuit breaker or RCD cuts off the circuit, and no voltage is left on the metal of the walls.

The cables themselves are run so that it never comes to that: in conduit along the studs, through the factory holes with grommets, with the junction boxes left accessible. Before boarding, the electrician tests the insulation of the circuits, and the cable runs are photographed. Wiring that we install in the walls and floors carries a 5-year warranty.

How is an LGS house different from a sandwich panel house?

Both use galvanised steel, but the walls are built differently. In an LGS house the steel is hidden inside the wall: there is insulation between the studs and on the outside, then sheathing, membranes and the facade, with plasterboard on the inside, as in an ordinary frame house. A wall like this is made for living in: it keeps out sound, lets vapour escape, and you can hang cabinets and shelves on it.

A sandwich panel is both the facade and the inner wall: two steel sheets with insulation between them, screwed to a steel frame. You can't hide a cable in such a wall or hang a heavy shelf on the thin sheet, and the building looks industrial inside and out. So we use panels for warehouses, garages and pavilions, and a house for year-round living is built in LGS with a conventional multi-layer wall.

Can you add an LGS room to a stone house?

Yes, it's a common job: a dining room, a ground-floor bedroom or a veranda added to an old house. The extension goes on its own foundation, and a movement joint is left between it and the stone house. The stone house has already finished settling, while the new extension on fresh foundations has yet to settle, and in a tremor each of them sways in its own way. If they are tied rigidly together, a crack will run along the junction.

We close the joint with an elastic seal and a cover strip, and the roof of the extension is taken under the shared gutter so that water does not run into the joint. The floor level is matched to the house during the survey, so that there is no step on the way into the extension.

Further reading

Send a sketch and photos of the plot, and we'll send an estimate for the LGS shell within 24 hours

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site