Timber frame house in Batumi: built on site from kiln-dried timber
We build a timber frame house in Batumi on the plot from planed, kiln-dried timber: studs with mineral wool, sheathing, membranes and a facade on battens with a ventilated air gap. The house is light, so even on a slope it needs only modest foundations, and the shell is closed in against the rain within a few weeks. It suits a guest cabin, a mountain house or a home lived in all year round, provided the wall is built for the local humidity. The shell costs from 750 ₾ per m², excluding building services and finishing.
from 750 ₾/m²shell with foundations, a frame of kiln-dried timber, insulation, roof and windows. The final price is confirmed once agreed.
- Timeline: the shell of a 120–150 m² timber frame house with foundations usually takes 3–4 months, not counting the design and the permit
- Warranty: Frame assembly, the roof and the facade carry a 2-year warranty
Who it’s for
A sloping plot where a heavy house would need expensive piles and retaining walls
The design is ready, and the shell has to be closed in before the autumn rains
A guest cabin or studio next to the main house on the same plot
A house in mountain Adjara, where concrete and blocks are hard to bring in
A lightweight storey on top of a masonry house, once the structural engineer has confirmed its walls and foundations have capacity to spare
What’s included
- Frame layout and wall moisture calculation, done with the structural engineer and our engineers
- Foundations: a slab, piles with ground beams or screw piles, as the calculation requires
- Supply of kiln-dried timber, with a moisture check on every delivery
- Preservative before assembly and a second treatment of ends cut on site
- Assembly of the walls, floors and rafters, anchored to the foundations
- Mineral wool, a breather membrane and a vapour barrier with taped seams
- A roof with gutters, and windows with a properly made installation joint
- Photos of every wall before boarding, for the handover file
A timber frame house in Batumi is built from sawn timber right on the plot. The walls, floors and rafters are put together from studs and joists in a few standard sizes, and the wall gets its stiffness from sheathing boards nailed to the frame at a calculated nail spacing. The Adjara coast tests this method in one place: moisture. Almost everything we do differently from a dry climate is about how the wall gets wet and how it dries out again.
How a timber frame wall is built
We describe the wall layer by layer from the inside out, because here the order of the layers matters more than their thickness:
- an inner lining of plasterboard or tongue-and-groove boards, with battens behind it that leave a service void for cables, so that sockets don't cut through the membrane;
- a vapour barrier membrane with taped overlaps;
- studs of kiln-dried timber, with mineral wool between them and no gaps;
- external sheathing: OSB/3 or a vapour-permeable wind barrier board, depending on the wall calculation;
- a breather membrane that lets vapour out and keeps water out;
- battens for the ventilated air gap, usually 40–50 mm in our houses, and the facade cladding on top.
The floors are built from joists of the same dry timber, only in a larger section. The house goes up one storey at a time: a floor platform, the ground-floor walls on top of it, then the next platform. Each floor also closes off the wall cavity, so fire or a draught can't travel up it from one storey to the next.
A vapour barrier for air conditioning and heating
In a northern climate vapour moves from the warm house outwards, and a dense membrane on the inside stops it. In Batumi that is how it works in winter, but in summer it is the other way round: the air conditioning is on indoors, it is hot and humid outside, and vapour moves from the street into the wall. If the inside has a membrane that lets no vapour through at all, in summer moisture condenses on it on the insulation side and has no way out into the room.
So the engineer checks the wall build-up with a moisture calculation, and we more often use a membrane with variable vapour permeability: in dry air it is almost closed, in humid air it opens slightly. The calculation means little if the membrane is torn. We tape the overlaps, fit sealing collars around pipes and cable entries, and take the membrane onto the window frames. The site foreman photographs every wall before the boarding goes on, and the photos have to show that the tape is pressed down along its whole length.
Timber, drying and preservative
Green timber hardly dries in humid air. Closed up in a wall, it gives its water to the insulation, warps and pulls the plasterboard with it. So for the frame we use only planed, kiln-dried timber, and we check every delivery with a moisture meter when it arrives: timber wetter than 18–20% doesn't go into the wall and goes back to the supplier.
We apply preservative before assembly, on all sides of each piece. Ends cut on site get a second coat, because water gets into wood mainly through the end grain.
Timber, boards, mineral wool and membranes are sold at building markets and shops in Batumi, but planed kiln-dried timber in the right sections is not always in stock in the quantity a whole house needs. So we order it in advance from the timber schedule in the design, leaving time for delivery.
Foundations and plinth
A timber frame house is light, and its foundations are simpler than those of a masonry house. On a level plot we usually pour a cast-in-place slab, which also serves as the base of the floor. On a slope we more often end up with bored piles tied together by ground beams: the house stands level without major excavation, and there is no need for a retaining wall under the whole footprint. How the choice depends on the ground is explained in the comparison of pile and slab foundations, and terracing a plot is described on the page about houses on a slope.
Screw piles suit a small timber frame house set back on the plot, if the calculation confirms them and the shaft is protected from corrosion. For a house on the seafront, where the ground is wet and salty, we don't use them. Either way, the sole plate goes on a damp-proof course on a plinth that we raise at least 30 cm above the ground, and if the house stands on piles, the crawl space is ventilated through vents covered with metal mesh.
Earthquakes and wind: what holds a light house in place
A timber frame is much lighter than a masonry house of the same floor area, and an earthquake puts only a small force on it. Its weak point is elsewhere: the connections. In a tremor, and in a storm wind off the sea, a light house tends to slide on its foundations, and the corners of the walls tend to lift.
So the structural engineer calculates three things: the hold-down anchors at the ends of the walls, the nail spacing in the sheathing, which works as a shear wall, and the connection between the rafters and the walls. A large window takes away the length of wall over which the sheathing works, so a panoramic opening usually gets a steel frame or an extra solid wall next to it. Heavy roof tiles or a concrete screed on a timber floor add mass at the top, and this goes into the calculation too. How a timber frame differs from a steel one by the sea is set out in the comparison of light gauge steel and timber frames.
Fire safety in a timber frame house
Timber burns, and the fire safety of a timber frame house depends on the layers around it. Mineral wool doesn't burn, and on the inside the studs are covered with plasterboard, which holds back fire. Rafters and joists in the loft, where the timber stays exposed, get a fire-retardant treatment. Where the flue of a fireplace or stove passes through a timber floor and the roof, we fit a non-combustible firestop with a clearance to the joists. Cables inside a timber frame wall run in protective conduit, and junction boxes go only where they stay accessible. Setbacks from the neighbours and distances between houses are set by the zone rules, and we check them against the extract for the plot at the sketch stage.
Where a timber frame makes sense and where it doesn't
A timber frame works well on a slope, where every tonne of the house adds to the cost of the foundations, in the mountains, where concrete is hard to bring in, and wherever the shell has to be closed in before the autumn rains. It also suits a guest cabin next to the main house. If you would rather have the walls assembled in a workshop and only installed on the plot, take a look at houses built from factory-made panels.
A timber frame copes less well with long winters with nobody in the house: in a locked, unventilated house the humidity stays high for months, and the sole plate is the first to feel it. A lower ground floor that holds back the soil of a slope needs concrete, and the timber frame can go on top of it. For upkeep and repairs, a timber frame is compared with solid timber walls and with panels on the pages log house vs timber frame house and SIP panels vs timber frame.
How much a timber frame house costs in Batumi
The shell of a timber frame house costs from 750 to 900 ₾ per m² of floor area. This price covers the foundations, a frame of kiln-dried timber, insulation, sheathing, floors, the roof and windows. Building services, finishing and the design are not included. A turnkey timber frame house starts from 1,620 ₾ per m².
An aerated concrete shell costs the same, from 750 ₾ per m², so a timber frame doesn't win on the price of the walls. The savings come on the foundations on a slope and on time: the house is closed in against the rain sooner, and the crew loses less time to bad weather. Two separate lines come up most often: a screw pile with a head plate for a small house costs from 300 ₾ each, and a timber facade of rhombus boards on a subframe adds from 260 ₾ per m² of facade.
Costs go up with a slope that has no vehicle access, panoramic windows and snow in the mountains, and come down with a simple shape and a gable roof on a level plot. We send a preliminary estimate from the plan and photos of the plot within 24 hours on business days, and the final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed.
Stages and timelines
-
Design and calculation
3–6 weeks
The structural engineer calculates the frame for seismic and wind loads, and the engineer checks the wall for moisture. From the design we draw up a schedule of the timber and boards.
-
Foundations and plinth
2–4 weeks
A slab for a level plot, piles with ground beams for a slope, chosen according to the ground survey. The plinth is raised above the ground and topped with a damp-proof course and anchors for the sole plate.
-
Frame and floors
3–5 weeks
The ground-floor walls, the floor platform, the upper storey and the rafters. The site foreman photographs every anchor and joint before boarding.
-
Roof and wind barrier
2–3 weeks
Roof covering, gutters, external sheathing and the breather membrane. From this point the frame is safe from rain.
-
Windows and insulation
2–3 weeks
We fit the windows, put in the mineral wool, tape the vapour barrier and check the seams before the inner lining goes on.
-
Facade and shell handover
2–4 weeks
Battens for the ventilated air gap and the cladding, then the completion certificate for the shell. Building services and finishing follow as later stages of the contract.
Local specifics in Batumi
The wettest months in Batumi are September to January, so our timber frames go up in spring and summer, and by autumn the house should be under its roof with a breather membrane on the walls. Mineral wool goes in only once the roof is closed: wet insulation in a wall isn't dried out, it is replaced.
Even dry timber left on an open site picks up water and goes mouldy within a couple of humid summer weeks. So we bring the timber in batches for each stage, store it on bearers under cover, and don't wrap it tightly in plastic sheeting, under which wood sweats. Before a wall is closed with boarding, we measure the moisture of the studs again.
By the sea, timber copes with salt well enough; it is the metal that suffers: facade nails, brackets, anchors. On the outside and in the plinth we use stainless or hot-dip galvanised fixings. In the mountains of Adjara there is snow on top of that, and the rafters and joists there are sized for the snow load on the plot.
Materials and brands
For the frame we use kiln-dried softwood, planed and calibrated: when all the studs are the same size, the wall comes out flat, and the plasterboard goes on without packing. The external sheathing is OSB/3 or a vapour-permeable wind barrier board, depending on the wall calculation. The insulation is mineral wool; on the inside goes a membrane chosen for the “air conditioning in summer, heating in winter” regime, then Knauf plasterboard, moisture-resistant in wet rooms.
Windows are uPVC on REHAU or VEKA profiles, and large openings are made with Asistal aluminium systems. The facade is ventilated: rhombus boards, beam-effect boards or fibre cement panels on battens with a ventilated air gap.
What makes up the cost
Timeline: the shell of a 120–150 m² timber frame house with foundations usually takes 3–4 months, not counting the design and the permit
- number of storeys: a single-storey house needs more foundations and roof for each square metre of floor area
What raises the cost
- a slope with no vehicle access, where the timber and boards are carried up to the house by hand
- panoramic windows, next to which the frame needs steel frames
- a timber facade, whose finish will need renewing
- snow load in the mountains: larger rafters and joists
What lowers the cost
- a simple house shape and a gable roof without complicated junctions
- a level plot with vehicle access, where a slab is enough for the house
We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.
Get an estimateGuarantees
Frame assembly, the roof and the facade carry a 2-year warranty. If we laid the water pipes, drains and wiring in the walls and floors, they have a 5-year warranty. The timber, boards, membranes and windows carry the manufacturer's warranty. Photos of every wall before boarding stay in the handover file.
Questions and answers
How much does it cost to build a timber frame house in Batumi?
A timber frame shell costs from 750 ₾ per m²: foundations, a frame of kiln-dried timber, insulation, sheathing, floors, roof and windows. Building services and finishing are not included in this price, and the design is priced separately. A turnkey house costs from 1,620 ₾ per m².
What moves the estimate most is the terrain and access, the size of the windows, the facade and the level of finish. We send a preliminary estimate from the plan and photos of the plot within 24 hours on business days. The final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed, and under the contract the price of each stage doesn't rise unless the scope changes.
How long will a timber frame house last by the sea?
The life of a timber frame house depends above all on whether the timber stays dry. A frame of kiln-dried timber behind an intact breather membrane and vapour barrier doesn't rot: fungi need damp wood. But in a house where an external window sill has been leaking for years or the plinth gets soaked by splashes, the sole plate and the bottom of the studs have to be replaced long before the house is old.
So we don't put a number on its lifespan. Instead, we put a maintenance plan in the handover file: what to inspect in spring, when to renew the finish on a timber facade, how to run the ventilation in an empty house. The photos of the walls before boarding are kept there too, and during repairs they show straight away where the stud you need is.
Can a timber frame house have a rendered facade?
It can, but not directly on OSB. The render goes on insulation or on a board designed for it, with reinforcing mesh, and all the layers of the system have to be compatible with one another. If water does get behind the render through a crack or at the junction with a window, it will take a long time to dry out of a timber frame wall.
So by the sea we more often recommend a ventilated facade with an air gap: fibre cement panels or boards on battens. If you like the look of a smooth painted wall, paintable fibre cement boards on the same subframe will give you that.
Does a timber frame house get hot in summer in Batumi?
A timber frame house heats up faster than a masonry one: a light wall has little mass, so it has nothing to even out the daytime heat with. But it also cools down quickly. The air conditioning doesn't have to cool thick walls first, and the room reaches the right temperature noticeably sooner than in a block-built house.
In summer most of the heat comes in through the roof and the west-facing windows, not through the walls. So we put thicker insulation in the roof than in the walls, leave a ventilated gap under the roof covering and behind the facade, and shade the west windows with an overhang or external blinds.
Why can you hear footsteps from upstairs in a timber frame house?
A timber floor is light and springy, and the impact of a heel travels along the joists down into the ground-floor ceiling. Mineral wool between the joists damps voices and music, but does almost nothing against footsteps if the floor sits directly on the joists.
Footsteps are damped by a floating floor: a resilient underlay goes on the subfloor, dry screed boards go on top, and the floor does not touch the walls. The ceiling below is hung on anti-vibration hangers. We put all of this into the floor design, because in a finished house this kind of rework means taking the floors up.
Further reading
Send us the plan and photos of the plot, and we'll price a timber frame shell within 24 hours
We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.
Mon–Fri 10:00–19:00, Sat 11:00–16:00