Steel frame house in Batumi: a frame of hot-rolled structural steel

A steel frame house in Batumi is held up by a frame of hot-rolled columns and beams, and the floors, walls and facade bear on it. Steel is chosen for long spans, a glass wall facing the sea, a light extra storey on an old house or a quick shell for a commercial building. The steel is made at a factory to our drawings while the foundations go in on the plot, and by the sea it is protected by a specified paint system or hot-dip galvanising. The shell costs from 990 ₾ per m².

from 990 ₾/m²shell: foundations, steel frame with protection, floors, walls and roof. The final price is confirmed once agreed.

  • Timeline: the shell of a 200 m² steel frame house usually takes 4–6 months, including the factory drawings but not the design and permit
  • Warranty: Frame erection and the work on the shell carry a 2-year warranty
Get an estimate

Who it’s for

  • A villa with a column-free living room and a glass wall facing the sea, where a concrete beam would be too deep

  • An extra storey on an old house that has to stand on its own columns rather than on the existing walls

  • A showroom, shop or gym with an open hall that has to be weathertight before the season

  • A terrace, a carport canopy or an external steel staircase next to a stone house

  • A plot on a slope that a concrete mixer truck can't climb to, but a crane truck carrying beams can reach

What’s included

  • calculation of the frame, joints and bracing for seismic, wind and snow loads
  • shop drawings for the factory and a steel specification
  • fabrication of the columns and beams with blast cleaning and primer
  • an anti-corrosion system or hot-dip galvanising to suit the plot's corrosivity category
  • column foundations with anchors set by template, and grouting
  • bolted erection of the frame with tightening checks
  • floors on profiled steel decking, wall infill and the roof
  • fire protection of columns and beams as the design requires
  • photos of the joints and coating thickness readings in the handover file

Prices: steel frame

from 990 ₾/m²

WorkPrice
Steel frame house shell (hot-rolled sections)990–1 200 ₾/m²
Turnkey steel frame house1 920–2 280 ₾/m²
Building steel frame (columns, beams, bracing): fabrication, priming, erection, per m² of floor area380–540 ₾/m²
Anti-corrosion painting of steelwork for coastal conditions (zinc-rich primer, enamel), per m² of steel surface45–60 ₾/m²
Cast-in-place floor slab, 200 mm305–350 ₾/m²
Turnkey ventilated facade with materials (porcelain tiles, composite panels)420–540 ₾/m²
Light gauge steel house shell900–1 080 ₾/m²
Cast-in-place concrete house shell1 110–1 320 ₾/m²

shell: foundations, steel frame with protection, floors, walls and roof. The final price is confirmed once agreed.

What a steel house frame is made of

The steel frame of a house is assembled from hot-rolled sections: columns of I-beams or square hollow sections, floor beams of I-beams, and bracing and purlins of angles, channels and smaller hollow sections. The parts are cut, drilled and welded at the factory, and on the plot they are bolted together. We keep site welding for the occasional joint: a weld made in the field is harder to inspect, and every time the protection around it has to be restored.

On steel beams we usually make cast-in-place concrete floors on profiled steel decking. The decking serves as permanent formwork, the reinforcement and concrete go on top of it, and the slab carries the screed, tiles and partitions. The walls are filled in with aerated concrete on flexible ties with a gap at the columns, with a light frame or with glass, and in commercial buildings with sandwich panels. This frame should not be confused with thin galvanised sections: the difference is described in the comparison of structural steel and light gauge steel.

Drawings for the factory: the steel design is finished before the metal is ordered

From the structural engineer's calculations, detailed fabrication drawings (shop drawings) are produced: a separate sheet for each column and beam, with its length, holes, stiffeners and plates. The steel is cut and drilled to these drawings, and after that a part can no longer be adjusted on site. A hole that is a couple of centimetres out means a new plate, welding on site and protecting the joint all over again.

So before the steel is ordered, we bring together on one drawing everything that is fixed to the frame: the window openings, the staircase, ventilation shafts, drains passing through beams, and the fixing plates for the facade and the pergola. The vertical bracing between columns also ends up on the facade, so the architect can see straight away where a window won't fit. Anchor bolts are cast into the foundations using a steel template, and once the columns are aligned, non-shrink grout is poured under their base plates.

Corrosion protection by the sea: a paint system, coat by coat

On the coast, protection for steel is chosen according to the corrosivity category of the plot, and the closer to the water, the higher the category. What these categories are, and why hot-dip galvanising or a multi-coat paint system is used right by the shore, is explained in the comparison of concrete and steel frames. In practice our protection works like this:

  • at the factory the steel is blast-cleaned down to bare metal, because primer does not hold on rust and mill scale;
  • straight after blasting, a zinc-rich primer is applied, followed by the intermediate and top coats of the same system from the same manufacturer;
  • the thickness of each coat is written into the estimate and checked with a coating thickness gauge before dispatch, and the readings go into the handover file;
  • exposed members, such as terrace beams and canopy posts, are hot-dip galvanised and then painted, and closed hollow sections are given holes so that the zinc gets inside too;
  • after erection we touch up the bolts, washers and every scratch left by the lifting slings.

A frame inside the warm, dry envelope needs only a basic system. For exposed steel we put an inspection schedule and the name of the paint system into the handover file: chips are later touched up with the same product, because a different paint may not bond to the old coats.

Fire protection for steel columns and beams

Steel doesn't burn, but in a fire it heats up quickly and loses strength, and an unprotected beam can sag before the fire brigade arrives. How many minutes the frame has to carry its load in a fire depends on what the building is used for and on its class. This requirement is set in the design by the structural engineer and the architect under the fire regulations.

There are three ways to protect the steel. Intumescent paint swells into a thick layer of foam when heated, and it suits beams that stay exposed. Fire boards or several layers of plasterboard enclose columns inside walls and beams above a suspended ceiling, and this is usually cheaper than paint. Concrete around a column gives the most reliable protection, but it adds weight. We apply intumescent paint only over a primer approved by its manufacturer, otherwise the coats come away together.

Thermal bridges and condensation on steel beams

A steel beam that runs from a warm living room out under a terrace or canopy conducts the cold into the house. In winter condensation forms on it, the ceiling around it darkens, and the steel rusts under the finishes, where nobody can see it. We build these joints with a thermal break: the external cantilever is fixed to the internal beam through a structural thermal break element or pads, as the calculation requires.

Columns in the plane of an external wall are covered on the outside with the same insulation as the wall, without a gap. Rooms with humid air get special attention: in a bathroom, a laundry room or by a pool, a steel beam under the ceiling is wrapped in insulation and a vapour barrier, otherwise it becomes the coldest surface in the room.

Foundations, erection and seismic design

A steel house is lighter than a concrete one, but its load is concentrated in the columns, and each of them needs its own foundation, or the house needs a common slab. The type is chosen by the structural engineer according to the ground on the plot. Erection needs a crane or a crane truck with space to stand, and we look for that space at the sketch stage. On a narrow street or a slope, long beams are split into pieces with bolted splices.

Steel is ductile: in a strong tremor the beams and bracing can deform noticeably and still hold up the floors. You can rely on this only if the joints are made as calculated. So we inspect the welds on factory parts before painting, tighten the bolts with a torque wrench to the value given in the design, and photograph the joints that carry seismic loads before the ceiling and linings cover them.

Where a steel frame pays off

Steel comes out ahead when a concrete beam runs up against limits of depth or weight. That means a villa with a column-free living room and a glass wall facing the sea, an extra storey on an old house that cannot take any more weight, a terrace or canopy on slender supports, or an external staircase. For an extra storey, we first survey the old house and decide whether the steel storey will sit on its walls or on its own columns with separate foundations. In commercial construction, a steel frame is almost always the first option for a warehouse, workshop, showroom or gym.

For an ordinary two-storey house with rooms 4–5 m across, we more often recommend a cast-in-place concrete frame. Steel with corrosion protection and fire protection costs more, and the time saved is eaten up by the drawings and the factory fabrication.

How much a steel frame house costs in Batumi

The shell of a steel frame house costs from 990 to 1,200 ₾ per m² of floor area. The price includes the foundations, rolled steel columns and beams with corrosion protection, the floors, wall infill and the roof. Windows, building services and finishing are priced separately, and so is the design. A turnkey steel frame house starts from 1,920 ₾ per m².

The frame itself, meaning the columns, beams and bracing with fabrication, priming and erection, costs from 380 to 540 ₾ per m² of the house's floor area. Heavy-duty coastal painting adds from 45 to 60 ₾ per m² of steel surface, and a cast-in-place floor slab from 305 ₾ per m². For comparison, a light gauge steel shell starts from 900 ₾ per m², and a cast-in-place concrete shell from 1,110 ₾.

The price goes up with long spans and cantilevers, hot-dip galvanising of exposed members, fire protection of exposed beams and crane work in a tight spot. It comes down with a repeating column grid and a frame hidden entirely inside the warm envelope. We send a preliminary estimate from a sketch within 24 hours on business days, and the final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed.

Stages and timelines

  1. Calculations and drawings

    4–8 weeks

    The structural engineer designs the frame and its joints, then we prepare shop drawings for the factory. All changes are made before the steel is ordered.

  2. Factory fabrication

    4–6 weeks

    Cutting, drilling and welding of the parts, blast cleaning and painting to the specified system. We check the coating thickness before dispatch.

  3. Foundations

    2–4 weeks

    While the factory is at work, we pour the foundations with anchor bolts set by template and check their positions.

  4. Frame erection

    2–4 weeks

    Columns, beams and bracing on bolts, grouting under the base plates, touch-up painting at the connections.

  5. Floors and roof

    3–6 weeks

    Profiled steel decking, reinforcement and concrete for the floors, and the roof with gutters. After this the shell is closed from above.

  6. Walls, fire protection and acceptance

    3–5 weeks

    Wall infill, fire protection of the columns and beams, and the acceptance certificate for the shell. Windows, building services and finishing come in the following stages.

Local specifics in Batumi

Humidity in Batumi is high for most of the year, and paint can only go on dry steel that is warmer than the dew point. So the painting is done in the workshop, and on site only the bolts and scratches are touched up. We do that in dry hours, not in the morning dew or just before a downpour.

Long beams are delivered on a low-loader, and the narrow streets of old Batumi, Gonio or the hairpin road above Makhinjauri don't always let it through. We agree the length of the shipping pieces with the factory in advance and check where the crane will stand.

The west facade gets both the spray in a storm and the evening sun, which over a summer heats up dark paint on exposed steel considerably. So the external beams and supports on that side are painted in light colours, and the top coat is a UV-resistant one: cheap enamel fades within a couple of seasons and starts to chalk, and the protection beneath it gets thinner.

Materials and brands

Columns, beams and bracing are made from hot-rolled I-beams, channels and hollow sections in the structural steel grade specified by the engineer. The bolts are hot-dip galvanised, in the strength class given in the design. We buy the whole paint system from one manufacturer: zinc-rich primer, intermediate and top coats, with technical data sheets stating the thickness of each coat for the required corrosivity category.

The profiled steel decking for the floors is galvanised. Intumescent paint or fire boards are chosen for the required fire resistance rating and for compatibility with the primer. Glass walls on a steel frame are built with Asistal mullion and transom systems with a thermally broken profile, and the external facade fixings are A4 stainless steel.

What makes up the cost

Timeline: the shell of a 200 m² steel frame house usually takes 4–6 months, including the factory drawings but not the design and permit

  • the wall infill material and the type of facade

What raises the cost

  • long spans and cantilevers: heavier beams, more complex joints
  • a plot by the water: hot-dip galvanising or a multi-coat paint system
  • fire protection of exposed beams with intumescent paint
  • crane erection on a narrow street or a slope

What lowers the cost

  • a repeating column grid and identical joints
  • a frame inside the warm envelope, where a basic paint system is enough

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

Frame erection and the work on the shell carry a 2-year warranty. Water pipes, drains and wiring in the walls and floors, if we installed them, are covered by a 5-year warranty. The rolled steel, paints and fire protection products carry the manufacturer's warranty, and the coating thickness readings and photos of the joints stay in the handover file.

Questions and answers

How much does it cost to build a steel frame house in Batumi?

The shell of a steel frame house costs from 990 to 1,200 ₾ per m²: the foundations, the steel frame with corrosion protection, the floors, wall infill and the roof. A turnkey house costs from 1,920 ₾ per m². Windows, building services, finishing and the design are not included in the price of the shell.

The estimate is driven most by the spans, the amount of steel on the outside of the house and the fire protection requirements. We send a preliminary estimate from a sketch within 24 hours on business days, and the final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed.

Can steel beams be left exposed in the interior?

Yes, it's a common approach in a house with a high living room. Such a beam is ordered as an exposed architectural member from the start: the welds are ground smooth at the factory, the bolts and plates are shown on the drawings, and the colour of the top coat is chosen with the designer. If the house needs fire protection, an exposed beam gets intumescent paint, with a compatible decorative coat on top.

An exposed beam has to stay inside the warm envelope. One that passes through an external wall to a terrace is never left exposed without a thermal break: in winter there will be water on it.

Can you build a two-storey house from box section steel?

Columns and beams of square and rectangular hollow sections are used in two-storey houses too, but the section size and wall thickness are set by the calculation, not by a table from the market. The thin-walled tube people buy for fences and canopies usually won't pass the calculation for a concrete floor and seismic loads.

By the sea, hollow sections have a weak spot: condensation collects inside, and rust works from within, where you can't see it. So we seal the ends of the tubes with plates, and if a tube is galvanised, the vent holes are closed with plugs afterwards. The joints between tubes and beams are designed by the structural engineer, not copied from photos on the internet.

Does a steel frame house creak when the temperature changes?

A frame with concrete floors inside a warm house is quiet: the temperature there is almost constant. Sounds appear where the steel stands in the sun. A long canopy beam or a roof purlin lengthens during the day and shrinks back in the evening, and in a poorly assembled joint you hear this as a click.

So long external members sit on sliding bearings with slotted bolt holes, and the roof is fixed according to its manufacturer's scheme. A light floor without concrete can feel springy underfoot, and in a home we don't offer one without a floating floor.

Where are the steel structures for a house made?

We don't have our own factory. The columns and beams are made by a steel fabrication plant to our drawings, and we choose the plant to suit the job: whether it has a blast cleaning and paint booth, whether it works with hot-dip galvanising, how long a part it can ship. The plant buys the steel, bolts and paint to the specification in the design.

Before dispatch we visit the factory or receive photos and measurements from it: part dimensions, welds, coating thickness. Parts with defects are put right before they are shipped, because on site this costs more and takes longer.

Further reading

Send a sketch with the spans: we'll suggest a frame layout and price the steel

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site