Urgent apartment renovation in Batumi to a move-in or sale date

We do urgent apartment renovation in Batumi to a specific date: a tenant moving in, the start of the season, a viewing with a buyer. We shorten the timing with parallel crews, a second shift on the quiet work and materials from stock. We don't rush the drying of screed and plaster, and where possible we get round it with other solutions. An urgent cosmetic renovation costs from 305 ₾ per m², including labour and basic materials.

from 305 ₾/m²cosmetic renovation on a compressed timeline, labour and basic materials. The final price is confirmed once agreed.

  • Timeline: in our practice, a 1+1 of about 45 m² takes 2–2.5 weeks in urgent mode instead of 3–4, and a studio 8–12 days; exact timing after the site measurement
  • Warranty: A 2-year warranty on the work
Get an estimate

Who it’s for

  • Your tenant moves out at the end of the month, and the new one moves in two weeks later

  • A short-term rental apartment has to be ready for the first bookings of the season

  • A buyer is coming to a viewing in a week, and the walls are covered in marks and chips

  • You are flying to Batumi for two weeks and want to leave with the apartment finished

  • The previous crew missed the deadline, and the work needs finishing quickly and under a contract

What’s included

  • a site measurement and an answer on what we can and can't finish by your date
  • a day-by-day schedule, with the apartment split into sections for several crews
  • materials from warehouses in Batumi, chosen to suit the timing and drying times
  • a second shift on quiet work, in the hours the building's rules allow
  • spray painting, stretch ceilings, click-lock flooring
  • measuring base moisture before skim coat, paint and flooring, dehumidifiers in the wet season
  • a photo and video report once a week, and a video call from the site on request
  • post-renovation cleaning before move-in or the photo shoot

Prices: urgent renovation

from 305 ₾/m²

WorkPrice
Urgent cosmetic renovation (tight deadlines, second shift)305–450 ₾/m²
Urgent handyman call-out at night or at the weekend145–180 ₾/visit
Spray painting24–30 ₾/m²
Stretch ceiling (film + installation)78–120 ₾/m²
Laying laminate20–30 ₾/m²
Post-renovation cleaning, per m² of floor12–18 ₾/m²

cosmetic renovation on a compressed timeline, labour and basic materials. The final price is confirmed once agreed.

What can be sped up in a renovation and what can't

We plan an urgent apartment renovation in Batumi back from a date: a tenant moving in, the first booking of the season, a viewing with a buyer. We shorten the timing wherever the work can be split between people and shifts. Where everything depends on a material drying, extra hands won't help, and then we change the solution itself.

WorkCan it be sped upHow
Painting walls and ceilingsYesA paint sprayer, a second shift, paint with a short interval between coats
Skim coatPartlyThin coats, a dehumidifier and heating, but each coat still takes its own time to dry
CeilingYesA stretch ceiling instead of skim coat and paint; the film is made to measure, so we measure the ceilings in the first few days
Click-lock flooringYesLaminate or SPC vinyl on a dry, level screed: the packs acclimatise in the apartment for as long as the instructions say, then each room takes a day
New cement screedNoWe dry it only to moisture meter readings, so we either move the date or do without a new screed
PlasterHardlyPlasterboard where it is appropriate
Made-to-measure furnitureNoReady-made furniture from stock, with made-to-measure cabinets later

In urgent mode we replace pipes and wiring only in short sections. Replacing all the services, with a pressure test, plaster and a new screed, is a full renovation, and we don't take on squeezing that into a couple of weeks.

Parallel crews and a second shift

In an ordinary renovation one crew works through the apartment stage by stage. In an urgent one the foreman splits the apartment into sections, and the work runs at the same time: the electrician in the bedroom, the tiler in the bathroom, the painter in the living room. The stages don't wait for each other, but every day there has to be a plan of who works where, so that the tradesmen don't get in each other's way or raise dust over fresh paint.

The second shift takes the quiet work: skim coating, painting, furniture assembly, fitting light fittings. The hammer drill and the wall chaser stay on the day shift: by law noisy work is allowed from 08:00 to 23:00, and if the building's rules are stricter, we follow them.

We buy materials from stock at warehouses in Batumi rather than ordering them in. If the tiles or laminate you picked aren't available, we offer two or three options that can be collected the same day. The timing also depends on your answers: when the wall colour or the mixer tap model is approved within a day, the crew doesn't stand idle.

Drying that can't be rushed

For the first week a cement screed is kept damp so that it gains strength, and only then is it dried until the moisture meter shows the right reading. How we cure and sign off the base is described on the page about floor screed. Plaster and skim coat give up water faster, but they don't follow the calendar either. Rush them with hot air from close up and only the surface dries: a month later a network of cracks runs across the wall, and laminate on an under-dried screed swells at the joints.

So in an urgent renovation we avoid wet processes wherever we can. We cover a crooked wall with plasterboard instead of thick plaster and the ceiling with a stretch ceiling that goes up in a day, and we lay click-lock flooring over a sound old screed. Where a wet stage can't be avoided, we put in a dehumidifier with heating and tell you straight away how far the date moves.

Timing for typical apartments

The usual timings here are the same as on the page about cosmetic apartment renovation. The urgent ones come from our own practice, for an empty apartment with working services and a sound screed. They are a guide, not a promise: we give the exact timing after the site measurement and write it into the schedule in the contract.

ApartmentUsual timingUrgent, in our practiceHow
Studio, about 30 m²2–3 weeks8–12 daysBathroom and room in parallel, a stretch ceiling instead of skim coating the ceiling
1+1, about 45 m²3–4 weeks2–2.5 weeksTwo crews: bathroom and rooms at the same time, painting on the second shift
2+1, about 70 m²4–6 weeks3–4 weeksThe apartment is split into two sections, each with its own painter

If people live in the apartment or there is furniture in it, the timing is longer: the crews have no room to work around each other. A bathroom with new tiles adds days for waterproofing and grouting even with rapid-setting adhesive, so we start it first.

When it isn't worth compressing the timing

Urgency makes sense when the date has a price: the apartment standing empty between tenants, cancelled bookings, a buyer who won't wait. If there is no such date, the same renovation at a normal pace will cost less.

It isn't worth hurrying either when the apartment needs new pipes, wiring or screed. Fresh finishes over old services last until the first leak, and then they get opened up together with the new tiles. We say so before the estimate and suggest moving the launch date rather than covering the problem with paint.

After painting, an apartment for short-term rental gets a day or two of airing and a clean, and only then do we take the photos for the listing. Which materials stand up to a steady stream of guests is covered on the page about renovating apartments for short-term rental.

Emergency call-outs when something breaks

Urgent repairs can also mean something else: something has broken right now. A supply hose is leaking, a circuit breaker has tripped and won't switch back on, a lock has jammed, the sink won't drain. This doesn't need a crew, just one tradesman, and you can call one out at night or at the weekend too. On a call-out like this, the tradesman first stops the damage: shuts off the water, isolates the circuit, fits a blanking cap. If the right part is to hand, the repair is done on the spot; if not, it moves to a working day.

If water has already got into the ceiling, the walls or under the floor, one tradesman isn't enough. The apartment first has to be dried out and opened up, and the order of this work is described on the page about water damage repair.

How much urgent apartment renovation in Batumi costs

An urgent cosmetic renovation costs from 305 to 450 ₾ per m² of apartment floor area. The price includes labour and basic materials: skim coat, primer, paint and adhesive. The scope is the same as an ordinary cosmetic renovation, plus a 30–50% surcharge for the compressed timing. The surcharge pays for the second shift and the extra tradesmen, while dehumidifiers and heating in the wet season are a separate line in the estimate.

In the price table, individual jobs are priced by their own area. Spray painting costs 24–30 ₾ per m² of wall, and a stretch ceiling with film and installation 78–120 ₾ per m². An urgent call-out at night or at the weekend costs 145–180 ₾.

An empty apartment where painting and click-lock flooring are enough, and where you approve the materials quickly, is closer to the lower end. The price goes up with weekend work, tiling in the bathroom and the wet season, when coats won't dry without dehumidifiers. The final cost is set after the site measurement and agreement of the estimate, and the price and timing of each stage are written into the contract.

Stages and timelines

  1. Site measurement and date check

    1 day

    The foreman looks at the walls, the floor, the services and the building's rules, and tells you what we can finish by your date and what will have to be simplified or postponed.

  2. Estimate and day-by-day schedule

    1–2 days

    We plan the work by day and by section of the apartment, and the contract fixes the price and timing of each stage.

  3. Materials and strip-out

    2–3 days

    While some of the tradesmen remove the old finishes, we buy materials from stock so that the crew doesn't wait for a delivery.

  4. Walls and services by section

    4–7 days

    The electrician, the tiler and the painters work at the same time in different rooms. Before skim coating and painting, we check the walls with a moisture meter.

  5. Finishing in two shifts

    4–7 days

    Noisy work and floors by day, painting and assembly in the evening. Ceilings and doors go in once the walls are finished.

  6. Cleaning and handover

    1 day

    We clean up the dust and air the apartment after painting. You accept the apartment on site or by video.

Local specifics in Batumi

In spring, before the season, lots of owners need an urgent renovation at once, and in those same weeks the crews, service lifts and warehouses are busy. If the apartment has to start earning in summer, it is best to have the site measurement in February or March: the materials will have time to arrive, and you may not need urgent mode at all.

In winter a compressed schedule runs into damp. In a cold apartment with the windows shut, skim coat and paint take noticeably longer to dry, so from November to March an urgent renovation almost always runs with dehumidifiers and heating, and these are separate lines in the estimate.

In large residential complexes the management company limits evening and weekend work: in some buildings there is no noise after a certain hour, in others the service lift is closed on Sundays. We ask for the building's rules before drawing up the schedule and fit the evening hours and waste removal around them. In an urgent renovation we take the waste away more often, because buildings usually don't allow bags to be left in the corridor.

Materials and brands

In an urgent renovation we choose materials by two things: whether they are in stock in Batumi today, and how long the technical data sheet says they take to dry. Where there is no water, we use gypsum skim coat, for example Knauf, because it dries faster than cement-based skim coat. The paint is water-based, Caparol or Chromodomi, with a short interval between coats and little smell left by move-in day.

In the bathroom we lay tiles on rapid-setting adhesive, for example Mapei: it can be grouted sooner than usual, and we take the timing from the data sheet. The floors get Kastamonu laminate from stock or SPC vinyl. We level walls with Knauf plasterboard, moisture-resistant in the bathroom. Dehumidifiers are set up with a hose into the drain, so that the tank doesn't overflow at night.

What makes up the cost

Timeline: in our practice, a 1+1 of about 45 m² takes 2–2.5 weeks in urgent mode instead of 3–4, and a studio 8–12 days; exact timing after the site measurement

  • a date that can move by a few days changes the number of crews

What raises the cost

  • a second shift and extra crews on site
  • weekend and evening work, if the building's rules allow it
  • drying with dehumidifiers and heating in the wet season
  • express delivery of materials that aren't in stock in Batumi

What lowers the cost

  • solutions without wet processes: a stretch ceiling, click-lock flooring
  • quick answers from the owner on materials and colours
  • an empty apartment with no furniture or occupants

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

A 2-year warranty on the work, the same as with normal timing.

A compressed schedule doesn't change the method: we take the time between coats from the technical data sheet and check the base with a moisture meter before finishing, so the warranty terms are the same. If new cable, water pipes or drains in the walls and floor are part of the urgent renovation, they carry a 5-year warranty.

Questions and answers

How much does urgent apartment renovation in Batumi cost per m²?

An urgent cosmetic renovation costs from 305 to 450 ₾ per square metre of apartment floor area. The price includes labour and basic materials, and the compressed timing adds 30–50% to the price of an ordinary cosmetic renovation. Flooring, doors, light fittings and sanitary ware are separate lines, according to your choice.

An empty apartment where painting and click-lock flooring are enough is closer to the lower end. Bathroom tiling, weekend work and drying in winter cost more. The final cost is set after the site measurement and agreement of the estimate, and we fix the price of each stage in the contract.

Can an apartment be renovated in a week?

A studio can, if it is empty, the services work, the screed is sound and the walls don't need levelling from scratch. In a week we can paint the walls where the skim coat is already done, fit stretch ceilings, lay click-lock flooring and replace the doors in the existing openings. In that case the doors and flooring come from stock.

We can't finish anything that depends on drying: a new screed, plaster, several coats of skim on crooked walls, a bathroom with new tiles. If you need even one of these, the realistic timing is longer than a week, and we'll tell you by how much at the site measurement.

Why does urgent renovation cost more than ordinary renovation?

For the same scope, more people work at the same time in an urgent renovation, some of them on the second shift. The foreman has to plan every day who works where, so that the tradesmen don't get in each other's way. In the wet season dehumidifiers and heating are added, because without them the coats won't dry in time.

We buy materials from stock instead of waiting for a cheaper delivery to order, and that narrows the choice. The surcharge for compressed timing is 30–50% on top of an ordinary cosmetic renovation. If the date can move by even a week, we'll price both options so that you can compare.

What happens if the renovation isn't finished on time?

The timing of each stage is written into the contract, and we draw up the schedule day by day. If the timing is at risk, for example a delivery is late or a wall is taking longer to dry, the manager warns you in advance, not on the last day, and offers options: a different material from stock, moving part of the work to after move-in, an extra shift.

What happens if we miss a deadline through our own fault is set out in the terms of the contract. Deadlines that depend on you, such as choosing the tiles, are in the schedule too, so it is clear exactly where a delay came from.

Can I call out a tradesman at night or at the weekend?

Yes. An urgent call-out at night or at the weekend costs 145–180 ₾, and parts are paid for separately against receipts. We give you the arrival time when you call or message us on WhatsApp: it depends on the district and on where the tradesman is at that moment, so we don't promise it in advance.

While the tradesman is on the way, close the valve on the water inlet or switch off the circuit breaker for the problem circuit, if you can reach the consumer unit over a dry floor. If you aren't in Batumi, a friend or the building's reception can let the tradesman in, and if the apartment is under our management, we already have the key. After the visit we send photos, and if the repair needs more than one visit, an estimate.

Further reading

Tell us the date and send photos, and we'll say what we can finish in time

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site