Outbuildings on your plot in Batumi
Outbuildings on your plot in Batumi: a storeroom or shed, a workshop, a borehole pump room with a water heater and filters, a log store. We build them in block in the same style as the house or on a clad frame, or install an insulated prefabricated cabin. A turnkey 3×4 m block outbuilding costs from 18,600 ₾. Lighting and sockets run on a dedicated circuit from the house consumer unit, and in a pump room we put in a floor drain and heating for the winter.
from 18 600 ₾/propertyturnkey 3×4 m block outbuilding: foundations, floor, roof, door, window, lighting. The final price is confirmed once agreed.
- Timeline: a 3×4 m block outbuilding usually takes 4–6 weeks, a framed one 2–3 weeks, and a prefabricated cabin goes onto finished foundations in a day
- Warranty: Outbuilding work has a 2-year warranty
Who it’s for
Garden tools, bikes and tyres are kept in the house or on the terrace, and they need a place of their own
You have a borehole, but the pump and filters sit in the basement of the house or in a box outside
You want a workshop with a workbench, lighting and sockets, so that the noise and dust stay out of the house
You need a log store for a bathhouse, fireplace or barbecue where the wood won't get damp over the winter
You let the house to guests, and tools, spare linen and cleaning chemicals have to be kept under lock and key
What’s included
- a site visit, choice of location and the cable route from the house
- a sketch for the job: storeroom, workshop, pump room or log store
- foundations and a floor above ground level with waterproofing
- block walls or a clad frame
- a roof with overhangs and gutters
- a door without a high threshold, and a window
- lighting, sockets and a small consumer unit with an RCD
- ventilation: an inlet low down, an extract under the roof
- a floor drain and pump room pipework as per contract
- an exterior finish to match the house
We build outbuildings on plots in Batumi for a specific job: a store for garden tools, a workshop, a pump room for the borehole with a water heater and filters, a log store, or a shed for everything that shouldn't be kept in the house. The job decides the floor, the heating, the water and drainage, the number of sockets and the ventilation. So first we agree what will be stored and what will be running inside, and only then choose the material.
Which outbuildings we build and how they differ
| Building | What matters | What we build in |
|---|---|---|
| Storeroom and shed | Dry, tidy, room to get a wheelbarrow in | A wide door without a threshold, shelving, cross-ventilation |
| Workshop | Light, sockets, dust and noise | A dedicated circuit from the house, a workbench by the window, extraction, non-combustible insulation |
| Pump room and plant room | Warmth in winter, water drainage, access to the equipment | A floor drain, insulation, heating with a thermostat, room for servicing |
| Log store | Airflow and protection from rain | Slatted walls, a raised floor, wide roof overhangs |
| Fuel and chemicals store | Vapours and fire | A separate entrance, ventilation, a location well away from living quarters |
A single 3×4 m building often combines a storeroom and a pump room. Then we separate the technical part with a partition and a door: the pump needs a dry, warm corner with a floor drain, and a lawnmower with a can of petrol has no business next to its electrics.
What we build with: block, frame or a prefabricated cabin
We build an outbuilding in block when it has to last as long as the house and look of a piece with it: the same facade, the same roof. Aerated concrete or pumice blocks are rendered on the outside. For an unheated shed foam concrete blocks will also do, if the batch comes with test reports: where they are appropriate and what they need is explained on the page about foam concrete buildings.
A framed outbuilding of steel sections or timber, clad in profiled metal sheeting or sandwich panels, goes up twice as fast and costs noticeably less. By the sea metal cladding will need inspecting, and a timber frame has to be kept off the ground. A prefabricated cabin made of insulated panels arrives ready-made, and a truck-mounted crane sets it on prepared foundations in a single day. It works as a site cabin during construction, a storeroom or a security hut, but the crane truck has to be able to reach the spot where it will stand.
Foundations and floor
Under a block outbuilding we lay a shallow strip foundation or a slab, and under a frame or a cabin more often concrete piers or screw piles, depending on the ground. We set the floor level higher than the yard: on a low-lying plot water stands for hours after a downpour, and a shed level with the ground collects it inside. There is waterproofing under the floor, and at the door a gentle ramp instead of a high threshold, so that you can wheel in a barrow or a lawnmower.
In a pump room or plant room the floor is concrete, with a fall towards a floor drain. The water heater's relief valve drips as the water heats up, and flushing a filter also produces water, which has to go into a drain, not under the wall. If there is nowhere to connect a floor drain, we make a sump from which the water is pumped out.
Pump room, water heater and plant room
With a surface pump, we put the pump room closer to the well or borehole: the shorter the suction line, the more reliably the pump draws water. If the pump is submersible and sits in the borehole itself, the pump room holds the pressure tank, the controls and the filters, and there is more freedom in choosing its location. We assemble the equipment with a pressure gauge and valves, so that any part of it can be removed without draining the whole system.
Which water filters you need is decided from an analysis of the borehole water. A surface pump can be heard, so we turn the door of the building away from the bedrooms and the guest terrace.
An electric water heater in a separate building frees up space in the house, but the hot water then has to be run along an insulated pipe, and over a long run it has time to cool. A gas boiler is put there only with the agreement of the gas company: the gas company connects the gas, and we don't touch the gas pipe. If the house stands empty in winter, the pump room is drained before you leave, following the procedure for seasonal winterising.
Workshop and storeroom: lighting, sockets, ventilation
A workshop with a saw, planer or welder needs a circuit with spare capacity, so we size the cable from the house for the most powerful tool together with the lighting, and put a small consumer unit with circuit breakers and an RCD by the entrance. Sockets above the workbench go at worktop height, in several groups, so that the saw and the vacuum cleaner don't trip the lighting. If the machines are three-phase, we check in advance whether the house supply has three phases: adding them later takes longer than laying the cable.
An uninsulated metal building drips from the ceiling: at night the profiled sheet cools down, moist air condenses on it in drops, and they fall onto the workbench and the shelves. So we use profiled sheeting with an anti-condensation layer on the underside or insulate the walls and roof, and in any outbuilding we put an air inlet low down and an extract under the roof. In a workshop where things are sanded and painted, we add an extractor fan, and the insulation is non-combustible mineral wool.
Log store
In Batumi's humid air firewood dries slowly, and a load delivered in autumn is often still damp by winter. So it is convenient to divide a log store into two bays: in one the new load dries, and from the other you take last year's wood. We put it in a well-ventilated spot, with the long side across the wind, and make the widest roof overhang on the side driving rain comes from.
We don't build a log store against the wall of the house or the bathhouse: a woodpile by a chimney or a window is dangerous if a spark flies, and it also keeps damp and insects against the wall. We choose a spot by the bathhouse or the barbecue so that the firewood is a few steps away but out of reach of the fire.
Where to put an outbuilding and what documents you need
We put an outbuilding where it is easy to reach with a wheelbarrow and to run a cable to, but where it doesn't block the view from the house or stand in the path of water coming down the slope. A shed or workshop may need only a notification, or it may need a permit: this is decided by the class of structure, which is covered in detail on the page about construction in Batumi. We take the setback from the neighbour's fence and from the building line from the registry extract and the zoning rules, and these questions are handled by our architect and our partner lawyer.
How much outbuildings on a plot cost in Batumi
A turnkey 3×4 m block outbuilding costs from 18,600 to 24,000 ₾. The price includes the foundations and floor, the walls, the roof, a door and a window, the exterior finish, lighting and sockets, and a shell like this works as a storeroom, workshop or pump room. A framed building of the same size in steel or timber, clad in profiled metal sheeting or sandwich panels, costs from 10,800 ₾. An insulated prefabricated cabin also costs from 10,800 ₾, plus delivery by truck-mounted crane and installation, from 1,740 to 3,000 ₾.
Pump room equipment is priced separately: the pump, pressure tank, filters and pipework cost from 5,700 to 8,400 ₾. Also priced separately are the cable run from the house, from 69 ₾ per linear metre in a trench, water and drainage, shelving and interior finishing. A heated pump room and a workshop with a high-capacity circuit cost more; a frame instead of masonry costs less. From photos of the spot and a description of what you need, we'll send a preliminary estimate within 24 hours on business days, and the final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed.
Stages and timelines
-
Job and location
1–2 days
We decide what will be stored and what will run in the building, where it will stand and how to bring the cable and water to it.
-
Sketch and estimate
1–2 weeks
Dimensions, material, division into compartments, sockets and a floor drain. We check the class of structure and the setbacks.
-
Foundations
1–2 weeks
A strip, slab, piers or piles to suit the ground, waterproofing and a sub-base for the floor.
-
Walls and roof
1–3 weeks
We lay the blocks or assemble the clad frame, and put on the roof with overhangs and gutters. A prefabricated cabin goes onto finished foundations in a day.
-
Services
3–7 days
The cable from the house, the consumer unit, lighting, sockets and ventilation. In a pump room, the floor drain and the pump and filter pipework.
-
Finishing and test run
2–5 days
The exterior finish, doors and shelving, if they are in the contract. We show you a test run of the pump on site or over a video call.
Local specifics in Batumi
In the wet months an unheated building takes on damp faster than the house: there is no heat inside to dry the air, and the walls and roof cool down at night. So in every outbuilding we provide cross-ventilation and never fit a solid door without a grille.
By the sea, salt eats through hinges, locks and cladding screws faster, so we use coated or stainless steel fixings, and the hinges are lubricated once a year. On a slope we don't place a building across the run-off: water from the plot above has to go round it along a ditch. In the Adjara highlands a pump room has to survive frost, so we insulate it on all sides, including the floor. Delivering a prefabricated cabin depends on the width of the street and the gate: the crane truck has to be able to drive in and turn round.
Materials and brands
Walls of aerated concrete or pumice blocks for a building in the same style as the house, of foam concrete blocks with test reports for a simple shed. The frame is galvanised steel sections or kiln-dried timber treated with preservative. The cladding is profiled metal sheeting with a thick zinc layer and a polymer coating, preferably with an anti-condensation layer on the inside, or sandwich panels with mineral wool.
The roof is metal roof tiles or profiled metal sheeting, and next to a house with a tiled roof it matches the colour of the house roof. Doors are metal, painted to withstand sea air, and a pump room door has a vent grille. We build the consumer unit with ABB or Schneider Electric circuit breakers, and choose light fittings and sockets protected against moisture and dust.
What makes up the cost
Timeline: a 3×4 m block outbuilding usually takes 4–6 weeks, a framed one 2–3 weeks, and a prefabricated cabin goes onto finished foundations in a day
- doors, windows and shelving to suit your equipment
What raises the cost
- a pump room with insulation, heating, a floor drain and equipment pipework
- a workshop with a dedicated high-capacity circuit and extraction
- a block building with the same facade as the house
- a long cable and water run from the house
What lowers the cost
- a frame clad in profiled metal sheeting instead of masonry
- a prefabricated cabin, if a crane truck can reach the spot
We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.
Get an estimateGuarantees
Outbuilding work has a 2-year warranty. Wiring, water pipes and drains concealed in the walls and floor, if we laid them, have a 5-year warranty. The pump, pressure tank, water heater and filters carry the manufacturer's warranty. Diagrams of the service runs and photos of concealed work go into the handover file, so that when the pump room is repaired it is clear where the cable and water run.
Questions and answers
How much does it cost to build a utility shed on a plot in Batumi?
A turnkey 3×4 m block utility shed costs 18,600–24,000 ₾: foundations and floor, walls, roof, a door and a window, the exterior finish, lighting and sockets. A framed building of the same size costs from 10,800 ₾, and an insulated prefabricated cabin also from 10,800 ₾, plus delivery and installation from 1,740 ₾.
Pump room equipment, the cable from the house, water and shelving are not included in this amount. We'll send a preliminary estimate from photos of the spot within 24 hours on business days, and the final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed.
Can a prefabricated cabin be installed without foundations?
Not straight onto the ground: the bottom of the cabin would sit in the damp, and after heavy rain it would tilt so that the door no longer closes. The minimum we do is concrete piers or blocks under the corners and under the middle of the long sides, on a compacted crushed stone bed, set level.
On an open plot by the sea we also fix the cabin to its supports, so that a storm wind can't shift it. We leave a ventilated gap underneath and lead roof water away to the side, so that it doesn't run in under the floor.
Can a shower or toilet be put in an outbuilding?
Yes, if water can be brought to the building and the waste taken away: to the mains sewer, the house septic tank or a separate treatment plant. We lay the run to a fall, and below frost depth where there are frosts in winter, and the building gets a wet area with a waterproofed floor and extraction.
A building like this comes closer to a dwelling, and we check its class and the zoning rules again. If you only need a shower in summer after the beach or the garden, it is often simpler to put an outdoor shower against the wall, with its own drain.
Can an outbuilding later be converted into a guest cottage?
Yes, but people will live in a guest cottage, so it needs insulated walls and roof, normal-sized windows, enough ceiling height, water, a sewer connection, its own electrical circuit and ventilation. A simple shed on piers clad in profiled sheeting can hardly be adapted for this, and it is easier to replace it.
If this is a possibility, tell us at the sketch stage. Then we put the building on a strip foundation or a slab from the start, lay sleeves for water and drains in the floor, and choose a cable with a spare cross-section. Before the conversion we check again against the zoning rules and the class of structure whether a dwelling is allowed in that part of the plot.
Can furniture and belongings be stored in a utility shed over the winter?
In an ordinary unheated shed in Batumi, upholstered furniture, mattresses, fabrics and paper will get damp over the winter and may go mouldy. To store things like these, we insulate the building, provide ventilation and fit a dehumidifier with its water piped to a drain.
Keep things on shelving or pallets, not right against the outside walls, and cover them with breathable covers, not plastic sheeting. Metal garden furniture, tools and tyres can be kept in a simple shed too, as long as it has cross-ventilation.
Related services
Terms used on this page
- Public Registry extract
- A document from Georgia's state registry: the owner, cadastral code, area, legal use and encumbrances of a property on the date of issue.
Further reading
Tell us what will be inside and send photos of the spot, and we'll price the building within 24 hours
We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.
Mon–Fri 10:00–19:00, Sat 11:00–16:00