Fitting a standing-seam metal roof on a private house near Batumi

Metal tile roofing in Batumi: sheet, installation and prices

We build metal tile roofing in Batumi for the coastal environment: sheet with heavy zinc and a coating the manufacturer warrants near the sea, an underlay membrane with a ventilation gap, coated fixings and cut edges made without an angle grinder. We lay it on existing rafters or together with them. A metal tile roof with materials starts from 200 ₾ per m².

from 200 ₾/m²on existing rafters: membrane, battens, sheet, ridges and junctions. The final price is confirmed once agreed.

  • Timeline: a 120–150 m² metal tile roof on existing rafters usually takes 2–3 weeks
  • Warranty: Metal tile installation has a 2-year warranty
Get an estimate

Who it’s for

  • You are building a house with a simple gable or hipped roof and a cold loft

  • An old asbestos sheet or tin roof is due for replacement

  • A house in the first blocks from the sea, where ordinary sheet turns rusty within a few years

  • A country or guest house that needs an affordable and quick roof

  • You have bought metal tile yourself and need a crew to install it

What’s included

  • slope measurement and sheet layout
  • choice of sheet and coating for the distance from the sea
  • breathable membrane and counter-battens
  • battens at the profile spacing
  • sheet installation with the manufacturer's fixing pattern
  • valleys, ridges, verge and eaves trims
  • junctions with walls, chimneys and roof windows
  • touch-up of cut edges and swarf clean-up

Prices: metal tile

from 200 ₾/m²

WorkPrice
Metal roof tile roofing, with materials200–240 ₾/m²
Metal roof tile installation (labour)34–42 ₾/m²
Breathable membrane and counter-battens under the covering, with materials27–36 ₾/m²
Removal of the old roof covering with disposal19–26 ₾/m²
Tubular snow guards, installed81–110 ₾/lin. m
Coated steel gutter system installed, per linear metre of eaves110–145 ₾/lin. m
Eaves and gable soffits in soffit panels or boards, with materials81–110 ₾/lin. m
Roof window, 78×118 cm, with flashing kit, installed1 500–1 920 ₾/pc

on existing rafters: membrane, battens, sheet, ridges and junctions. The final price is confirmed once agreed.

Metal tile roofing in Batumi: which sheet to choose

Metal tile is galvanised steel sheet with a polymer coating, pressed to look like rows of tiles. Metal tile roofing in Batumi lasts a long time if the sheet is chosen for the coastal environment rather than by price per square metre. For houses we use steel from 0.45–0.5 mm thick, a zinc coating no lower than the manufacturer specifies for aggressive environments, and a finish with a warranty valid at the distance from the sea where the house stands.

Coatings differ in thickness and durability. Gloss polyester is the cheapest and thinnest, matt polyester is thicker and scratches less during installation, and polyurethane-based coatings are thicker still and resist salt and ultraviolet better. For houses in the first blocks from the shore we offer the latter, and we check the manufacturer's warranty terms before ordering.

Profile, cutting and trimming

Sheets are ordered to the measured slope length so that the slope has no horizontal laps, or as few as possible. Profile height affects the look of the roof and the stiffness of the sheet: a tall profile holds its shape better in wind but costs more and is harder to work in valleys. On a hipped roof with hips and valleys there is more waste than on a simple gable roof, and that shows straight away in the estimate.

We cut sheets with metal shears or nibblers, never with an angle grinder: it burns off the zinc and coating along the edge, and the cut rusts first. Every cut edge is sealed with touch-up paint in the same colour, and swarf is swept off the roof the same day.

Underlay and ventilation

At night condensation forms under the sheet, especially in winter with high humidity. So metal tile is never laid straight onto battens on the rafters. First comes a breathable membrane, then counter-battens that give an air gap from eaves to ridge, and only then battens at the profile spacing. The ridge is ventilated, and the eaves have vents with mesh against birds and insects.

Fixings and wind

Sheets are fixed with roofing screws with a sealing washer, coated or stainless by the sea, in the colour of the sheet. We usually use 6–8 screws per m² in the middle of the slope and more at the eaves, gables and ridge, where wind off the sea presses harder. The screw goes into the trough of the profile and is tightened until the washer seals without being crushed: an overtightened screw leaks as badly as a loose one.

Details and trims

Valleys, wall and chimney junctions, verge and eaves trims are made of the same metal with the same coating. Under the bottom valley we lay a strip of continuous deck with underlay, and the top valley piece is set so that water does not run under it in a side wind. If the roof will have roof windows, we install them before the covering, in flashing kits for metal tile. Snow and water slide off smooth metal fast, so we fit snow guards over the entrance and paths and size the gutters with a margin.

Metal tile is cheaper than standing seam and simpler to install, but on low slopes and complex shapes standing seam is more reliable; see the standing seam roof page. How metal differs from bitumen shingles in noise and upkeep is covered in metal roof vs asphalt shingles.

How much a metal tile roof costs

A metal tile roof with materials on existing rafters costs from 200 ₾ per m²: membrane, counter-battens, battens, sheet, ridges, valleys and junctions. If you supply the material, metal tile installation starts from 34 ₾ per m², and removing the old covering with disposal from 19 ₾. Snow guards start from 81 ₾ per linear metre, a steel gutter system from 110 ₾ per linear metre of eaves. The final price is set after measuring the roof, once the estimate is agreed.

Stages and timelines

  1. Measurement and order

    3–7 days

    Slope survey, sheet layout, order of sheet and trims.

  2. Underlay

    1–3 days

    Membrane with laps, counter-battens, eaves vents.

  3. Battens

    2–4 days

    Battens at the profile spacing, extra timber at valleys and ridge.

  4. Sheet laying

    3–7 days

    Installation from bottom to top, fixing pattern, touch-up of cuts.

  5. Trims and handover

    2–4 days

    Ridges, valleys, trims, junctions, snow guards, inspection.

Local specifics in Batumi

By the sea metal rusts not from the face of the sheet but from places where the coating was damaged: cut edges, scratches from installers' boots, holes for surplus screws. So on finished sheet our crew walks only in soft shoes and in the troughs of the profile, and surplus holes are sealed with touch-up paint, never left open.

On old houses in Batumi and Adjara villages owners often want to keep the old battens from tin or asbestos sheets under the new metal tile. Their spacing almost never matches the profile of the new sheet, and the boards are often rotten at the eaves. We usually replace the battens entirely; it is cheap compared with chasing leaks.

Materials and brands

Galvanised steel sheet 0.45–0.5 mm with a polymer coating: matt polyester for houses further from the sea, polyurethane-based coatings for the seafront. Trims from the same steel with the same coating. A vapour-open breather membrane, battens from treated timber. Roofing screws with EPDM washers painted to match the sheet. We order touch-up paint together with the sheet batch so the shade matches. On complex roofs sheet and trims come from one batch: batches can differ slightly in colour, and after a couple of years in the sun it shows.

What makes up the cost

Timeline: a 120–150 m² metal tile roof on existing rafters usually takes 2–3 weeks

  • height of the house and lifting the sheets

What raises the cost

  • complex roof shape and a lot of waste
  • sheet with a coating for coastal conditions
  • replacing old battens and removing the covering
  • roof windows and many chimneys

What lowers the cost

  • simple gable roof without valleys
  • client's material, installation only

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

Metal tile installation has a 2-year warranty. The sheet and coating carry the manufacturer's warranty; we check its terms for distance from the sea before ordering. The sheet layout and photos of details are handed over in the roof file.

Questions and answers

How much does a metal tile roof with installation cost in Batumi?

A metal tile roof with materials on existing rafters costs from 200 ₾ per m²: membrane, battens, sheet and trims. If you already have the sheet, installation starts from 34 ₾ per m². Rafters, insulation and gutters are priced separately. The final price is set after measuring the roof, once the estimate is agreed.

What thickness of metal tile is needed for a house?

For a house we use sheet from 0.45–0.5 mm. A thin 0.4 mm sheet is cheaper but dents more easily during installation and underfoot, and vibrates more in wind. Steel thickness matters, but by the sea the zinc coating and the type of finish matter just as much: a thin gloss coating on a thick sheet still fails quickly.

Can metal tile be laid over old asbestos sheets?

Technically yes, but we do not do it. Under the old sheets you cannot see the condition of the battens and rafters, and the old batten spacing does not match the new profile. The load on the rafters also increases. We remove the old covering, check the timber, fit a membrane and new battens.

Why does metal tile rust at the edges?

Because the cuts were made with an angle grinder or were not sealed with paint. An abrasive disc burns off the zinc and coating for a centimetre from the cut, and in salty air rust appears there quickly. The second reason is swarf left on the roof: it rusts and leaves orange stains on the sheet.

How many screws are needed per square metre of metal tile?

We usually use 6–8 per m² in the middle of the slope and more along the edges: at the eaves, gables and ridge. The exact pattern comes from the sheet manufacturer, and by the sea we do not reduce it. Not only the number matters but the tightening: the washer should sit flat against the sheet without tilting.

Further reading

Send us the house dimensions or roof photos: we will price metal tile in 24 hours

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site