Stage payments for house construction in Batumi: payment schedule, phases, mothballing

Stage payments for house construction are simple: an advance for materials and the first stage, then a payment only after each stage is accepted against a signed record. If the budget comes together gradually, the house can be built in phases and mothballed in between. We do not lend or charge interest; you pay for finished work. A turnkey house with payment by stages from 1 680 ₾ per m².

from 1 680 ₾/m²a mid-range turnkey house with payment by stages after acceptance. The final price is confirmed once agreed.

  • Timeline: a house with stage payments usually takes 8–14 months without breaks, or two years or more in phases
  • Warranty: We give a 2-year guarantee on the work done
Get an estimate

Who it’s for

  • You do not want to pay for the whole house up front

  • The budget comes together gradually and it is easier to build in phases

  • You are taking a bank loan and the schedule must fit the tranches

  • You live outside Georgia and want to pay after acceptance by video

  • The build has stopped and the house needs mothballing until the next stage

What’s included

  • a stage payment schedule in the contract
  • a list of acceptance points for each stage
  • an account of the advance: invoices and delivery notes
  • dividing the build into phases
  • mothballing the house between phases
  • repricing the next phase by the rule in the contract
  • video acceptance of stages for those outside Georgia

Prices: stage payments

from 1 680 ₾/m²

WorkPrice
Turnkey house, mid-range1 680–1 860 ₾/m²
House shell (black frame), masonry690–840 ₾/m²
White frame (house ready for finishing)1 050–1 320 ₾/m²
Mothballing an unfinished house between stages: temporary roof, closing openings, protecting rebar starters2 820–4 200 ₾
Looking after a mothballed site: visits and photo reports, per month330–480 ₾/month
Remote construction monitoring with photo and video reports, for the whole project4 500–6 000 ₾/project

a mid-range turnkey house with payment by stages after acceptance. The final price is confirmed once agreed.

Stage payments for house construction: pay for what you have accepted

Stage payments for house construction mean you do not pay for the whole house up front. The advance goes on materials and the first stage, and each further payment is made after the stage has been accepted against a signed record. That way the money always follows completed work rather than running ahead of it. If the budget comes together gradually, the house can also be built in phases: the shell first, the roof and windows a year later, then the finishes. Below is how this works and what to agree in advance.

An example payment schedule

StageShare of the house priceWhen you pay
Advance10–15 %On signing the contract, for materials and preparation
Foundation10–15 %After acceptance of the reinforcement and concrete
Shell20–25 %After acceptance of the walls and floors
Roof and windows15–20 %When the house is closed against rain
Services and facade15–20 %After the services have been tested
Finishes and handover10–15 %After final acceptance and the snagging list is cleared

This is an example for a turnkey house. The exact shares depend on the design and are written into the contract, but the rule is the same: the next payment comes only after the record for the previous stage. How stage acceptance itself works is on the how we work page.

What the advance is for

The advance covers the materials and work of the first stage, as well as long-lead orders that have to be paid to the manufacturer in advance, such as windows or steelwork. We show you what it was spent on: suppliers' invoices and delivery notes. We do not take prepayment for the whole house. If a contractor asks for half the price up front, that is a reason to ask questions before signing the contract, not after.

Building a house in phases

If the money comes together gradually, it is convenient to divide the build into self-contained phases. The first phase is usually the foundation and shell, the second the roof, windows and facade, the third the services and finishes. Where you stop matters: in Batumi a shell without a roof gets through winter badly, with water standing on the floors and soaking into the masonry. So it is better to take the first phase to a weathertight shell, even if that means simplifying something in the finishes. What the house shell includes is on the house shell page.

Mothballing between phases

  • a temporary roof or a tight cover over the top floor;
  • window and door openings closed up;
  • rust protection for rebar starter bars;
  • drainage of water away from the foundation;
  • site visits and photo reports while the build is paused.

After a long pause, before work resumes, we inspect the house for cracks, rust and damp in the masonry. If someone else built the first phase, we start with a structural inspection and only then price the next phase.

Prices between phases

A fixed price in the contract applies to stages that run without a break. If a year passes between phases, the prices of materials and labour will have changed, so the next phase is repriced from a current estimate before it starts. To avoid surprises, the repricing rule is written into the contract in advance: what is fixed and what is repriced from suppliers' invoices. More about the contract clauses on the turnkey construction contract page.

This is not credit

Stage payments are not an instalment plan in the banking sense: we do not lend money or charge interest. You pay for completed stages from your own funds. If you need a loan, it is taken from a bank, and then we fit the payment schedule to the release of the tranches. A developer's instalment plan when buying an apartment works differently; there is a comparison on the payment plan or mortgage page.

If you are not in Georgia

Stages can be accepted over video call: the site manager goes through the list and shows everything the stage covers, then you sign the record and make the transfer. Payments are made by bank transfer to the company's account, and no cash changes hands on site. Remote monitoring with photo and video reports for the whole project can be ordered separately; more on the remote construction page.

How much a house with stage payments costs

A mid-range turnkey house with payment by stages costs from 1 680 ₾ per m². If you build in phases, a masonry house shell from 690 ₾ per m², a white frame ready for finishing from 1 050 ₾ per m². Mothballing an unfinished house between phases from 2 820 ₾, looking after a mothballed site from 330 ₾ per month, remote construction monitoring with photo and video reports for the whole project from 4 500 ₾. The final cost is set from the design and after agreeing the estimate and the phasing schedule.

Stages and timelines

  1. Estimate

    1–3 weeks

    Prices of stages and phases.

  2. Contract

    3–10 days

    Payment schedule, acceptance points.

  3. Advance

    1–3 days

    Materials and the first stage.

  4. Stages

    8–14 months

    Work, record, payment.

  5. Handover

    2–4 weeks

    Final acceptance, balance.

Local specifics in Batumi

Many houses in Adjara are built over years: the shell goes up in one season and then stands without a roof or windows until there is money for the next stage. In the local climate that is costly. Rainfall is over 2 400 mm a year, water stands on open floors and soaks into the masonry, rebar starter bars rust, and before work resumes some of it has to be redone.

So if a build will go in phases, we plan the first one up to a weathertight shell: with a roof, windows or at least tightly closed openings. During the pause we mothball the house and come once a month to check that everything is in order, especially after heavy downpours and wind off the sea.

Materials and brands

Payment documents: the contract with a stage payment schedule, the estimate with the price of each stage, the list of acceptance points, stage acceptance records with photos, invoices and delivery notes for the advance, addenda for changes and the repricing of the next phase. For mothballing: a temporary roof of membrane or profiled sheeting, sheeting and boards over openings, corrosion protection for rebar starter bars, drainage away from the foundation and a photo report after each visit.

What makes up the cost

Timeline: a house with stage payments usually takes 8–14 months without breaks, or two years or more in phases

  • number of phases, length of pauses and condition of the house

What raises the cost

  • many phases with breaks
  • a long pause without a weathertight shell
  • repricing between phases
  • complex mothballing of an open shell

What lowers the cost

  • a build without breaks
  • a first phase taken to a weathertight shell

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

We give a 2-year guarantee on the work done. Concealed pipes, wiring and fittings are covered for 5 years. The guarantee on each phase starts from its acceptance, not from the end of the whole build.

Questions and answers

How much does a house with stage payments cost?

The payment schedule does not change the price: a mid-range turnkey house costs from 1 680 ₾ per m², a masonry shell from 690 ₾ per m², a white frame from 1 050 ₾ per m². If the build goes in phases, mothballing from 2 820 ₾ and site care from 330 ₾ per month are added. The final cost is set from the design and after agreeing the estimate and the phasing schedule.

What advance do you take?

The advance covers the materials and work of the first stage, usually 10–15 % of the house price. If the first stage includes long-lead orders, such as windows or steelwork that the manufacturer makes against prepayment, the advance can be larger, and that is visible in the estimate. We show what the advance was spent on with suppliers' invoices and delivery notes.

Can I build the shell now and the rest a year later?

Yes, but it is better to take the first phase to a weathertight shell: a roof, windows or tightly closed openings. An open shell in Batumi gets through winter badly, with water standing on the floors and soaking into the masonry. Between phases we mothball the house, and the next phase is repriced from a current estimate by the rule written into the contract.

Is this an instalment plan?

No, we do not lend money or charge interest. You pay from your own funds for stages you have already accepted. If you need a loan, it is taken from a bank, and we fit the payment schedule to the release of the tranches and provide the estimates and records that the bank asks for on the build.

How do I pay if I am not in Georgia?

You accept the stage over video call: the site manager goes through the list and shows everything the stage covers, you sign the record and make a bank transfer to the company's account. Nobody needs to hand over cash on site. A photo and video report arrives once a week, so by the time of acceptance you already know how the work went.

Terms used on this page

White frame
An apartment after rough work: partitions, plaster, screed, electrical and water points, but no finishing or sanitary ware.

Further reading

Send the design and budget: we will split the build into stages and phases within 24 hours

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site