RU EN KA

Next Collection in Batumi

Next Collection is a 15-floor Next Group complex at 39 Tamar Mepe Avenue, in the north of Batumi, by the sea. According to the developer, apartments from 35 m² are sold without finishing, completion is planned for 2026–2027, and sources give 750 or 950 apartments. We check the contract and construction stage, accept the apartment and renovate it.

The complex at a glance

Developer
Next Group
Address
39 Tamar Mepe Ave
District
Tamar Mepe
Floors
15
Handover condition
black frame

Address, number of floors, apartment sizes, handover condition and shared facilities from the developer's descriptions. The number of apartments (750 or 950) and the completion date (summer 2026 or July 2027) differ between sources, so they are not in the table. We check everything against the contract and the building permit.

Next Collection is a complex by the developer Next Group at 39 Tamar Mepe Avenue, in the north of Batumi. The developer says the building stands right on the shoreline. According to its descriptions, the complex has 15 floors, with apartments from 35 m² sold without finishing. The number of apartments differs between sources: 750 or 950. Completion is planned by the developer for 2026–2027, and different listings give different dates.

Next Collection: a complex by the sea in the north of the city

The north of Batumi is built up differently from the resort south. Along Tamar Mepe Avenue Soviet blocks, private houses with yards, warehouses and new complexes stand side by side, and nearby are Batumi-Central station and the road to Makhinjauri and Kobuleti. Fifteen floors is a lot for such a quarter and average for Batumi, and this gives different conditions from 40–50-floor towers: fewer apartments per lift and less wind on the upper floors, but not every floor has a sea view.

The complex description lists a pool, a spa, a gym, a playground, a restaurant, parking, a reception and CCTV. What will work by the time the keys are handed over and what will open later we check by the contract and on site. We also look at whether the developer already has completed buildings and how their handover went.

Deadlines and construction stage

Dates in the sources differ: some catalogues set completion for summer 2026, others for July 2027. So we check the deadline not by advertising but by the contract with the developer: what date is written, what the penalty for delay is and how the apartment's condition at handover is fixed. How buying off-plan works is described on the page about off-plan apartments. If the apartment is bought on instalments, we read the payment schedule and when the buyer becomes the owner; more on the page about developer instalment plans.

Next Collection: handover and renovation

Apartments are handed over without finishing, so after completion they have to be accepted: area, ceiling height, flatness of the slabs, windows, service connections. Defects go into the certificate before signing. How we carry out such an acceptance is described on the page about accepting an apartment from the developer. After it, renovation from the shell begins; its order is described on the page about black frame renovation.

To live or to let

The Tamar Mepe area lives all year, and apartments here are more often bought for living and long lets than for daily letting. If the building really stands right by the shore, summer demand from tourists will be added. We estimate letting income after completion, from the real occupancy of similar apartments in the area.

Renovation in this complex

Apartments are handed over without finishing, and renovation starts after the building is completed and the apartment accepted by a certificate. Before that a design can be prepared: layout, wiring, lighting, kitchen, and then work starts as soon as the keys are received.

By the sea in the north of the city humidity is high and the air salty, so for windows, balconies and outdoor air conditioning units we use fittings and fixings that do not rust. In a new building dozens of apartments are renovated at once in the first years, and we build the queue at the service lift into the schedule.

Rentals and management here

The area lives all year, and demand for long lets here is steadier than for daily lets. In summer, if the building really is by the shore, tourists will be added, and then daily lets in season can be combined with a winter let.

When the apartment is ready, we will choose the letting format, prepare the apartment, run listings and contracts, meet guests and tenants and send the owner a report once a month.

Questions and answers

Where is Next Collection?

At 39 Tamar Mepe Avenue, in the north of Batumi, not far from Batumi-Central station and the road to Makhinjauri. The developer says the complex stands right on the shoreline. The area is mixed: Soviet and private houses, new complexes, warehouses, so around the building we also look at what may appear on neighbouring plots.

When will Next Collection be completed?

Different sources give different dates: summer 2026 or July 2027. So we rely only on the deadline written in the contract and on the penalties for delay. Before purchase we look at the building permit and at what has actually been built on the plot today.

In what condition will the apartments be handed over?

According to the developer, without finishing. This means that after acceptance the apartment will need full renovation: rough work, all building services, finishes, the kitchen and furniture. A renovation design can be prepared in advance while the building is being finished, and then work will start as soon as the keys are received.

Is an apartment in Next Collection suitable for letting?

The Tamar Mepe area lives all year, so long lets work well here. If the building really stands right by the shore, summer demand from tourists will be added. We estimate income after completion from the real occupancy of similar apartments, not from advertising promises.

Tell us about your project, and we’ll work out the timeline and budget

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site