Prefabricated buildings in Georgia: warehouses, shops and workshops in Batumi

We build prefabricated buildings in Georgia on a steel frame with sandwich panels, from arched steel sheet and from prefabricated cabins: for a warehouse, a shop, a workshop, a production hall or a car service centre. The parts are made at the factory while the foundations go in on the plot, and the shell is assembled in a matter of weeks. A turnkey building costs from 840 ₾ per m², with heating, ventilation and utilities beyond the plot extra. The design, ground survey and permit are the same as for a masonry building.

from 840 ₾/m²steel frame, insulated walls and roof, concrete floor, loading doors and lighting, excluding heating. The final price is confirmed once agreed.

  • Timeline: a 500–1,000 m² warehouse or workshop usually takes 2–4 months on the plot, of which the shell takes 4–6 weeks; a prefabricated cabin goes up in a day; the design and permit before that take 2–4 months
  • Warranty: Installing the frame, panels and doors carries a 2-year warranty
Get an estimate

Who it’s for

  • You need a warehouse or workshop by a set date, and masonry can't be finished in that time

  • A tenant of a retail pavilion is waiting to open in time for the summer season

  • A farmer in Adjara needs an insulated building for crops or a shelter for machinery

  • A construction firm needs site cabins, a storeroom and a security hut on site

  • You have a plot by the main road for a car service centre, and for now the budget covers the shell

What’s included

  • Choosing the building system to suit the job, the loads and the plot
  • Ground survey and design, with the frame calculated for wind, snow and seismic loads
  • Documents for a notification or a permit, depending on the class of structure
  • Ordering the steel, panels and loading doors from manufacturers to our drawings
  • Column foundations with anchors set to the factory drawing
  • Erecting the frame, walls and roof by crane
  • Industrial floor, loading doors, lighting and electrics
  • Gutters, a paved apron and the hardstanding by the doors, as per the estimate
  • A handover file: drawings, acceptance certificates, photos of the anchors and connections

Prices: prefabricated buildings

from 840 ₾/m²

WorkPrice
Turnkey warehouse: steel frame, sandwich panels, industrial floor, doors, lighting840–1 080 ₾/m²
Steel frame warehouse or hangar shell with sandwich panels (frame, walls, roof, column foundations)580–780 ₾/m²
Cold steel frame hangar with profiled metal sheeting, uninsulated385–505 ₾/m²
Frameless arched steel sheet hangar, per m²275–310 ₾/m²
Building steel frame (columns, beams, bracing): fabrication, priming, erection, per m² of floor area380–540 ₾/m²
Turnkey industrial concrete floor with dry-shake topping115–145 ₾/m²
Insulated sandwich panel cabin (storeroom, site welfare cabin, security hut)10 800–14 400 ₾/pc
Turnkey modular house (factory-built)1 830–2 100 ₾/m²

steel frame, insulated walls and roof, concrete floor, loading doors and lighting, excluding heating. The final price is confirmed once agreed.

Prefabricated buildings in Georgia are most often built on a steel frame with walls and a roof of sandwich panels, less often from arched steel sheet or from prefabricated cabins. The speed comes from the order of work: the parts are made at the factory to drawings while the foundations are being poured on the plot, and on site they are assembled by crane with bolts. We choose the system to suit the job, prepare the design, order the steel and panels from manufacturers and run the erection through to handover.

Where the speed comes from

In a masonry building the stages follow one another: the concrete gains strength, the blockwork waits for the floor slab, and the plaster waits for the wall to dry. With a prefabricated building, most of the work moves off the plot and into the workshop. Columns, trusses and purlins are cut and drilled at the factory, the panels arrive with their coating and insulation already in place, and all that is left on the plot is to lift them by crane and tighten the bolts.

There is almost no wet work on site apart from the foundations and the floor, so rain disrupts the schedule less. We usually erect the shell of a 500–1,000 m² warehouse or workshop in four to six weeks, and a prefabricated cabin goes onto ready supports in a day.

What doesn't get faster

The time saved is on the shell. Surveys, design and paperwork take as long as for a masonry building: the ground survey is the same, the frame is still designed for wind, snow and seismic loads, and the permit is issued according to the class of structure, as described on the page about construction in Batumi and Adjara. There are also delays of its own:

  • the steel and panels are cut to finished drawings, and a change after production has started means remaking the parts;
  • the factory has its own queue, and panels in a non-standard colour or thickness take longer;
  • erection starts once the foundation concrete has gained strength;
  • the loading doors, the windows and the grid power connection often come last and hold up the handover.

So we order the doors and apply for the power connection straight after the permit is granted, together with the steel order.

The systems we offer

SystemWhat it suitsLimitations
Steel frame and insulated sandwich panelsWarehouse, shop, workshop, car service centre, gymBy the sea the steel needs protection, and the roof is designed against wind uplift
Frame with uninsulated profiled metal sheetingShelter for machinery and materialsCondensation under the roof, no controlled climate inside
Frameless arched hangar of steel sheetSeasonal storage, farm produceHeight is lost at the walls, insulation and extensions are difficult
Prefabricated cabins made of sandwich panelsSite cabin, security hut, storeroom, temporary officeSmall rooms, access needed for a truck-mounted crane
Factory-built modules with finishesOffice, housing, guest cabinsModule size limited by the road, joints need maintenance

For a small building with short spans the frame is sometimes made of light galvanised sections, while large spans call for hot-rolled steel, and where the line falls is shown in the comparison of structural steel vs light gauge steel. Painting, galvanising and fire protection of the frame are covered on the page about hot-rolled steel frames, and the insulation, thickness and joints of the panels on the page about sandwich panel buildings.

Which solution for which job

  • Warehouse: clear height for racking, a slab for forklifts, loading doors and turning room for an articulated lorry, all covered on the page about warehouse construction.
  • Shop or pavilion: shop windows, an entrance area and a facade that doesn't make the building look like a warehouse.
  • Workshop and car service centre: an overhead crane, electrical capacity, extraction, a floor laid to falls with drains.
  • Agriculture: insulation and ventilation to suit the produce, or a cold building for machinery, as with hangars for machinery and crops.
  • An office on the plot or staff accommodation: factory-built modules are more convenient here, as described on the page about modular houses.

Wind, salt and earthquakes for a light building

In an earthquake a light building takes a smaller load than a masonry one of the same floor area, so on the coast the wind is often the governing load for a frame with panels. Seismic loads are still calculated under the Georgian seismic building code (PN 01.01-09), and the fixings of an overhead crane, a mezzanine and tall racking are checked separately. In a storm a wide roof acts like a wing, and the wind pulls it upwards off the purlins. So we design the column anchors for uplift, put the fixings closer together at the roof edges and corners than in the middle, and don't take out bracing to make room for vehicles.

By the sea we protect the steel with hot-dip galvanising or a multi-coat paint system, choose panels made of steel with a more durable polymer coating, and paint over cut edges. A cold building clad in profiled sheeting collects condensation under the roof, and if what is stored inside can't take drips, it needs an anti-condensation layer or insulated panels.

Foundations and floor: where the schedule waits for concrete

A prefabricated building involves two wet processes, and both hold up the schedule. The pad foundations for the columns are poured while the factory is cutting the steel, and by the time the frame arrives the concrete must have reached the strength set by the structural engineer. We set the anchor bolts with a template made from the factory drawing, otherwise the first day of erection goes on reworking the connections.

The floor is poured last, under the finished roof, and it takes a noticeable share of the time and the budget. The base is replaced and compacted as the ground survey requires, the slab is designed for machinery and racking, and after pouring it needs time before a forklift can drive on it. The hardstanding in front of the doors, which stays open to the sky, is scheduled for dry weeks.

Extension, relocation and the building's status

A prefabricated building is easy to extend. If an extension is likely, we design the end frame for a future bay from the start and leave room for the next columns in the site plan: the new section can then be added to the end without taking the wall apart. A bolted frame can also be moved, but on another plot that is a new build with its own foundations and paperwork.

Prefabricated doesn't mean temporary. A building on foundations with a steel frame goes through classification, design and a permit, and at the end acceptance into use, where it is required, and registration in the Public Registry. We don't count on a notification instead of a permit until the class has been confirmed from the design with the architect and our partner lawyer.

How much prefabricated buildings cost in Georgia

A turnkey prefabricated building, such as a warehouse, workshop or shop, costs from 840 to 1,080 ₾ per m². The price includes the steel frame, insulated sandwich panels for the walls and roof, an industrial concrete floor, loading doors and lighting. Heating, ventilation and utility connections beyond the plot boundary are not included in this price, and the design is priced as a separate line.

A shell on a steel frame with panels and column foundations, without the floor and doors, costs from 580 ₾ per m², a cold building with profiled sheeting from 385 ₾, and a frameless arched hangar from 275 ₾. An insulated prefabricated cabin costs from 10,800 ₾ each, and an office or accommodation made of factory-built modules with finishes from 1,830 ₾ per m². Costs go up with a large span, tall doors, fire walls and a plot by the sea, and come down with a cold shell of simple shape. We send a preliminary estimate within 24 hours on business days, and the final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed.

Stages and timelines

  1. Brief and system

    1–2 weeks

    What will be inside, what spans, height and doors are needed, and which system fits: a frame with panels, a cold building, an arch or cabins.

  2. Surveys and design

    3–6 weeks

    Ground survey, frame calculation, steel drawings and the panel layout for the factory.

  3. Paperwork and orders

    1–2 months

    We submit the package for the class of structure, and once the permit is granted we order the steel, panels, doors and power connection.

  4. Foundations

    3–5 weeks

    Pad foundations and anchors to the factory drawing, while the frame is being fabricated in the workshop.

  5. Erecting the shell

    4–6 weeks

    Columns, trusses and bracing, panel walls and roof, gutters and doors.

  6. Floor, lighting and handover

    3–5 weeks

    A concrete floor under the finished roof, electrics and lighting, the completion certificate and the handover file.

Local specifics in Batumi

In Batumi a prefabricated building gains most over masonry in autumn and winter: the frame and panels go up even in drizzle, while masonry and cast-in-place concrete come to a halt in prolonged rain. What gets in the way is something else: storm winds off the sea. The wind swings a long panel round on its slings, and on such days we stop erecting the walls and roof, so we build storm days into the schedule as a reserve.

Panels are delivered in stacks a few days before erection. In humid air a stack must not be left on the ground under airtight plastic sheeting: water collects between the sheets, and the coating is damaged before the panels are even installed. We set the stacks on bearers at a slight slope, cover them from above and make sure the mineral wool edges don't get wet. On plots right by the shore, where the wind carries salt, we touch up any scratches down to the metal straight after unloading.

Materials and brands

We order the steel for the frame from the factory to our drawings: hot-rolled sections for halls with a large span, galvanised light gauge sections for small buildings. For plots by the sea the steel leaves the factory already protected as the design specifies, and we use hot-dip galvanised bolts and anchors.

The walls and roof are usually clad in sandwich panels: with mineral wool where the design calls for non-combustible walls, and with PIR where it allows. A cold building only needs profiled sheeting with an anti-condensation layer. A prefabricated cabin arrives with the insulation, window, door and electrics fitted at the factory, and we check its panel thickness and its base frame, which is what it rests on at the plot.

What makes up the cost

Timeline: a 500–1,000 m² warehouse or workshop usually takes 2–4 months on the plot, of which the shell takes 4–6 weeks; a prefabricated cabin goes up in a day; the design and permit before that take 2–4 months

What raises the cost

  • a large column-free span and tall loading doors
  • fire walls of mineral wool panels
  • a plot by the sea with heavier protection for the steel
  • weak ground under the floor slab
  • a facade on a subframe for a shop or office

What lowers the cost

  • a cold building of profiled sheeting without insulation
  • a simple rectangular shell with a standard column spacing

We prepare the exact estimate from measurements and photos. It’s free and comes with no obligation.

Get an estimate

Guarantees

Installing the frame, panels and doors carries a 2-year warranty. The floor has the same warranty. Cables, water pipes and drains that we lay in the floor and walls are covered by a 5-year warranty. Panels, doors, light fittings and prefabricated cabins carry the manufacturer's warranty. We collect the manufacturers' documents in the handover file, together with photos of the anchors and frame connections.

Questions and answers

How much does a prefabricated building cost per m² in Georgia?

A turnkey building on a steel frame with insulated sandwich panels, an industrial floor, loading doors and lighting costs from 840 to 1,080 ₾ per m². A shell without the floor and doors costs from 580 ₾ per m², a cold building with profiled sheeting from 385 ₾, and a frameless arched hangar from 275 ₾. Heating, ventilation, the design and utility connections beyond the plot are priced separately.

On a large, simple shell the price per metre comes out lower, while a wide span, tall walls and every extra door push it up. We send a preliminary estimate from a description of the job and photos of the plot within 24 hours on business days. The final cost is set on the basis of the design, after a visit to the plot and once the estimate is agreed.

Can you live in a prefabricated building?

We don't recommend a sandwich panel warehouse or workshop as a permanent home. Thin metal walls do little to stop sound, the layout is tied to the column grid, and in summer the cladding gets very hot in the sun. Inside such a building you can partition off a room for security or staff: insulated partitions, a bathroom, ventilation and air conditioning.

If you need a house that goes up quickly, it is better to look at a modular house, a timber frame house or a house on a light gauge steel frame. There the wall is designed for living in: the insulation, vapour barrier and finishes are chosen for the humid climate, and the layers of lining damp sound between rooms.

Can a prefabricated building have two storeys?

Yes. The steel frame is designed for two levels from the start, and the floor between them is made of profiled steel decking with concrete on steel beams, or a lighter build-up if the upper level is an office with no heavy loads. A common and cheaper option is a mezzanine inside a single-storey hall for an office or staff rooms.

A second level changes a lot. The columns and foundations get heavier, and you need a staircase with a balustrade, escape routes and fire protection for the floor, plus sound insulation between the levels if there is noisy production downstairs. A second level can also change the class of structure, so we decide on it at the sketch stage and check it with the architect.

Can a prefabricated building be put up in the rainy season?

Yes. The frame and panels can be erected in drizzle; we stop in strong wind and thunderstorms, when working with a crane and on the roof is dangerous. Dry spells are needed for pouring the foundations and the floor, and the floor is poured under the finished roof anyway, so rain hardly delays it.

If the build falls in autumn and winter, we try to pour the foundations before the long rains, and we leave a reserve in the schedule for storm days. We don't keep foundation excavations open longer than necessary: water washes out the bottom, and it then has to be cleaned out again before the concrete goes in. We install the roof so that no row of panels is left open at the end of the day.

Can a prefabricated building be clad so that it doesn't look like a warehouse?

Yes, and for a shop or office by the road it is worth doing. The simple route is panels with concealed fixings, laid horizontally, in two or three colours instead of one. Beyond that come cassettes, fibre cement or timber panels on a subframe, glazed curtain walling at the entrance and a canopy over it.

A facade on a subframe adds weight and wind load, so we include it in the frame calculation from the start. If the face of the building matters for the business, we draw the facade at the sketch stage together with the signage and lighting, so that the fixings for them are put in while the panels are being installed.

Further reading

Tell us what will go in the building and send photos of the plot, and we'll suggest a system and an estimate

We reply within an hour during business hours. Message us or leave a request: we’ll call you back, go over the details and suggest the next step.

Mon–Fri 10:00–19:00, Sat 11:00–16:00

Estimate within one business day

Step 1 of 3
Property type
Current condition
Step 2 of 3
When to start
    Step 3 of 3
    Preferred contact method

    How would you like to reach us?

    We’ll call you back at a time that suits you

    Preferred contact method
    Best time to call

    Search the site